Skip to main content

Written questions

Search written questions to Ministers and the replies they have received.

Filters
Asked by All MPs
Minister Chris Bishop · Member for Hutt South · National Party · Associate Minister for Sport and Recreation / Member for Hutt South · National Party · Associate Minister of Finance / Member for Hutt South · National Party · Attorney-General / Member for Hutt South · National Party · Leader of the House / Member for Hutt South · National Party · Minister for Infrastructure / Member for Hutt South · National Party · Minister of Housing / Member for Hutt South · National Party · Minister of Transport / Member for Hutt South · National Party · Minister responsible for RMA Reform
Portfolio All portfolios
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 601 to 650 of 3241 written question sets.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What items, if any, have been repurposed from other agencies for use in the premises of the Ministry for Cities, Environment, Regions and Transport (MCERT), and from which agencies were they obtained?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that workstations and desk monitors from the New Zealand Transport Agency have been removed and are currently in storage. The Ministry of Education will be leaving furniture and ICT equipment in 1 The Terrace, which will be…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What amount, if any, is budgeted for any period during which rent is payable on both the vacated premises and the new premises of the Ministry for Cities, Environment, Regions and Transport (MCERT)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

None.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What amount, if any, is budgeted for make-good, reinstatement or exit costs at premises vacated by the Ministry for the Environment, the Ministry of Housing and Urban Development or the Ministry of Transport as a result of their merger…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that the former Ministry of Housing and Urban Development had a budget of $856,000 in relation to exit costs of premises which will be vacated. $130,000 of this relates to make good provisions which existed before the creation…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    Has an agreement to lease or a lease been executed for the premises of the Ministry for Cities, Environment, Regions and Transport (MCERT); if so, on what date, for what term, and at what annual rent?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that the Ministry for Cities, Environment, Regions and Transport (MCERT) will be taking over the lease for space currently occupied by the Ministry of Education and part of another lease for space currently occupied by the…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What amount, if any, has been spent, and what amount is budgeted, on physically relocating staff, furniture and equipment into the premises of the Ministry for Cities, Environment, Regions and Transport (MCERT)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that no staff, furniture, or equipment have yet been relocated into the Ministry for Cities, Environment, Regions and Transport's (MCERT) new premises, with no costs incurred as a result. No detailed cost plan or budget for…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What amount, if any, has been spent since 1 December 2025 on workplace strategy, occupancy planning or change management advice relating to the accommodation of the Ministry for Cities, Environment, Regions and Transport (MCERT)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

None.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many external consultants or contractors, if any, are engaged on the accommodation project for the Ministry for Cities, Environment, Regions and Transport (MCERT), and what is the total value of those engagements?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that there are no consultants or contractors external to government which are engaged on the accommodation project for the Ministry for Cities, Environment, Regions and Transport as at 13 August 2026.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What amount, if any, has been spent since 1 December 2025 on project management, quantity surveying or cost consultancy relating to the accommodation of the Ministry for Cities, Environment, Regions and Transport (MCERT)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that there has been no expenditure incurred to date on project management, quantity surveying, or cost consultancy related to the accommodation of the Ministry for Cities, Environment, Regions and Transport. The cost for…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What amount, if any, has been spent since 1 December 2025 on architectural, interior design or space-planning services for the premises of the Ministry for Cities, Environment, Regions and Transport (MCERT)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that the Ministry for Cities, Environment, Regions and Transport (MCERT) and Government Property Office have not engaged and do not plan to engage external architectural, interior design, or space planning services for the…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What amount of expenditure, if any, relating to the premises of the Ministry for Cities, Environment, Regions and Transport (MCERT) has been committed or contracted but not yet incurred, as at 5 August 2026?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that there is no committed or contracted expenditure relating to the premises of Ministry for Cities, Environment, Regions and Transport which has not yet been incurred.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What is the current forecast total cost of the fit-out, tenancy and relocation of the Ministry for Cities, Environment, Regions and Transport (MCERT)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I am advised that the current forecast total cost of the fit-out, tenancy, and relocation of the Ministry for Cities, Environment, Regions and Transport (MCERT) is around $19.7 million. This is based on current forecast fit-out and…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the estimated impact on National Land Transport Fund revenue in 2026/27 and 2027/28 if the 12 cents per litre increase does not proceed on 1 January 2027?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The impact on National Land Transport Fund revenue would depend on whether the planned 1 January 2027 Fuel Excise Duty increase is deferred and for how long.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has he received advice from officials on the latest practicable date for a decision on the fuel excise duty increase scheduled for 1 January 2027; if so, on what date did he receive that advice, and what date was identified?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The most recent advice I have received was on 7 August 2026. This advice identified that a decision is needed by 31 August 2026, in order to inform the Pre-election Economic and Fiscal Update.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has Cabinet taken any decision since Budget 2026 to defer, reduce, or cancel the 12 cents per litre increase in fuel excise duty scheduled for 1 January 2027; if so, on what date was that decision taken?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No Cabinet decision has been taken since the decision to return to the previous practice of regular fuel excise duty and road user charge increases from January 2027, as part of the Government Policy Statement on land transport 2024.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    By what date must an Order in Council amending the Excise and Excise-equivalent Duties Table under the Customs and Excise Act 2018 be made in order for any change to fuel excise duty rates to take effect on 1 January 2027?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

An Order in Council cannot be used to amend the current fuel excise duty rate for it to take effect on 1 January 2027. Under the Customs and Excise Act 2018, fuel excise duty rates may only be amended by Order in Council in the second or…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    On what date, if any, will Cabinet make a final decision on whether to proceed with the 12 cents per litre increase in fuel excise duty scheduled to take effect on 1 January 2027?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Cabinet will make a decision in due course.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the estimated capital cost of the Katikati Bypass, which asset sales are proposed to fund it, and by what date is it expected to be delivered?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency Waka Kotahi (NZTA) has advised me there is no current estimated capital cost or delivery date for the Katikati Bypass. The Western Bay of Plenty Deal includes an initiative for the Western Bay of Plenty Sub Region to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current house price-to-income ratio in the Queenstown Lakes district, if any, and what target, if any, does the Government hold for reducing it?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

According to Census 2023, the median household income in Queenstown was $125,600. This is the most recent official data available. According to MCERT's Property and Sales Statistics dashboard, the median sales price for the 12 months to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What modelling has been undertaken of peak travel times between Jack's Point, Hanley's Farm and central Queenstown, and what peak travel times are forecast for 2028 and 2036 under currently committed investment?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency Waka Kotahi (NZTA) has advised me that modelling undertaken for the Queenstown Transport Business Case (approved 2021) used model years of 2018, 2028 and 2048. No modelling was undertaken for 2036. As such, forecast…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What new levy or charging instruments is the Government developing, if any, to require fast-track projects to contribute to network infrastructure beyond their own sites, and when will those instruments be available for use?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister for Infrastructure

Answer

On 14 August I announced that we are amending the Local Government Act 2002 to enable councils to set appropriate development contributions for fast-track projects, and to recover costs for infrastructure provided across council…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current forecast total cost and completion date of the $250 million Queenstown Package, how do those figures compare with the forecasts at the April 2024 ground-breaking, and what are the reasons for any variance?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency Waka Kotahi (NZTA) has advised me that the current whole of project forecast (June 2026) is: $260.7M. However, to date, no budget increase over the approved $250m has been sought. The forecast additional cost of $10.7m…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many fast-track approvals have been granted for projects in the Queenstown Lakes and Central Otago districts, if any, and how many dwellings do those projects provide for in total / what infrastructure contributions are each required…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister for Infrastructure

Answer

Two fast-track applications have been granted by Panels in Queenstown Lakes and Central Otago districts, as below: Homestead Bay: 2,800 allotments. No consent conditions require financial infrastructure contributions (development…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the estimated total construction cost of the Warkworth to Te Hana section of the Northland Expressway, and what proportion of total construction cost does that represent?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The overall Net Present Value (NPV) cost of the Warkworth to Te Hana Project is estimated at $3.649 billion. This includes the Unitary Charge payments from NZTA to the Contractor during the 25-year operational period, NZTA’s client-side…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Will the Crown Capital Contribution to the Northway consortium be scheduled in multiple payments, if so how are they scheduled and what construction milestones must be met before each payment is made?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA has designed the commercial details of how the CCC payments from the National Land Transport Fund (NLTF) to the Contractor will function in line with commercial principles and advice developed by the National Infrastructure Funding…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Who are all of the parties and guarantors to the Warkworth to Te Hana Project Agreement, and what is the legal structure of the special purpose vehicle established for the project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The parties to the Project Agreement are the NZTA and Northway No.2 LP. Northway No.2 LP is a limited partnership. The limited partnership interests are held 50/50 by entities in the Acciona and Aberdeen groups, who also each indirectly…

Question published
Reply lodged

Asked by

Vanushi Walters

List MP · Labour Party

Question

  • (matches this search)

    What advice has the Attorney-General received from the Crown Law Office on the legal consequences for New Zealand of withdrawing from the Rome Statute of the International Criminal Court, if any, and on what date was that advice provided?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Attorney-General

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many members, if any, of the governing boards of Crown entities within his portfolios have resigned, retired, been removed, or not been reappointed since he became Minister of Transport, and how many of those had been appointed by the…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Mr Rudge and Mr Dougherty are the only two individuals appointed by the previous Minister of Transport, who have resigned during my term and fall under my specific portfolio responsibilities.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does he intend to make any further changes to the membership of the NZTA board, including to the position of chair currently held by Simon Bridges?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

One term expired in May 2026 and I am yet to make a decision on the matter.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many NZTA board meetings were held between 1 January 2026 and 27 July 2026, and what was the attendance of each board member at those meetings?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

There have been four NZTA Board meetings and two Special Board meetings between 1 January and 27 July 2026. Attendance NZTA Board meetings: • 19 February – all members attended • 2 April – Warwick Isaacs an apology • 15 May - all members…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When, if at all, was he first advised that rising cost estimates would require a reprioritisation of the Roads of National Significance programme, ahead of the reprioritisation he announced in July 2026?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I have long been aware of rising cost-pressures on the National Land Transport Fund, and that there are many competing priorities for Crown funding. I refer the Member to page three of the January 2025 Briefing to the Incoming Minister of…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What change, if any, has there been in the total estimated costs of the Roads of National Significance programme since the release of the Government Policy Statement on land transport 2024?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Since the release of the Government Policy Statement on Land Transport 2024, the estimated cost of the Roads of National Significance programme has increased as projects have progressed through business case, design and pre-implementation…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 34355 (matches this search)

    Was the NZTA board's oversight of cost estimates for Roads of National Significance projects a factor in his conclusion that the board required a different balance of skills and experience?

  • 34385 (matches this search)

    What has changed, if anything, in the skills required of the NZTA board since Pat Dougherty was appointed to it in August 2024 and Mike Rudge in November 2024?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As noted in my response to Written Parliamentary Question 34384 (2026), there are range of complex decisions that the Board will need to navigate over the medium term. I considered that the capability mix did not meet the diversity of…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What advice or reporting, if any, has he received from the NZTA board or its chair on rising cost estimates for Roads of National Significance projects, and on what dates?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA Board decisions to reprogramme the RoNS programme were made on 15 May 2026, reflecting updated revenue forecasts, funding constraints, and revised cost estimates across the programme. These decisions subsequently informed advice…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Was the political party membership, donation history, or party affiliation of any candidate for appointment to the NZTA board known to him or to his office at the time the appointments of Lana Stockman, Steve Haszard, and Murdo Beattie…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What annual fees are payable to each of Lana Stockman, Steve Haszard, and Murdo Beattie as members of the NZTA board, and how do those fees compare with the fees paid to Pat Dougherty, Mike Rudge, and Catherine Taylor?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The annual fees for all NZTA members are $76,000 effective from 1 November 2025. No changes to the fees occurred with this appointment round.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the total value, if any, of goods and services procured by NZTA from Meredith Connell, Cameron Partners, Debt Managers, Talleys, and Stellar Projects in each of the last three financial years?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Over the three financial years covered, only Meredith Connell and Stellar Projects recorded any expenditure by NZTA. Expenditure with Meredith Connell was limited to $690.19 in the 2025/26 financial year, with no spending in either 2023/24…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What arrangements, if any, have been put in place to manage any conflicts of interest arising from new NZTA board member Steve Haszard's directorships and his association with the law firm Meredith Connell?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Mr Haszard has stepped down from his directorship with Stellar Projects. Standard conflicts of interest practices are in place for his role with Meredith Connell and Talley's Group. These practices include, where appropriate, recusal from…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What conflicts of interest, if any, were declared by Lana Stockman, Steve Haszard, and Murdo Beattie during the process leading to their appointment to the NZTA board?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I noted the following disclosures to Cabinet as part of the consideration process for each appointment. Lana Stockman: - Nil Steve Haszard: - Independent Director, Stellar Projects - Independent Director, Meredith Connell - Chair,…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When, if at all, did the Cabinet Appointments and Honours Committee consider the appointments of Lana Stockman, Steve Haszard, and Murdo Beattie to the NZTA board?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

30 June 2026

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Who, if anyone, nominated or recommended each of Lana Stockman, Steve Haszard, and Murdo Beattie for appointment to the NZTA board?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Each of the members self-nominated by application when the position advertised.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many candidates, if any, were considered, and how many interviewed, for each of the NZTA board vacancies filled by Lana Stockman, Steve Haszard, and Murdo Beattie?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Total applications: 97 Total shortlisted: 8 Total interviewed: 4

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Was any recruitment, executive search, or advisory firm engaged in relation to the appointments of Lana Stockman, Steve Haszard, and Murdo Beattie to the NZTA board, and if so, which firm and at what cost?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What process, if any, was followed to identify, assess, and select Lana Stockman, Steve Haszard, and Murdo Beattie for appointment to the NZTA board?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The appointment process included advertising for the position, seeking nominations, interviews, candidate due diligence (including referee and background checks, and conflicts of interest analysis), statutory consultation as per section…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Were the NZTA board vacancies filled by Lana Stockman, Steve Haszard, and Murdo Beattie publicly advertised, and if not, why not?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Yes

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Why was David Smol reappointed to the NZTA board for a further two years when other members were found not to meet the balance of skills and experience he considered the board required?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Good practice requires that the NZTA Board possesses the collective skills knowledge, and experience required to appropriately govern the Agency's functions. I considered that Mr Smol's reappointment was necessary to maintain continuity…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Was the retirement of Catherine Taylor from the NZTA board sought, requested, or encouraged in any way by him or by any person acting on his behalf?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No. Ms Taylor signalled that she would not be seeking reappointment at the start of the appointment process.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Did Pat Dougherty or Mike Rudge raise any concerns with him, his office, or the Ministry of Transport about NZTA's financial position, project cost estimates, or governance arrangements at any time before their departure from the NZTA…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does he agree with the statement made by the then-Minister of Transport in November 2024, on appointing Mike Rudge to the NZTA board, that the board had the right mix of skills to deliver the Government's priorities including the Roads of…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As per the Cabinet Manual, each Minister is responsible for exercising the statutory functions and powers under legislation within their portfolios, in the collective Cabinet decision-making context. I also refer the member to my…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Why did he seek changes to the make-up of the NZTA board before the expiry of Pat Dougherty's term on 31 July 2027 and Mike Rudge's term on 31 October 2027?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my response to Written Parliamentary Questions 34384 and 34385 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What payments, if any, of any kind, including fees in lieu of notice, compensation, or ex gratia payments, have been or will be made to former NZTA board members Pat Dougherty and Mike Rudge in connection with their departure from that…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

None