Skip to main content

Written questions

Search written questions to Ministers and the replies they have received.

Filters
Asked by Tangi Utikere · Member for Palmerston North · Labour Party
Minister All Ministers
Portfolio All portfolios
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 101 to 150 of 2089 written question sets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What proportion, if any, of the $100 million contributed by CentrePort and the $110 million contributed by Port Marlborough is expected to be recovered through port fees paid by KiwiRail, and over what period?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

100%, to be recovered across the lift of the respective assets funded by those contributions.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much of the $1.9 billion total programme cost for the ferry replacement programme is not counted within the $1.704 billion taxpayer contribution, and who bears each component of that difference?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

$1.924 billion minus $1.704 billion equals $220 million. $110 million from Port Marlborough. $100 million from CentrePort, and $10 million from the NZTA. Again, you can read about all of this in our speech:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total forecast cost of the Cook Strait Ferry Replacement Programme, broken down by vessel construction, Wellington port infrastructure, Picton port infrastructure, programme management and contingency?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This was all announced on 17 July 2026. Ship contracts: $596 million All Picton works: $493 million All Wellington Works: $409 million Programme management and total contingencies: $426 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What advice, if any, has the Minister received on the cost of leasing an additional vessel to operate on Cook Strait prior to 2029, and what was the estimated cost?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The KiwiRail chair confirmed the company will action our request to maintain a constant market assessment of additional tonnage. To date, no additional tonnage is required as the ferries were 99% reliable in 2025/26 and 100% so far in…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the cost to KiwiRail of relaunching the NZ Connect coastal shipping service, and what freight volumes is it forecast to carry during the 2026 and 2027 maintenance periods?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

NZ Connect is a commercial service, meaning the costs to serve are less than the revenue it generates. The specific numbers in revenue and volume terms cannot be released as KiwiRail has a right to go about its commercial activities…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many sailings were cancelled across the Interislander fleet in each of the 2023/24, 2024/25 and 2025/26 financial years, and what was the estimated revenue impact of those cancellations?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We are delighted by your question. The following table shows the marked improvement in Interislander reliability while we have been responsible for the ferries. Under the previous Government, total executed sailings dropped to 81% in 2021…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What estimate, if any, has been made of the economic cost of reduced Cook Strait ferry capacity during planned maintenance periods between 2026 and 2028, including any estimate of lost productivity or supply chain cost?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Zero. The ferries continue to meet market demand.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What modelling, if any, has KiwiRail or Ferry Holdings undertaken on the volume of freight expected to move off Cook Strait during planned one-ship maintenance periods between 2026 and 2028, and what were the results?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Ferry Holdings has no responsibility for the operation of the Interislander to 2029. KiwiRail undertakes such modelling, which informs their decision to schedule maintenance periods during the low demand period so that a one-ship fleet can…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many days has the Interislander operated a one-ship schedule in each calendar year since 2024, and how many days is it forecast to operate a one-ship schedule in each of 2026, 2027 and 2028?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

There is no readily available record of this data in previous years. The current arrangement is from 22 June to late September 2026. There will be maintenance periods in the coming years, but wet and dry dock scheduling is a commercial…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What was the total cost of demolishing the Aratere's wharf in Picton, and what proceeds, if any, were received from the disposal of the Aratere itself?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The demolition of the wharf is in the low millions. The exact figure is not able to be disclosed at this time. The Aratere was disposed of through a commercial agreement between KiwiRail and the scrapyard which saw the vessel purchased by…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What assessment, if any, has been made of the additional heavy vehicle movements on State Highway 1 attributable to road-bridging of Cook Strait rail freight, and what is the estimated additional road maintenance cost?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Rail freight is loaded from trains onto trailers at KiwiRail’s CT sites in Wellington and Picton, which are both close to or part of the ferry terminals. This freight does not travel on SH1.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What estimate, if any, has been made of the volume of freight that has permanently transferred from rail to road as a result of the loss of a rail-enabled Cook Strait vessel, and what is the estimated annual revenue impact on KiwiRail?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Nothing in life is permanent. Rail will be back on the Strait again in 2029, and we believe rail will be a great success for another 30 year generation.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What volume of rail freight, measured in net tonne kilometres or wagon equivalents, has been road-bridged across Cook Strait in each quarter since the Aratere was retired in August 2025?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is not information held by a shareholding Minister. KiwiRail has a right to go about its commercial activities, including whether to release freight volumes on a specific service, without prejudice or disadvantage.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the annual cost of road-bridging rail freight across Cook Strait following the retirement of the Aratere, and how does this compare with the cost of carrying the same freight on a rail-enabled vessel?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is commercial information held by KiwiRail and will not be disclosed. KiwiRail has a right to go about its commercial activities without prejudice or disadvantage. As previously advised, in business it is reasonable to withhold core…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What has been the total cost of drydock and layby maintenance undertaken overseas for Interislander vessels since 1 January 2024, broken down by vessel and by location?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is commercial information held by KiwiRail and will not be disclosed. KiwiRail has a right to go about its commercial activities without prejudice or disadvantage. As previously advised, in business it is reasonable to withhold core…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What advice, if any, has the Minister received on the expected maintenance cost of the Interislander fleet in the event that the delivery of Kupe and Cook is delayed beyond 2029?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

None, as the ferries and infrastructure programme remain 'on track.'

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What amount, if any, of Interislander maintenance expenditure since December 2023 would not have been required had the vessels ordered under Project iReX been delivered in 2025 and 2026 as originally scheduled?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Maintenance is required whether ships are new or a century old. The exact amounts allocated to vessel maintenance is not able to be disclosed as Interislander competes in an open market. Also, those ferries might have arrived in 2026 but…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 39684 (matches this search)

    What was the total cost of the fleet life-extension programme recommended following the DNV assessment of the Interislander fleet, and how much of that has been spent to date?

  • 39685 (matches this search)

    What is the forecast Interislander fleet maintenance expenditure for each of the 2026/27, 2027/28 and 2028/29 financial years?

  • 39687 (matches this search)

    What has been the Interislander's total fleet maintenance expenditure in each of the 2022/23, 2023/24, 2024/25 and 2025/26 financial years?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information cannot be disclosed to you as it is commercially sensitive. In business, it is not common to publish your detailed cost structures in public for the benefit of your competitor. We are more than happy to continue providing…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What amount, if any, of expenditure on Project iReX has been capitalised into the current ferry replacement programme rather than written off, and what does that expenditure consist of?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We looked into this last year and we were astonished to find that only $85 million of the $671 million spent on iReX resulted in built infrastructure. $222 million reflected the costs incurred by the shipyard and their suppliers. That…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What land, property, consents or design work, if any, was acquired or commissioned for Project iReX that is not being used in the current Cook Strait Ferry Replacement Programme, and what was the cost of each?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

None. Because in the no-nonsense ferry replacement programme, we are using what is already in place to minimise duplication. There might be minor consenting works in Picton, but the bulk are occurring under existing consents.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What was the total book value of materials, plant and equipment procured for Project iReX that were subsequently sold, scrapped or written off, and what amount, if any, was recovered through their sale?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information has not been released. To the extent that the information could be released, KiwiRail did so here: https://www.kiwirail.co.nz/media/kiwirail-concludes-irex-ferry-replacement-project/

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the total cost to the Crown of the cancellation and wind-down of Project iReX as at 30 June 2026, and does this figure differ from the $671 million reported by KiwiRail in August 2025; if so, why?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Sadly, regrettably, outrageously, and disgracefully – iReX spent $671 million with barely anything to show for it. That number has not changed since, as the project was cancelled. Had it not been cancelled, it was on course to cost $4…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What amount, if any, has been spent on iReX-related wind-down activity since the settlement with Hyundai Mipo Dockyard was concluded in August 2025, and what did that expenditure relate to?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Zero, as the project was cancelled. Refer to the responses to WPQ 39690 (2026) and 39686 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much does the NZ Transport Agency expect to spend on external professional services for the Te Hana to Port Marsden Highway and Port Marsden Highway to Whangārei sections in each of 2026/27 and 2027/28, if any, and what proportion of…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The NZ Transport Agency (NZTA) Board has approved $111m of pre-implementation funding for Sections 2A (Te Hana to south of the Brynderwyns) and 2B (Brynderwyn Hills) in Financial Year (FY) 2026/27 and FY2027/28. Of this, approximately…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to Reply 34402 (2026), which advised that no decision has been made on a procurement model for the sections beyond Warkworth to Te Hana, how much, if any, has the NZ Transport Agency spent or committed on external commercial,…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The procurement model is decided when approving the detailed business case for a project, in accordance with the Treasury’s Better Business Case framework. A detailed business case called the Alternative to the Brynderwyns Implementation…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to Reply 34451 (2026), which recorded $27.7 million in legal services and advice for Warkworth to Te Hana, how much, if any, has the NZ Transport Agency spent on external legal services for the Te Hana to Port Marsden Highway and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that as at 31 August 2026, $1.825m has been spent on external legal services for Te Hana to Port Marsden Highway and Port Marsden Highway to Whangarei since 27 November 2023. Chapman Tripp and Bell Gully have provided these…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What did the Northland Corridor investment case referred to in Reply 66207 (2024) cost to produce, broken down by NZ Transport Agency internal costs and external professional services, and which firms were engaged?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Corridor Investment Case was completed in September 2024 and updated in December 2024 with an addendum. I am advised the external professional services costs to develop this business case were approximately $4.3m. Firms engaged were…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, has the NZ Transport Agency spent on external professional services for the Alternative to the Brynderwyn Hills, including preparation of the statutory approvals application referred to in Reply 34402 (2026), broken down…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZTA has spent a total of $40,233,751 between 1 July 2025 and 31 August 2026, which includes: • Legal: $757,659 • Planning & Consenting: $2,830,941 • Engineering & Design: $17,040,699 • Geotechnical: $18,892,576 • Other…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Of the $42.8 million in technical services recorded in Reply 34451 (2026), what proportion relates to geotechnical investigation data that has been provided to the Northway consortium, and did the consortium pay any amount for that data or…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Approximately 40% ($17.5 million) of the $42.8m relates to geotechnical investigation, including all testing and associated professional services. The resulting geotechnical data was provided to all three Respondents during the RFP phase…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's forecast annual client-side cost of managing the Warkworth to Te Hana Project Agreement over the 25-year operational period referred to in Reply 34979 (2026), and how much of that cost is expected to be…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The forecast annual client-side costs during the 25-year operational period (2033-2057) have not yet been developed. I am advised that a budget will be developed closer to the time.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, did the NZ Transport Agency pay external advisers to prepare the Public Sector Comparator and value-for-money assessment for the Warkworth to Te Hana public-private partnership, and which firms were engaged?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Firms were engaged to provide a range of services across the development of the Warkworth to Te Hana investment case and procurement process, including the development of the Public Sector Comparator (PSC). I am advised NZTA does not hold…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to Reply 34450 (2026), has the bid cost reimbursement for the two unsuccessful Warkworth to Te Hana bidders now been finalised; if so, what amount was paid to each and on what date, and if not, when is finalisation expected?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No. I am advised that NZ Transport Agency Waka Kotahi (NZTA) expects to reimburse the two unsuccessful respondents in October 2026.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the total contract value and term of the independent reviewer contract awarded to Tūtahi Joint Venture for the Warkworth to Te Hana public-private partnership, and is that cost borne by the NZ Transport Agency, the Northway…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that the contract value is $40,497,510 and the term is 9 years and 7 months. Costs are shared evenly between NZ Transport Agency Waka Kotahi (NZTA) and Northway.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Is the $98 million in external professional services costs recorded in Reply 34451 (2026) included within the $3.649 billion net present value cost of the Warkworth to Te Hana project referred to in Reply 34979 (2026), or is it additional…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The cost of professional services required to develop the project and to prepare and run a PPP procurement are in addition to the cost of designing and delivering the project.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which external advisers engaged by the NZ Transport Agency on the Warkworth to Te Hana public-private partnership are also engaged on the Te Hana to Whangārei sections of the Northland Corridor, if any, and what ringfencing arrangements of…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that the following external advisors who were engaged by NZTA on the Warkworth to Te Hana project are engaged by NZTA to support the development of other sections of the Northland corridor: Aurecon New Zealand and WSP New…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which ten external suppliers have been paid the most for consultancy, engineering, legal, financial or advisory services in relation to the Northland Corridor programme since 27 November 2023, and what is the total paid to each?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to the attached table.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the total value paid or payable to Arup, Tonkin & Taylor and Bureau Veritas, whether individually or through Tūtahi Joint Venture, for services in relation to any section of the Northland Corridor since 27 November 2023, broken…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to 39701 (2026) for the amount payable to the Tūtahi Joint Venture. I am advised that NZTA has paid $4.9 million to Arup since the Northland Corridor project was established in 2024. NZTA has not paid Tonkin…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Are any external advisers engaged on the Northland Corridor programme remunerated on a success-fee, contingent or milestone basis; if so, which advisers, what milestones apply, and what is the total value of such fees paid or payable to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, has the NZ Transport Agency spent on external professional services for the Northland Corridor programme in each financial year from 2023/24 to 2025/26, broken down by financial year and by section?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to the attached table.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to Reply 66207 (2024), are external professional services costs for the corridor now recorded against individual sections; if so, from what date, and if not, what is the total programme-level spend on external professional services…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The costs of external professional services have been allocated by Section since July 2024.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to Reply 34451 (2026), how much, if any, has the NZ Transport Agency spent to date on external professional services for the Northland Corridor programme as a whole, broken down by section (Warkworth to Te Hana; Te Hana to Port…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my response to 39707 (2026). This provides the total cost of external professional services supplied to the Northland Corridor programme as a whole. Of this total, for the amount spent broken down by section and the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What estimate, if any, has the Minister received of the change in the total amount of central government funding transferred to local authorities over the three years from 1 July 2027, across all portfolios and not only transport, broken…

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What was the average rates increase set by each council for the 2026/27 financial year, broken down by council, and how does each compare with the level of the proposed cap on rates increases?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

Data shows that based on their reported rates increases, most councils are currently operating outside of the proposed rates cap target range of 2-4%. Sixty-five councils are above 4%, four are below 2% and the remaining nine are within…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many councils, if any, have advised the Minister or the Department of Internal Affairs that the reduction in the share of their land transport costs met by the New Zealand Transport Agency from 2027/28 will affect their ability to…

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

I am aware of general concerns about the effect that changes to the New Zealand Transport Agency’s funding assistance rates may have on council finances. However, I have not received advice identifying the number of councils that have…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What role, if any, did the Minister have in the setting of New Zealand Transport Agency normal funding assistance rates for the 2027-30 National Land Transport Programme, and on what dates, if any, was the Minister consulted or informed…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

None. The NZ Transport Agency Waka Kotahi (NZTA) Board has the statutory responsibility to set normal funding assistance rates (FARs). NZTA informed me of the Board’s decisions on normal FARs prior to communication to Approved…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What methodology did the New Zealand Transport Agency use to set normal funding assistance rates for the 2027-30 National Land Transport Programme, and in what respects, if any, does that methodology differ from the one used to set rates…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZ Transport Agency Waka Kotahi (NZTA) used the methodology developed in the funding assistance rates policy which is available on its website here:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What amount, if any, has been paid from the National Land Transport Fund towards emergency works on local roads since 1 July 2023, broken down by approved organisation and by financial year?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to the attached table.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What New Zealand Transport Agency funding assistance rate applies to emergency works, being repairs to local roads damaged by storms, floods and other events, broken down by approved organisation and by each year of the 2027-30 National…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZ Transport Agency Waka Kotahi (NZTA) is retaining the current emergency works FAR policy for 2027–30. Details of how the emergency works FAR is calculated for each approved organisation is on the NZTA website here:…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 39721 (matches this search)

    What estimate, if any, has been made of the additional cost falling on regional councils and unitary authorities as a result of changes to New Zealand Transport Agency public transport funding assistance rates over the three years of the…

  • 39728 (matches this search)

    What estimate, if any, has been made of the additional cost, if any, falling on councils and other approved organisations, in dollars, as a result of changes to New Zealand Transport Agency normal funding assistance rates over the three…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZ Transport Agency Waka Kotahi (NZTA) is not able to provide forecasts until the National Land Transport Programme 2027-30 is adopted by the NZTA Board in 2027.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What New Zealand Transport Agency funding assistance rate applies to total mobility services, being the subsidised transport scheme for people unable to use conventional public transport, broken down by approved organisation and by each…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at:…