Skip to main content

Written questions

Search written questions to Ministers and the replies they have received.

Filters
Asked by Tangi Utikere · Member for Palmerston North · Labour Party
Minister All Ministers
Portfolio All portfolios
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 851 to 900 of 2089 written question sets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What safeguards are in place, if any, to ensure that a private technology company such as Anori does not gain a commercial advantage in the local government or resource management sectors as a result of access to Ministers or officials?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

No private company receives commercial advantage simply through meeting with Ministers or officials.

Corrected reply

Question 33197 (2026)

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has the AI company Anori, or any representative of it, sought any government funding, contract, or procurement opportunity relating to local government or the built environment; if so, what was sought and what was the outcome?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

Corrected reply: No.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which New Zealand councils or entities does the Minister of Local Government understand the AI company Anori to have pilot activity underway with in New Zealand?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

This information is subject to commercial sensitivities, as such it would be inappropriate for it to be released.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What policies, guidance or contractual requirements govern the management of conflicts of interest in the procurement of independent reviewers for public-private partnership transport projects?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The management of conflicts of interest in the procurement of independent reviewers for public-private partnership (PPP) transport projects is governed by the Government Procurement Rules. In addition, NZTA has advised that the PPP…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does he have confidence that the independent reviewer to be appointed to the Warkworth to Te Hana public-private partnership will be independent of all parties to that contract, and on what basis?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Yes. I am advised by NZTA that independence is a key assessment criterion in the evaluation and selection of the preferred independent reviewer, providing confidence that the appointed reviewer will be independent of all parties to the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the estimated value of the independent reviewer contract for the Warkworth to Te Hana expressway, and when is that contract expected to be executed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that the value of the independent reviewer contract for the Warkworth to Te Hana expressway has not yet been confirmed because the contract has not been finalised. Any estimate of the contract value is commercially…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does he consider it appropriate for a firm that has advised NZTA on a public-private partnership transaction to also form part of the team verifying compliance with that contract, and if not, what steps will he take?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Yes. I have been assured by NZTA that the preferred Independent Reviewer team has had no involvement in supporting NZTA's PPP procurement process. As a result, I am satisfied that no further action is required

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What ringfencing arrangements has he been advised are in place to separate the Arup personnel who worked on the client side of the Warkworth to Te Hana transaction from those who may form part of the independent reviewer team, if any?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that a small ringfenced Arup team supported NZTA during the transaction. Those personnel were prohibited from being involved in the independent reviewer procurement process on either side and will have no involvement…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What assurances has he sought or received that conflicts of interest have been managed, if any, after Arup has acted as a client-side adviser to NZTA on the Warkworth to Te Hana public-private partnership, formed part of the unsuccessful…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I have received assurances from NZTA that any potential conflicts of interest arising from Arup's involvement in the Warkworth to Te Hana public-private partnership have been appropriately managed. NZTA has advised that the procurement…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When was he or his office first advised that Tūtahi Joint Venture, comprising Arup, Tonkin & Taylor and Bureau Veritas, was the preferred respondent for the independent reviewer contract on the Warkworth to Te Hana public-private…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that neither I nor my office received a specific briefing that Tūtahi Joint Venture was the preferred respondent for the independent reviewer contract on the Warkworth to Te Hana public-private partnership. I have received…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the breakdown of costs for the $21.6 million from the Regional Infrastructure Fund allocated for the refurbishment of the two tanks at the Northland fuel import terminal?

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

Channel Infrastructure NZ Limited has completed the refurbishment of two diesel storage tanks and will provide the Crown with storage and associated operational services from June 2026 through to December 2027. The total cost of these…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

Matching question numbers: 32224 (2026), 32225 (2026), 32226 (2026), 32227 (2026), 32228 (2026), 32229 (2026), 32230 (2026), 32231 (2026), 32232 (2026), 32233 (2026), 32234 (2026), 32235 (2026), 32236 (2026), 32237 (2026), 32238 (2026), 32239 (2026), 32240 (2026), 32241 (2026), 32242 (2026), 32243 (2026), 32244 (2026), 32245 (2026), 32246 (2026), 32247 (2026), 32248 (2026), 32249 (2026), 32250 (2026), 32251 (2026), 32252 (2026), 32253 (2026), 32254 (2026), 32255 (2026), 32256 (2026), 32257 (2026), 32258 (2026), 32259 (2026), 32260 (2026), 32261 (2026), 32262 (2026), 32263 (2026), 32264 (2026), 32265 (2026), 32266 (2026), 32267 (2026), 32268 (2026), 32269 (2026), 32270 (2026), 32271 (2026), 32272 (2026), 32273 (2026), 32274 (2026), 32275 (2026), 32276 (2026), 32277 (2026), 32278 (2026), 32279 (2026), 32280 (2026), 32281 (2026), 32282 (2026), 32283 (2026), 32284 (2026), 32285 (2026), 32286 (2026), 32287 (2026), 32288 (2026), 32289 (2026), 32290 (2026), 32291 (2026), 32292 (2026), 32293 (2026), 32294 (2026), 32295 (2026), 32296 (2026), 32297 (2026), 32298 (2026), 32299 (2026), 32300 (2026), 32301 (2026), 32302 (2026), 32303 (2026), 32304 (2026), 32305 (2026), 32306 (2026), 32307 (2026), 32308 (2026), 32309 (2026), 32310 (2026), 32311 (2026), 32312 (2026), 32313 (2026), 32314 (2026), 32315 (2026), 32316 (2026), 32317 (2026), 32318 (2026), 32319 (2026), 32320 (2026), 32321 (2026), 32322 (2026), 32323 (2026), 32324 (2026), 32325 (2026), 32326 (2026), 32327 (2026), 32328 (2026), 32329 (2026), 32330 (2026), 32331 (2026), 32332 (2026), 32333 (2026), 32334 (2026), 32335 (2026), 32336 (2026), 32337 (2026), 32338 (2026), 32339 (2026), 32340 (2026), 32341 (2026), 32342 (2026), 32343 (2026), 32344 (2026), 32345 (2026), 32346 (2026), 32347 (2026), 32348 (2026), 32349 (2026), 32350 (2026), 32351 (2026), 32352 (2026), 32353 (2026), 32354 (2026), 32355 (2026), 32356 (2026), 32357 (2026), 32358 (2026), 32359 (2026), 32360 (2026), 32361 (2026), 32362 (2026), 32363 (2026), 32364 (2026), 32365 (2026), 32366 (2026), 32367 (2026), 32368 (2026), 32369 (2026), 32370 (2026), 32371 (2026), 32372 (2026), 32373 (2026), 32374 (2026), 32375 (2026), 32376 (2026), 32377 (2026), 32378 (2026), 32379 (2026), 32380 (2026), 32381 (2026), 32382 (2026), 32383 (2026), 32384 (2026), 32385 (2026), 32386 (2026), 32387 (2026), 32388 (2026), 32389 (2026), 32390 (2026), 32391 (2026), 32392 (2026), 32393 (2026), 32394 (2026), 32395 (2026), 32396 (2026), 32397 (2026), 32398 (2026), 32399 (2026), 32400 (2026), 32401 (2026), 32402 (2026), 32403 (2026), 32404 (2026), 32405 (2026), 32406 (2026), 32407 (2026), 32408 (2026), 32409 (2026), 32410 (2026), 32411 (2026), 32412 (2026), 32413 (2026), 32414 (2026), 32415 (2026), 32416 (2026), 32417 (2026), 32418 (2026), 32419 (2026), 32420 (2026), 32421 (2026), 32422 (2026), 32423 (2026), 32424 (2026), 32425 (2026), 32426 (2026), 32427 (2026), 32428 (2026), 32429 (2026), 32430 (2026), 32431 (2026), 32432 (2026), 32433 (2026), 32434 (2026), 32435 (2026), 32436 (2026), 32437 (2026), 32438 (2026), 32439 (2026), 32440 (2026), 32441 (2026), 32442 (2026), 32443 (2026), 32444 (2026), 32445 (2026), 32446 (2026), 32447 (2026), 32448 (2026), 32449 (2026), 32450 (2026), 32451 (2026), 32452 (2026), 32453 (2026), 32454 (2026), 32455 (2026), 32456 (2026), 32457 (2026), 32458 (2026), 32459 (2026), 32460 (2026), 32461 (2026), 32462 (2026), 32463 (2026), 32464 (2026), 32465 (2026), 32466 (2026), 32467 (2026), 32468 (2026), 32469 (2026), 32470 (2026), 32471 (2026), 32472 (2026), 32473 (2026), 32474 (2026), 32475 (2026), 32476 (2026), 32477 (2026), 32478 (2026), 32479 (2026), 32480 (2026), 32481 (2026), 32482 (2026), 32483 (2026), 32484 (2026), 32485 (2026), 32486 (2026), 32487 (2026), 32488 (2026), 32489 (2026), 32490 (2026), 32491 (2026), 32492 (2026), 32493 (2026), 32494 (2026), 32495 (2026), 32496 (2026), 32497 (2026), 32498 (2026), 32499 (2026), 32500 (2026), 32501 (2026), 32502 (2026), 32503 (2026), 32504 (2026), 32505 (2026), 32506 (2026), 32507 (2026), 32508 (2026), 32509 (2026), 32510 (2026), 32511 (2026), 32512 (2026), 32513 (2026), 32514 (2026), 32515 (2026), 32516 (2026), 32517 (2026), 32518 (2026), 32519 (2026), 32520 (2026), 32521 (2026), 32522 (2026), 32523 (2026), 32524 (2026), 32525 (2026), 32526 (2026), 32527 (2026), 32528 (2026), 32529 (2026), 32530 (2026), 32531 (2026), 32532 (2026), 32533 (2026), 32534 (2026), 32535 (2026), 32536 (2026), 32537 (2026), 32538 (2026), 32539 (2026), 32540 (2026), 32541 (2026), 32542 (2026), 32543 (2026), 32544 (2026), 32545 (2026), 32546 (2026), 32547 (2026), 32548 (2026), 32549 (2026), 32550 (2026), 32551 (2026), 32552 (2026), 32553 (2026), 32554 (2026), 32555 (2026), 32556 (2026), 32557 (2026), 32558 (2026), 32559 (2026), 32560 (2026), 32561 (2026), 32562 (2026), 32563 (2026), 32564 (2026), 32565 (2026), 32566 (2026), 32567 (2026), 32568 (2026), 32569 (2026), 32570 (2026), 32571 (2026), 32572 (2026), 32573 (2026), 32574 (2026), 32575 (2026), 32576 (2026), 32577 (2026), 32578 (2026), 32579 (2026), 32580 (2026), 32581 (2026), 32582 (2026), 32583 (2026), 32584 (2026), 32585 (2026), 32586 (2026), 32587 (2026), 32588 (2026), 32589 (2026), 32590 (2026), 32591 (2026), 32592 (2026), 32593 (2026), 32594 (2026), 32595 (2026), 32596 (2026), 32597 (2026), 32598 (2026), 32599 (2026), 32600 (2026), 32601 (2026), 32602 (2026), 32603 (2026), 32604 (2026), 32605 (2026), 32606 (2026), 32607 (2026), 32608 (2026), 32609 (2026), 32610 (2026), 32611 (2026), 32612 (2026), 32613 (2026), 32614 (2026), 32615 (2026), 32616 (2026), 32617 (2026), 32618 (2026), 32619 (2026), 32620 (2026), 32621 (2026), 32622 (2026), 32623 (2026), 32624 (2026), 32625 (2026), 32626 (2026), 32627 (2026), 32628 (2026), 32629 (2026), 32630 (2026), 32631 (2026), 32632 (2026), 32633 (2026), 32634 (2026), 32635 (2026), 32636 (2026), 32637 (2026), 32638 (2026), 32639 (2026), 32640 (2026), 32641 (2026), 32642 (2026), 32643 (2026), 32644 (2026), 32645 (2026), 32646 (2026), 32647 (2026), 32648 (2026), 32649 (2026), 32650 (2026), 32651 (2026), 32652 (2026), 32653 (2026), 32654 (2026), 32655 (2026), 32656 (2026), 32657 (2026), 32658 (2026), 32659 (2026), 32660 (2026), 32661 (2026), 32662 (2026), 32663 (2026), 32664 (2026), 32665 (2026), 32666 (2026), 32667 (2026), 32668 (2026), 32669 (2026), 32670 (2026), 32671 (2026), 32672 (2026), 32673 (2026), 32674 (2026), 32675 (2026), 32676 (2026), 32677 (2026), 32678 (2026), 32679 (2026), 32680 (2026), 32681 (2026), 32682 (2026), 32683 (2026), 32684 (2026), 32685 (2026), 32686 (2026), 32687 (2026), 32688 (2026), 32689 (2026), 32690 (2026), 32691 (2026), 32692 (2026), 32693 (2026), 32694 (2026), 32695 (2026), 32696 (2026), 32697 (2026), 32698 (2026), 32699 (2026), 32700 (2026), 32701 (2026), 32702 (2026), 32703 (2026), 32704 (2026), 32705 (2026), 32706 (2026), 32707 (2026), 32708 (2026), 32709 (2026), 32710 (2026), 32711 (2026), 32712 (2026), 32713 (2026), 32714 (2026), 32715 (2026), 32716 (2026), 32717 (2026), 32718 (2026), 32719 (2026), 32720 (2026), 32721 (2026), 32722 (2026), 32723 (2026), 32724 (2026), 32725 (2026), 32726 (2026), 32727 (2026), 32728 (2026), 32729 (2026), 32730 (2026), 32731 (2026), 32732 (2026), 32733 (2026), 32734 (2026), 32735 (2026), 32736 (2026), 32737 (2026), 32738 (2026), 32739 (2026), 32740 (2026), 32741 (2026), 32742 (2026), 32743 (2026), 32744 (2026), 32745 (2026), 32746 (2026), 32747 (2026), 32748 (2026), 32749 (2026), 32750 (2026), 32751 (2026), 32752 (2026), 32753 (2026), 32754 (2026), 32755 (2026), 32756 (2026), 32757 (2026), 32758 (2026), 32759 (2026), 32760 (2026), 32761 (2026), 32762 (2026), 32763 (2026), 32764 (2026), 32765 (2026), 32766 (2026), 32767 (2026), 32768 (2026), 32769 (2026), 32770 (2026), 32771 (2026), 32772 (2026), 32773 (2026), 32774 (2026), 32775 (2026), 32776 (2026), 32777 (2026), 32778 (2026), 32779 (2026), 32780 (2026), 32781 (2026), 32782 (2026), 32783 (2026), 32784 (2026), 32785 (2026), 32786 (2026), 32787 (2026), 32788 (2026), 32789 (2026), 32790 (2026), 32791 (2026), 32792 (2026), 32793 (2026), 32794 (2026), 32795 (2026), 32796 (2026), 32797 (2026), 32798 (2026), 32799 (2026), 32800 (2026), 32801 (2026), 32802 (2026), 32803 (2026), 32804 (2026), 32805 (2026), 32806 (2026), 32807 (2026), 32808 (2026), 32809 (2026), 32810 (2026), 32811 (2026), 32812 (2026), 32814 (2026), 32816 (2026), 32817 (2026), 32819 (2026), 32820 (2026), 32821 (2026), 32822 (2026), 32823 (2026), 32824 (2026), 32825 (2026), 32826 (2026), 32827 (2026), 32828 (2026), 32829 (2026), 32830 (2026), 32831 (2026), 32832 (2026), 32833 (2026), 32834 (2026), 32835 (2026), 32836 (2026), 32837 (2026), 32838 (2026), 32839 (2026), 32840 (2026), 32841 (2026), 32842 (2026), 32843 (2026), 32844 (2026), 32846 (2026), 32847 (2026), 32849 (2026), 32850 (2026), 32851 (2026), 32852 (2026), 32853 (2026), 32854 (2026), 32855 (2026), 32856 (2026), 32857 (2026), 32858 (2026), 32859 (2026), 32860 (2026), 32861 (2026), 32862 (2026), 32863 (2026), 32864 (2026), 32865 (2026), 32866 (2026), 32867 (2026), 32868 (2026), 32869 (2026), 32870 (2026), 32871 (2026), 32872 (2026), 32873 (2026), 32874 (2026), 32875 (2026), 32876 (2026), 32877 (2026)

  • 32220 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Cross Valley Link over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32221 (matches this search)

    What further expenditure, if any, would be required to keep the Cross Valley Link "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32222 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Cross Valley Link, including any consenting appeals or litigation, since 27 November 2023?

  • 32223 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Cross Valley Link since 27 November 2023?

Show the remaining 649 questions
  • 32224 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Cross Valley Link, in total and broken down by financial year, since 27 November 2023?

  • 32225 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Cross Valley Link since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32226 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Cross Valley Link per month, on average, since 27 November 2023?

  • 32227 (matches this search)

    Has construction funding been committed to the Cross Valley Link since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32228 (matches this search)

    What is the current status of the Cross Valley Link in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32229 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Cross Valley Link since 27 November 2023 that were not progressed?

  • 32230 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Cross Valley Link that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32231 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Cross Valley Link as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated…

  • 32232 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Cross Valley Link since 27 November 2023, and what is their combined value?

  • 32233 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Cross Valley Link, broken down by financial year and by supplier, since 27 November 2023?

  • 32234 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Cross Valley Link remains unspent as at 30 June 2026?

  • 32235 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Cross Valley Link since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32236 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Airport to Botany Busway Stage 3 and 4 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32237 (matches this search)

    What further expenditure, if any, would be required to keep Airport to Botany Busway Stage 3 and 4 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32238 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Airport to Botany Busway Stage 3 and 4 since 27 November 2023?

  • 32239 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Airport to Botany Busway Stage 3 and 4, including any consenting appeals or litigation, since 27 November 2023?

  • 32240 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Airport to Botany Busway Stage 3 and 4 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32241 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Airport to Botany Busway Stage 3 and 4, in total and broken down by financial year, since 27 November 2023?

  • 32242 (matches this search)

    Has construction funding been committed to Airport to Botany Busway Stage 3 and 4 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32243 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Airport to Botany Busway Stage 3 and 4 per month, on average, since 27 November 2023?

  • 32244 (matches this search)

    What is the current status of Airport to Botany Busway Stage 3 and 4 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32245 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Airport to Botany Busway Stage 3 and 4 since 27 November 2023 that were not progressed?

  • 32246 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Airport to Botany Busway Stage 3 and 4 as a result of a change in government direction since 27 November 2023; if so, what, if anything,…

  • 32247 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Airport to Botany Busway Stage 3 and 4 that has since been superseded, discarded, or rendered obsolete by a change in scope or…

  • 32248 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Airport to Botany Busway Stage 3 and 4 since 27 November 2023, and what is their combined value?

  • 32249 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Airport to Botany Busway Stage 3 and 4, broken down by financial year and by supplier, since 27…

  • 32250 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Airport to Botany Busway Stage 3 and 4 remains unspent as at 30 June 2026?

  • 32251 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Airport to Botany Busway Stage 3 and 4 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32252 (matches this search)

    What further expenditure, if any, would be required to keep the Auckland Level Crossings Removal programme (including the Western Line) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport…

  • 32253 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Auckland Level Crossings Removal programme (including the Western Line) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost…

  • 32254 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Auckland Level Crossings Removal programme (including the Western Line), including any consenting appeals or litigation, since 27 November 2023?

  • 32255 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023?

  • 32256 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023 that are not currently required for construction, and what…

  • 32257 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Auckland Level Crossings Removal programme (including the Western Line) per month, on average, since 27 November 2023?

  • 32258 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Auckland Level Crossings Removal programme (including the Western Line), in total and broken down by financial year, since 27 November 2023?

  • 32259 (matches this search)

    Has construction funding been committed to the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32260 (matches this search)

    What is the current status of the Auckland Level Crossings Removal programme (including the Western Line) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32261 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023 that were not progressed?

  • 32262 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Auckland Level Crossings Removal programme (including the Western Line) as a result of a change in government direction since 27…

  • 32263 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023, and what is their combined value?

  • 32264 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Auckland Level Crossings Removal programme (including the Western Line), broken down by…

  • 32265 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Auckland Level Crossings Removal programme (including the Western Line) that has since been superseded, discarded, or…

  • 32266 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection,…

  • 32267 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Auckland Level Crossings Removal programme (including the Western Line) remains unspent as at 30 June 2026?

  • 32268 (matches this search)

    What further expenditure, if any, would be required to keep SH6 Hope Bypass Stage 2 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32269 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH6 Hope Bypass Stage 2 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32270 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH6 Hope Bypass Stage 2, including any consenting appeals or litigation, since 27 November 2023?

  • 32271 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH6 Hope Bypass Stage 2 since 27 November 2023?

  • 32272 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH6 Hope Bypass Stage 2 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32273 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH6 Hope Bypass Stage 2, in total and broken down by financial year, since 27 November 2023?

  • 32274 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH6 Hope Bypass Stage 2 per month, on average, since 27 November 2023?

  • 32275 (matches this search)

    Has construction funding been committed to SH6 Hope Bypass Stage 2 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32276 (matches this search)

    What is the current status of SH6 Hope Bypass Stage 2 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32277 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH6 Hope Bypass Stage 2 since 27 November 2023 that were not progressed?

  • 32278 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH6 Hope Bypass Stage 2 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32279 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH6 Hope Bypass Stage 2 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32280 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH6 Hope Bypass Stage 2 since 27 November 2023, and what is their combined value?

  • 32281 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH6 Hope Bypass Stage 2, broken down by financial year and by supplier, since 27 November 2023?

  • 32282 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH6 Hope Bypass Stage 2 remains unspent as at 30 June 2026?

  • 32283 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH6 Hope Bypass Stage 2 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32284 (matches this search)

    What further expenditure, if any, would be required to keep the Petone to Grenada Link Road "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32285 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Petone to Grenada Link Road over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32286 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Petone to Grenada Link Road, including any consenting appeals or litigation, since 27 November 2023?

  • 32287 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Petone to Grenada Link Road since 27 November 2023?

  • 32288 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Petone to Grenada Link Road since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32289 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Petone to Grenada Link Road, in total and broken down by financial year, since 27 November 2023?

  • 32290 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Petone to Grenada Link Road per month, on average, since 27 November 2023?

  • 32291 (matches this search)

    Has construction funding been committed to the Petone to Grenada Link Road since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32292 (matches this search)

    What is the current status of the Petone to Grenada Link Road in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32293 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Petone to Grenada Link Road since 27 November 2023 that were not progressed?

  • 32294 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Petone to Grenada Link Road as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32295 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Petone to Grenada Link Road that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32296 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Petone to Grenada Link Road since 27 November 2023, and what is their combined value?

  • 32297 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Petone to Grenada Link Road, broken down by financial year and by supplier, since 27 November…

  • 32298 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Petone to Grenada Link Road remains unspent as at 30 June 2026?

  • 32299 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Petone to Grenada Link Road since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32300 (matches this search)

    What further expenditure, if any, would be required to keep Mill Road – Alfriston to Drury "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32301 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Mill Road – Alfriston to Drury over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32302 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Mill Road – Alfriston to Drury, including any consenting appeals or litigation, since 27 November 2023?

  • 32303 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Mill Road – Alfriston to Drury since 27 November 2023?

  • 32304 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Mill Road – Alfriston to Drury since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32305 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Mill Road – Alfriston to Drury, in total and broken down by financial year, since 27 November 2023?

  • 32306 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Mill Road – Alfriston to Drury per month, on average, since 27 November 2023?

  • 32307 (matches this search)

    What is the current status of Mill Road – Alfriston to Drury in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32308 (matches this search)

    Has construction funding been committed to Mill Road – Alfriston to Drury since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32309 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Mill Road – Alfriston to Drury since 27 November 2023 that were not progressed?

  • 32310 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Mill Road – Alfriston to Drury as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32311 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Mill Road – Alfriston to Drury that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32312 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Mill Road – Alfriston to Drury, broken down by financial year and by supplier, since 27 November…

  • 32313 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Mill Road – Alfriston to Drury since 27 November 2023, and what is their combined value?

  • 32314 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Mill Road – Alfriston to Drury remains unspent as at 30 June 2026?

  • 32315 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Mill Road – Alfriston to Drury since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32316 (matches this search)

    What further expenditure, if any, would be required to keep the East-West Link "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32317 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the East-West Link over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32318 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the East-West Link, including any consenting appeals or litigation, since 27 November 2023?

  • 32319 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the East-West Link since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32320 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the East-West Link since 27 November 2023?

  • 32321 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the East-West Link, in total and broken down by financial year, since 27 November 2023?

  • 32322 (matches this search)

    Has construction funding been committed to the East-West Link since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32323 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the East-West Link per month, on average, since 27 November 2023?

  • 32324 (matches this search)

    What is the current status of the East-West Link in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32325 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the East-West Link since 27 November 2023 that were not progressed?

  • 32326 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the East-West Link as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated…

  • 32327 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the East-West Link that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32328 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the East-West Link since 27 November 2023, and what is their combined value?

  • 32329 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the East-West Link, broken down by financial year and by supplier, since 27 November 2023?

  • 32330 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the East-West Link remains unspent as at 30 June 2026?

  • 32331 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the East-West Link since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32332 (matches this search)

    What further expenditure, if any, would be required to keep the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) "shovel ready" if a construction funding decision is delayed beyond the current…

  • 32333 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) over the remainder of the 2024-27 National Land Transport Programme period,…

  • 32334 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills), including any consenting appeals or litigation, since 27…

  • 32335 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023?

  • 32336 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023 that are not currently required for…

  • 32337 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills), in total and broken down by financial year, since 27…

  • 32338 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) per month, on average, since 27 November 2023?

  • 32339 (matches this search)

    Has construction funding been committed to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32340 (matches this search)

    What is the current status of the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27…

  • 32341 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) as a result of a change in government…

  • 32342 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023 that were not progressed?

  • 32343 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) that has since been superseded,…

  • 32344 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023, and what is their combined…

  • 32345 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills), broken…

  • 32346 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) remains unspent as at 30 June 2026?

  • 32347 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route…

  • 32348 (matches this search)

    What further expenditure, if any, would be required to keep the Northwest Busway – Te Ara Hauāuru Stage 3 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32349 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Northwest Busway – Te Ara Hauāuru Stage 3 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32350 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northwest Busway – Te Ara Hauāuru Stage 3, including any consenting appeals or litigation, since 27 November 2023?

  • 32351 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023?

  • 32352 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023 that are not currently required for construction, and what is their combined purchase…

  • 32353 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 3 per month, on average, since 27 November 2023?

  • 32354 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northwest Busway – Te Ara Hauāuru Stage 3, in total and broken down by financial year, since 27 November 2023?

  • 32355 (matches this search)

    Has construction funding been committed to the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32356 (matches this search)

    What is the current status of the Northwest Busway – Te Ara Hauāuru Stage 3 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32357 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023 that were not progressed?

  • 32358 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northwest Busway – Te Ara Hauāuru Stage 3 as a result of a change in government direction since 27 November 2023; if so, what, if…

  • 32359 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023, and what is their combined value?

  • 32360 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northwest Busway – Te Ara Hauāuru Stage 3 that has since been superseded, discarded, or rendered obsolete by a change in…

  • 32361 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northwest Busway – Te Ara Hauāuru Stage 3, broken down by financial year and by supplier, since…

  • 32362 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northwest Busway – Te Ara Hauāuru Stage 3 remains unspent as at 30 June 2026?

  • 32363 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32364 (matches this search)

    What further expenditure, if any, would be required to keep the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32365 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2, including any consenting appeals or litigation, since 27 November 2023?

  • 32366 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32367 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32368 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023?

  • 32369 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2, in total and broken down by financial year, since 27 November 2023?

  • 32370 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 per month, on average, since 27 November 2023?

  • 32371 (matches this search)

    Has construction funding been committed to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32372 (matches this search)

    What is the current status of the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32373 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023 that were not progressed?

  • 32374 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 as a result of a change in government direction since 27 November 2023; if so, what,…

  • 32375 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 that has since been superseded, discarded, or rendered obsolete by a change…

  • 32376 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2, broken down by financial year and by supplier,…

  • 32377 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 remains unspent as at 30 June 2026?

  • 32378 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023, and what is their combined value?

  • 32379 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition,…

  • 32380 (matches this search)

    What further expenditure, if any, would be required to keep the SH16 North-West Alternative State Highway "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32381 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the SH16 North-West Alternative State Highway over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32382 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the SH16 North-West Alternative State Highway, including any consenting appeals or litigation, since 27 November 2023?

  • 32383 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the SH16 North-West Alternative State Highway since 27 November 2023?

  • 32384 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the SH16 North-West Alternative State Highway since 27 November 2023 that are not currently required for construction, and what is their combined purchase…

  • 32385 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the SH16 North-West Alternative State Highway, in total and broken down by financial year, since 27 November 2023?

  • 32386 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the SH16 North-West Alternative State Highway per month, on average, since 27 November 2023?

  • 32387 (matches this search)

    Has construction funding been committed to the SH16 North-West Alternative State Highway since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32388 (matches this search)

    What is the current status of the SH16 North-West Alternative State Highway in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32389 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the SH16 North-West Alternative State Highway since 27 November 2023 that were not progressed?

  • 32390 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the SH16 North-West Alternative State Highway as a result of a change in government direction since 27 November 2023; if so, what, if…

  • 32391 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the SH16 North-West Alternative State Highway that has since been superseded, discarded, or rendered obsolete by a change in…

  • 32392 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the SH16 North-West Alternative State Highway since 27 November 2023, and what is their combined value?

  • 32393 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the SH16 North-West Alternative State Highway, broken down by financial year and by supplier, since…

  • 32394 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the SH16 North-West Alternative State Highway remains unspent as at 30 June 2026?

  • 32395 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the SH16 North-West Alternative State Highway since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32396 (matches this search)

    What further expenditure, if any, would be required to keep Takitimu North Link Stage 2B "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32397 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Takitimu North Link Stage 2B over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32398 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Takitimu North Link Stage 2B, including any consenting appeals or litigation, since 27 November 2023?

  • 32399 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Takitimu North Link Stage 2B since 27 November 2023?

  • 32400 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Takitimu North Link Stage 2B since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32401 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Takitimu North Link Stage 2B per month, on average, since 27 November 2023?

  • 32402 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Takitimu North Link Stage 2B, in total and broken down by financial year, since 27 November 2023?

  • 32403 (matches this search)

    What is the current status of Takitimu North Link Stage 2B in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32404 (matches this search)

    Has construction funding been committed to Takitimu North Link Stage 2B since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32405 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Takitimu North Link Stage 2B since 27 November 2023 that were not progressed?

  • 32406 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Takitimu North Link Stage 2B as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32407 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Takitimu North Link Stage 2B since 27 November 2023, and what is their combined value?

  • 32408 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Takitimu North Link Stage 2B that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32409 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Takitimu North Link Stage 2B, broken down by financial year and by supplier, since 27 November 2023?

  • 32410 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Takitimu North Link Stage 2B remains unspent as at 30 June 2026?

  • 32411 (matches this search)

    What further expenditure, if any, would be required to keep Hamilton Southern Links "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32412 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Takitimu North Link Stage 2B since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32413 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Hamilton Southern Links over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32414 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Hamilton Southern Links since 27 November 2023?

  • 32415 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Hamilton Southern Links, including any consenting appeals or litigation, since 27 November 2023?

  • 32416 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Hamilton Southern Links since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32417 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Hamilton Southern Links, in total and broken down by financial year, since 27 November 2023?

  • 32418 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Hamilton Southern Links per month, on average, since 27 November 2023?

  • 32419 (matches this search)

    Has construction funding been committed to Hamilton Southern Links since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32420 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Hamilton Southern Links since 27 November 2023 that were not progressed?

  • 32421 (matches this search)

    What is the current status of Hamilton Southern Links in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32422 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Hamilton Southern Links that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32423 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Hamilton Southern Links as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32424 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Hamilton Southern Links since 27 November 2023, and what is their combined value?

  • 32425 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Hamilton Southern Links, broken down by financial year and by supplier, since 27 November 2023?

  • 32426 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Hamilton Southern Links remains unspent as at 30 June 2026?

  • 32427 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Hamilton Southern Links since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32428 (matches this search)

    What further expenditure, if any, would be required to keep SH29 Tauriko (wider scope) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32429 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH29 Tauriko (wider scope) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32430 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH29 Tauriko (wider scope), including any consenting appeals or litigation, since 27 November 2023?

  • 32431 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH29 Tauriko (wider scope) since 27 November 2023?

  • 32432 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH29 Tauriko (wider scope) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32433 (matches this search)

    Has construction funding been committed to SH29 Tauriko (wider scope) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32434 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH29 Tauriko (wider scope), in total and broken down by financial year, since 27 November 2023?

  • 32435 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH29 Tauriko (wider scope) per month, on average, since 27 November 2023?

  • 32436 (matches this search)

    What is the current status of SH29 Tauriko (wider scope) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32437 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH29 Tauriko (wider scope) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32438 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH29 Tauriko (wider scope) since 27 November 2023 that were not progressed?

  • 32439 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH29 Tauriko (wider scope) since 27 November 2023, and what is their combined value?

  • 32440 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH29 Tauriko (wider scope), broken down by financial year and by supplier, since 27 November 2023?

  • 32441 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH29 Tauriko (wider scope) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32442 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH29 Tauriko (wider scope) remains unspent as at 30 June 2026?

  • 32443 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH29 Tauriko (wider scope) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32444 (matches this search)

    What further expenditure, if any, would be required to keep the Northland Corridor Alternative to Brynderwyn Hills "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32445 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Northland Corridor Alternative to Brynderwyn Hills over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32446 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northland Corridor Alternative to Brynderwyn Hills, including any consenting appeals or litigation, since 27 November 2023?

  • 32447 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023?

  • 32448 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32449 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northland Corridor Alternative to Brynderwyn Hills, in total and broken down by financial year, since 27 November 2023?

  • 32450 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northland Corridor Alternative to Brynderwyn Hills per month, on average, since 27 November 2023?

  • 32451 (matches this search)

    Has construction funding been committed to the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32452 (matches this search)

    What is the current status of the Northland Corridor Alternative to Brynderwyn Hills in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32453 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023 that were not progressed?

  • 32454 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northland Corridor Alternative to Brynderwyn Hills as a result of a change in government direction since 27 November 2023; if so,…

  • 32455 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northland Corridor Alternative to Brynderwyn Hills that has since been superseded, discarded, or rendered obsolete by a…

  • 32456 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023, and what is their combined value?

  • 32457 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northland Corridor Alternative to Brynderwyn Hills remains unspent as at 30 June 2026?

  • 32458 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northland Corridor Alternative to Brynderwyn Hills, broken down by financial year and by…

  • 32459 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition,…

  • 32460 (matches this search)

    What further expenditure, if any, would be required to keep SH1 Wellington Improvements "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32461 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH1 Wellington Improvements over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32462 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Wellington Improvements, including any consenting appeals or litigation, since 27 November 2023?

  • 32463 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Wellington Improvements since 27 November 2023?

  • 32464 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Wellington Improvements since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32465 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Wellington Improvements, in total and broken down by financial year, since 27 November 2023?

  • 32466 (matches this search)

    Has construction funding been committed to SH1 Wellington Improvements since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32467 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Wellington Improvements per month, on average, since 27 November 2023?

  • 32468 (matches this search)

    What is the current status of SH1 Wellington Improvements in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32469 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH1 Wellington Improvements since 27 November 2023 that were not progressed?

  • 32470 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Wellington Improvements as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32471 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Wellington Improvements that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32472 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Wellington Improvements since 27 November 2023, and what is their combined value?

  • 32473 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Wellington Improvements, broken down by financial year and by supplier, since 27 November 2023?

  • 32474 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Wellington Improvements remains unspent as at 30 June 2026?

  • 32475 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Wellington Improvements since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32476 (matches this search)

    What further expenditure, if any, would be required to keep SH6 Hope Bypass Stage 1 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32477 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH6 Hope Bypass Stage 1, including any consenting appeals or litigation, since 27 November 2023?

  • 32478 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH6 Hope Bypass Stage 1 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32479 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH6 Hope Bypass Stage 1 since 27 November 2023?

  • 32480 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH6 Hope Bypass Stage 1 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32481 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH6 Hope Bypass Stage 1, in total and broken down by financial year, since 27 November 2023?

  • 32482 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH6 Hope Bypass Stage 1 per month, on average, since 27 November 2023?

  • 32483 (matches this search)

    Has construction funding been committed to SH6 Hope Bypass Stage 1 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32484 (matches this search)

    What is the current status of SH6 Hope Bypass Stage 1 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32485 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH6 Hope Bypass Stage 1 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32486 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH6 Hope Bypass Stage 1 since 27 November 2023 that were not progressed?

  • 32487 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH6 Hope Bypass Stage 1 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32488 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH6 Hope Bypass Stage 1 since 27 November 2023, and what is their combined value?

  • 32489 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH6 Hope Bypass Stage 1, broken down by financial year and by supplier, since 27 November 2023?

  • 32490 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH6 Hope Bypass Stage 1 remains unspent as at 30 June 2026?

  • 32491 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH6 Hope Bypass Stage 1 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32492 (matches this search)

    What further expenditure, if any, would be required to keep Takitimu North Link Stage 2A "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32493 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Takitimu North Link Stage 2A over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32494 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Takitimu North Link Stage 2A, including any consenting appeals or litigation, since 27 November 2023?

  • 32495 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Takitimu North Link Stage 2A since 27 November 2023?

  • 32496 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Takitimu North Link Stage 2A since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32497 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Takitimu North Link Stage 2A, in total and broken down by financial year, since 27 November 2023?

  • 32498 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Takitimu North Link Stage 2A per month, on average, since 27 November 2023?

  • 32499 (matches this search)

    Has construction funding been committed to Takitimu North Link Stage 2A since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32500 (matches this search)

    What is the current status of Takitimu North Link Stage 2A in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32501 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Takitimu North Link Stage 2A since 27 November 2023 that were not progressed?

  • 32502 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Takitimu North Link Stage 2A as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32503 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Takitimu North Link Stage 2A that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32504 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Takitimu North Link Stage 2A since 27 November 2023, and what is their combined value?

  • 32505 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Takitimu North Link Stage 2A, broken down by financial year and by supplier, since 27 November 2023?

  • 32506 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Takitimu North Link Stage 2A remains unspent as at 30 June 2026?

  • 32507 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Takitimu North Link Stage 2A since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32508 (matches this search)

    What further expenditure, if any, would be required to keep Mill Road Stage 1 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32509 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Mill Road Stage 1 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32510 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Mill Road Stage 1, including any consenting appeals or litigation, since 27 November 2023?

  • 32511 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Mill Road Stage 1 since 27 November 2023?

  • 32512 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Mill Road Stage 1 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32513 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Mill Road Stage 1, in total and broken down by financial year, since 27 November 2023?

  • 32514 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Mill Road Stage 1 per month, on average, since 27 November 2023?

  • 32515 (matches this search)

    Has construction funding been committed to Mill Road Stage 1 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32516 (matches this search)

    What is the current status of Mill Road Stage 1 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32517 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Mill Road Stage 1 since 27 November 2023 that were not progressed?

  • 32518 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Mill Road Stage 1 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work…

  • 32519 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Mill Road Stage 1 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32520 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Mill Road Stage 1 since 27 November 2023, and what is their combined value?

  • 32521 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Mill Road Stage 1, broken down by financial year and by supplier, since 27 November 2023?

  • 32522 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Mill Road Stage 1 remains unspent as at 30 June 2026?

  • 32523 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Mill Road Stage 1 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32524 (matches this search)

    What further expenditure, if any, would be required to keep the SH1 Belfast to Pegasus Motorway and Woodend Bypass "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32525 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the SH1 Belfast to Pegasus Motorway and Woodend Bypass over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32526 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass, including any consenting appeals or litigation, since 27 November 2023?

  • 32527 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023?

  • 32528 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32529 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass, in total and broken down by financial year, since 27 November 2023?

  • 32530 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the SH1 Belfast to Pegasus Motorway and Woodend Bypass per month, on average, since 27 November 2023?

  • 32531 (matches this search)

    What is the current status of the SH1 Belfast to Pegasus Motorway and Woodend Bypass in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32532 (matches this search)

    Has construction funding been committed to the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32533 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023 that were not progressed?

  • 32534 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the SH1 Belfast to Pegasus Motorway and Woodend Bypass as a result of a change in government direction since 27 November 2023; if so,…

  • 32535 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the SH1 Belfast to Pegasus Motorway and Woodend Bypass that has since been superseded, discarded, or rendered obsolete by a…

  • 32536 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023, and what is their combined value?

  • 32537 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass, broken down by financial year and by…

  • 32538 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the SH1 Belfast to Pegasus Motorway and Woodend Bypass remains unspent as at 30 June 2026?

  • 32539 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition,…

  • 32540 (matches this search)

    What further expenditure, if any, would be required to keep Airport to Botany Busway Stage 2 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32541 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Airport to Botany Busway Stage 2 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32542 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Airport to Botany Busway Stage 2, including any consenting appeals or litigation, since 27 November 2023?

  • 32543 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Airport to Botany Busway Stage 2 since 27 November 2023?

  • 32544 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Airport to Botany Busway Stage 2 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32545 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Airport to Botany Busway Stage 2, in total and broken down by financial year, since 27 November 2023?

  • 32546 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Airport to Botany Busway Stage 2 per month, on average, since 27 November 2023?

  • 32547 (matches this search)

    Has construction funding been committed to Airport to Botany Busway Stage 2 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32548 (matches this search)

    What is the current status of Airport to Botany Busway Stage 2 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32549 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Airport to Botany Busway Stage 2 since 27 November 2023 that were not progressed?

  • 32550 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Airport to Botany Busway Stage 2 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did…

  • 32551 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Airport to Botany Busway Stage 2 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32552 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Airport to Botany Busway Stage 2 since 27 November 2023, and what is their combined value?

  • 32553 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Airport to Botany Busway Stage 2, broken down by financial year and by supplier, since 27 November…

  • 32554 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Airport to Botany Busway Stage 2 remains unspent as at 30 June 2026?

  • 32555 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Airport to Botany Busway Stage 2 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32556 (matches this search)

    What further expenditure, if any, would be required to keep the Auckland Level Crossings Removal project at Takaanini "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32557 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Auckland Level Crossings Removal project at Takaanini over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32558 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Auckland Level Crossings Removal project at Takaanini, including any consenting appeals or litigation, since 27 November 2023?

  • 32559 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Auckland Level Crossings Removal project at Takaanini since 27 November 2023?

  • 32560 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Auckland Level Crossings Removal project at Takaanini since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32561 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Auckland Level Crossings Removal project at Takaanini, in total and broken down by financial year, since 27 November 2023?

  • 32562 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Auckland Level Crossings Removal project at Takaanini per month, on average, since 27 November 2023?

  • 32563 (matches this search)

    Has construction funding been committed to the Auckland Level Crossings Removal project at Takaanini since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32564 (matches this search)

    What is the current status of the Auckland Level Crossings Removal project at Takaanini in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32565 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Auckland Level Crossings Removal project at Takaanini since 27 November 2023 that were not progressed?

  • 32566 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Auckland Level Crossings Removal project at Takaanini as a result of a change in government direction since 27 November 2023; if so,…

  • 32567 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Auckland Level Crossings Removal project at Takaanini that has since been superseded, discarded, or rendered obsolete by a…

  • 32568 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Auckland Level Crossings Removal project at Takaanini since 27 November 2023, and what is their combined value?

  • 32569 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Auckland Level Crossings Removal project at Takaanini remains unspent as at 30 June 2026?

  • 32570 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Auckland Level Crossings Removal project at Takaanini, broken down by financial year and by…

  • 32571 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Auckland Level Crossings Removal project at Takaanini since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition,…

  • 32572 (matches this search)

    What further expenditure, if any, would be required to keep Eastern Busway Stage 4 (excluding Botany Station) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32573 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Eastern Busway Stage 4 (excluding Botany Station) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32574 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Eastern Busway Stage 4 (excluding Botany Station), including any consenting appeals or litigation, since 27 November 2023?

  • 32575 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023?

  • 32576 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32577 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Eastern Busway Stage 4 (excluding Botany Station), in total and broken down by financial year, since 27 November 2023?

  • 32578 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Eastern Busway Stage 4 (excluding Botany Station) per month, on average, since 27 November 2023?

  • 32579 (matches this search)

    Has construction funding been committed to Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32580 (matches this search)

    What is the current status of Eastern Busway Stage 4 (excluding Botany Station) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32581 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023 that were not progressed?

  • 32582 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Eastern Busway Stage 4 (excluding Botany Station) as a result of a change in government direction since 27 November 2023; if so, what, if…

  • 32583 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Eastern Busway Stage 4 (excluding Botany Station) that has since been superseded, discarded, or rendered obsolete by a change in…

  • 32584 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Eastern Busway Stage 4 (excluding Botany Station), broken down by financial year and by supplier,…

  • 32585 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023, and what is their combined value?

  • 32586 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Eastern Busway Stage 4 (excluding Botany Station) remains unspent as at 30 June 2026?

  • 32587 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32588 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Lower North Island Rail Integrated Mobility (LNIRIM) project over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32589 (matches this search)

    What further expenditure, if any, would be required to keep the Lower North Island Rail Integrated Mobility (LNIRIM) project "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme…

  • 32590 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project, including any consenting appeals or litigation, since 27 November 2023?

  • 32591 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023?

  • 32592 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023 that are not currently required for construction, and what is their…

  • 32593 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project, in total and broken down by financial year, since 27 November 2023?

  • 32594 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Lower North Island Rail Integrated Mobility (LNIRIM) project per month, on average, since 27 November 2023?

  • 32595 (matches this search)

    Has construction funding been committed to the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32596 (matches this search)

    What is the current status of the Lower North Island Rail Integrated Mobility (LNIRIM) project in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32597 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023 that were not progressed?

  • 32598 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Lower North Island Rail Integrated Mobility (LNIRIM) project as a result of a change in government direction since 27 November 2023;…

  • 32599 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Lower North Island Rail Integrated Mobility (LNIRIM) project that has since been superseded, discarded, or rendered obsolete…

  • 32600 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project, broken down by financial year and…

  • 32601 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023, and what is their combined value?

  • 32602 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Lower North Island Rail Integrated Mobility (LNIRIM) project remains unspent as at 30 June 2026?

  • 32603 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property…

  • 32604 (matches this search)

    What further expenditure, if any, would be required to keep the Waikare Gorge realignment "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32605 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Waikare Gorge realignment over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32606 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Waikare Gorge realignment, including any consenting appeals or litigation, since 27 November 2023?

  • 32607 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Waikare Gorge realignment since 27 November 2023?

  • 32608 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Waikare Gorge realignment since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32609 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Waikare Gorge realignment, in total and broken down by financial year, since 27 November 2023?

  • 32610 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Waikare Gorge realignment per month, on average, since 27 November 2023?

  • 32611 (matches this search)

    Has construction funding been committed to the Waikare Gorge realignment since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32612 (matches this search)

    What is the current status of the Waikare Gorge realignment in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32613 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Waikare Gorge realignment since 27 November 2023 that were not progressed?

  • 32614 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Waikare Gorge realignment as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32615 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Waikare Gorge realignment that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32616 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Waikare Gorge realignment since 27 November 2023, and what is their combined value?

  • 32617 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Waikare Gorge realignment, broken down by financial year and by supplier, since 27 November 2023?

  • 32618 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Waikare Gorge realignment remains unspent as at 30 June 2026?

  • 32619 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Waikare Gorge realignment since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32620 (matches this search)

    What further expenditure, if any, would be required to keep the Northwest Busway – Te Ara Hauāuru Stage 1A "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32621 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Northwest Busway – Te Ara Hauāuru Stage 1A over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32622 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A, including any consenting appeals or litigation, since 27 November 2023?

  • 32623 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023?

  • 32624 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023 that are not currently required for construction, and what is their combined purchase…

  • 32625 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A, in total and broken down by financial year, since 27 November 2023?

  • 32626 (matches this search)

    Has construction funding been committed to the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32627 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 1A per month, on average, since 27 November 2023?

  • 32628 (matches this search)

    What is the current status of the Northwest Busway – Te Ara Hauāuru Stage 1A in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32629 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023 that were not progressed?

  • 32630 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A, broken down by financial year and by supplier, since…

  • 32631 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023, and what is their combined value?

  • 32632 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northwest Busway – Te Ara Hauāuru Stage 1A as a result of a change in government direction since 27 November 2023; if so, what, if…

  • 32633 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northwest Busway – Te Ara Hauāuru Stage 1A that has since been superseded, discarded, or rendered obsolete by a change in…

  • 32634 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northwest Busway – Te Ara Hauāuru Stage 1A remains unspent as at 30 June 2026?

  • 32635 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32636 (matches this search)

    What further expenditure, if any, would be required to keep the Second Ashburton Bridge project "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32637 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Second Ashburton Bridge project over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32638 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Second Ashburton Bridge project since 27 November 2023?

  • 32639 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Second Ashburton Bridge project, including any consenting appeals or litigation, since 27 November 2023?

  • 32640 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Second Ashburton Bridge project since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32641 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Second Ashburton Bridge project, in total and broken down by financial year, since 27 November 2023?

  • 32642 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Second Ashburton Bridge project per month, on average, since 27 November 2023?

  • 32643 (matches this search)

    Has construction funding been committed to the Second Ashburton Bridge project since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32644 (matches this search)

    What is the current status of the Second Ashburton Bridge project in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32645 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Second Ashburton Bridge project since 27 November 2023 that were not progressed?

  • 32646 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Second Ashburton Bridge project as a result of a change in government direction since 27 November 2023; if so, what, if anything, did…

  • 32647 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Second Ashburton Bridge project that has since been superseded, discarded, or rendered obsolete by a change in scope or…

  • 32648 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Second Ashburton Bridge project since 27 November 2023, and what is their combined value?

  • 32649 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Second Ashburton Bridge project, broken down by financial year and by supplier, since 27…

  • 32650 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Second Ashburton Bridge project remains unspent as at 30 June 2026?

  • 32651 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Second Ashburton Bridge project since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32652 (matches this search)

    What further expenditure, if any, would be required to keep SH76 Brougham Street improvements Package 2 (corridor) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32653 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH76 Brougham Street improvements Package 2 (corridor) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32654 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH76 Brougham Street improvements Package 2 (corridor), including any consenting appeals or litigation, since 27 November 2023?

  • 32655 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023?

  • 32656 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32657 (matches this search)

    Has construction funding been committed to SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32658 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH76 Brougham Street improvements Package 2 (corridor) per month, on average, since 27 November 2023?

  • 32659 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH76 Brougham Street improvements Package 2 (corridor), in total and broken down by financial year, since 27 November 2023?

  • 32660 (matches this search)

    What is the current status of SH76 Brougham Street improvements Package 2 (corridor) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32661 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH76 Brougham Street improvements Package 2 (corridor) as a result of a change in government direction since 27 November 2023; if so,…

  • 32662 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023 that were not progressed?

  • 32663 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH76 Brougham Street improvements Package 2 (corridor) that has since been superseded, discarded, or rendered obsolete by a…

  • 32664 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023, and what is their combined value?

  • 32665 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH76 Brougham Street improvements Package 2 (corridor), broken down by financial year and by…

  • 32666 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH76 Brougham Street improvements Package 2 (corridor) remains unspent as at 30 June 2026?

  • 32667 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition,…

  • 32668 (matches this search)

    What further expenditure, if any, would be required to keep SH76 Brougham Street improvements Package 1 (bridge) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32669 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH76 Brougham Street improvements Package 1 (bridge) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32670 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023?

  • 32671 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH76 Brougham Street improvements Package 1 (bridge), including any consenting appeals or litigation, since 27 November 2023?

  • 32672 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32673 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH76 Brougham Street improvements Package 1 (bridge), in total and broken down by financial year, since 27 November 2023?

  • 32674 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH76 Brougham Street improvements Package 1 (bridge) per month, on average, since 27 November 2023?

  • 32675 (matches this search)

    Has construction funding been committed to SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32676 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023 that were not progressed?

  • 32677 (matches this search)

    What is the current status of SH76 Brougham Street improvements Package 1 (bridge) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32678 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH76 Brougham Street improvements Package 1 (bridge) as a result of a change in government direction since 27 November 2023; if so, what,…

  • 32679 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH76 Brougham Street improvements Package 1 (bridge) that has since been superseded, discarded, or rendered obsolete by a change…

  • 32680 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023, and what is their combined value?

  • 32681 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH76 Brougham Street improvements Package 1 (bridge) remains unspent as at 30 June 2026?

  • 32682 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH76 Brougham Street improvements Package 1 (bridge), broken down by financial year and by supplier,…

  • 32683 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition,…

  • 32684 (matches this search)

    What further expenditure, if any, would be required to keep SH1 Rolleston Access improvements Package 2 (flyover) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32685 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH1 Rolleston Access improvements Package 2 (flyover) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32686 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Rolleston Access improvements Package 2 (flyover), including any consenting appeals or litigation, since 27 November 2023?

  • 32687 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023?

  • 32688 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32689 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Rolleston Access improvements Package 2 (flyover), in total and broken down by financial year, since 27 November 2023?

  • 32690 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Rolleston Access improvements Package 2 (flyover) per month, on average, since 27 November 2023?

  • 32691 (matches this search)

    Has construction funding been committed to SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32692 (matches this search)

    What is the current status of SH1 Rolleston Access improvements Package 2 (flyover) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32693 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023 that were not progressed?

  • 32694 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Rolleston Access improvements Package 2 (flyover) as a result of a change in government direction since 27 November 2023; if so, what,…

  • 32695 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Rolleston Access improvements Package 2 (flyover) that has since been superseded, discarded, or rendered obsolete by a…

  • 32696 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023, and what is their combined value?

  • 32697 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition,…

  • 32698 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Rolleston Access improvements Package 2 (flyover), broken down by financial year and by…

  • 32699 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Rolleston Access improvements Package 2 (flyover) remains unspent as at 30 June 2026?

  • 32700 (matches this search)

    What further expenditure, if any, would be required to keep SH1 Rolleston Access improvements Package 1 (roundabout) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32701 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH1 Rolleston Access improvements Package 1 (roundabout) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32702 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023?

  • 32703 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Rolleston Access improvements Package 1 (roundabout), including any consenting appeals or litigation, since 27 November 2023?

  • 32704 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023 that are not currently required for construction, and what is their combined…

  • 32705 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Rolleston Access improvements Package 1 (roundabout) per month, on average, since 27 November 2023?

  • 32706 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Rolleston Access improvements Package 1 (roundabout), in total and broken down by financial year, since 27 November 2023?

  • 32707 (matches this search)

    Has construction funding been committed to SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32708 (matches this search)

    What is the current status of SH1 Rolleston Access improvements Package 1 (roundabout) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32709 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023 that were not progressed?

  • 32710 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Rolleston Access improvements Package 1 (roundabout) that has since been superseded, discarded, or rendered obsolete by a…

  • 32711 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Rolleston Access improvements Package 1 (roundabout) as a result of a change in government direction since 27 November 2023; if so,…

  • 32712 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023, and what is their combined value?

  • 32713 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Rolleston Access improvements Package 1 (roundabout), broken down by financial year and by…

  • 32714 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Rolleston Access improvements Package 1 (roundabout) remains unspent as at 30 June 2026?

  • 32715 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition,…

  • 32716 (matches this search)

    What further expenditure, if any, would be required to keep the SH75 Halswell Road improvements "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32717 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the SH75 Halswell Road improvements over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32718 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the SH75 Halswell Road improvements, including any consenting appeals or litigation, since 27 November 2023?

  • 32719 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the SH75 Halswell Road improvements since 27 November 2023?

  • 32720 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the SH75 Halswell Road improvements since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32721 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the SH75 Halswell Road improvements, in total and broken down by financial year, since 27 November 2023?

  • 32722 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the SH75 Halswell Road improvements per month, on average, since 27 November 2023?

  • 32723 (matches this search)

    What is the current status of the SH75 Halswell Road improvements in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32724 (matches this search)

    Has construction funding been committed to the SH75 Halswell Road improvements since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32725 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the SH75 Halswell Road improvements since 27 November 2023 that were not progressed?

  • 32726 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the SH75 Halswell Road improvements as a result of a change in government direction since 27 November 2023; if so, what, if anything, did…

  • 32727 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the SH75 Halswell Road improvements that has since been superseded, discarded, or rendered obsolete by a change in scope or…

  • 32728 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the SH75 Halswell Road improvements since 27 November 2023, and what is their combined value?

  • 32729 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the SH75 Halswell Road improvements, broken down by financial year and by supplier, since 27…

  • 32730 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the SH75 Halswell Road improvements remains unspent as at 30 June 2026?

  • 32731 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the SH75 Halswell Road improvements since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32732 (matches this search)

    What further expenditure, if any, would be required to keep the Queenstown Package "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32733 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Queenstown Package over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32734 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Queenstown Package, including any consenting appeals or litigation, since 27 November 2023?

  • 32735 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Queenstown Package since 27 November 2023?

  • 32736 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Queenstown Package since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32737 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Queenstown Package, in total and broken down by financial year, since 27 November 2023?

  • 32738 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Queenstown Package per month, on average, since 27 November 2023?

  • 32739 (matches this search)

    Has construction funding been committed to the Queenstown Package since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32740 (matches this search)

    What is the current status of the Queenstown Package in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32741 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Queenstown Package since 27 November 2023 that were not progressed?

  • 32742 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Queenstown Package as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated…

  • 32743 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Queenstown Package that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32744 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Queenstown Package since 27 November 2023, and what is their combined value?

  • 32745 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Queenstown Package, broken down by financial year and by supplier, since 27 November 2023?

  • 32746 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Queenstown Package remains unspent as at 30 June 2026?

  • 32747 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Queenstown Package since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32748 (matches this search)

    What further expenditure, if any, would be required to keep the SH2 Melling Transport Improvements project "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32749 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the SH2 Melling Transport Improvements project over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32750 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the SH2 Melling Transport Improvements project, including any consenting appeals or litigation, since 27 November 2023?

  • 32751 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the SH2 Melling Transport Improvements project since 27 November 2023?

  • 32752 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the SH2 Melling Transport Improvements project since 27 November 2023 that are not currently required for construction, and what is their combined purchase…

  • 32753 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the SH2 Melling Transport Improvements project, in total and broken down by financial year, since 27 November 2023?

  • 32754 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the SH2 Melling Transport Improvements project per month, on average, since 27 November 2023?

  • 32755 (matches this search)

    Has construction funding been committed to the SH2 Melling Transport Improvements project since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32756 (matches this search)

    What is the current status of the SH2 Melling Transport Improvements project in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32757 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the SH2 Melling Transport Improvements project since 27 November 2023 that were not progressed?

  • 32758 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the SH2 Melling Transport Improvements project as a result of a change in government direction since 27 November 2023; if so, what, if…

  • 32759 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the SH2 Melling Transport Improvements project that has since been superseded, discarded, or rendered obsolete by a change in…

  • 32760 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the SH2 Melling Transport Improvements project since 27 November 2023, and what is their combined value?

  • 32761 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the SH2 Melling Transport Improvements project, broken down by financial year and by supplier, since…

  • 32762 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the SH2 Melling Transport Improvements project remains unspent as at 30 June 2026?

  • 32763 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the SH2 Melling Transport Improvements project since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32764 (matches this search)

    What further expenditure, if any, would be required to keep SH58 Safety Improvements Stage 2 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32765 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH58 Safety Improvements Stage 2 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32766 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH58 Safety Improvements Stage 2 since 27 November 2023?

  • 32767 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH58 Safety Improvements Stage 2, including any consenting appeals or litigation, since 27 November 2023?

  • 32768 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH58 Safety Improvements Stage 2 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32769 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH58 Safety Improvements Stage 2, in total and broken down by financial year, since 27 November 2023?

  • 32770 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH58 Safety Improvements Stage 2 per month, on average, since 27 November 2023?

  • 32771 (matches this search)

    Has construction funding been committed to SH58 Safety Improvements Stage 2 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32772 (matches this search)

    What is the current status of SH58 Safety Improvements Stage 2 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32773 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH58 Safety Improvements Stage 2 since 27 November 2023 that were not progressed?

  • 32774 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH58 Safety Improvements Stage 2 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did…

  • 32775 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH58 Safety Improvements Stage 2 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32776 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH58 Safety Improvements Stage 2 since 27 November 2023, and what is their combined value?

  • 32777 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH58 Safety Improvements Stage 2, broken down by financial year and by supplier, since 27 November…

  • 32778 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH58 Safety Improvements Stage 2 remains unspent as at 30 June 2026?

  • 32779 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH58 Safety Improvements Stage 2 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32780 (matches this search)

    What further expenditure, if any, would be required to keep the Waihoehoe Road (Drury Upgrade) project "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32781 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Waihoehoe Road (Drury Upgrade) project over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32782 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Waihoehoe Road (Drury Upgrade) project, including any consenting appeals or litigation, since 27 November 2023?

  • 32783 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Waihoehoe Road (Drury Upgrade) project since 27 November 2023?

  • 32784 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Waihoehoe Road (Drury Upgrade) project, in total and broken down by financial year, since 27 November 2023?

  • 32785 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Waihoehoe Road (Drury Upgrade) project since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32786 (matches this search)

    Has construction funding been committed to the Waihoehoe Road (Drury Upgrade) project since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32787 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Waihoehoe Road (Drury Upgrade) project per month, on average, since 27 November 2023?

  • 32788 (matches this search)

    What is the current status of the Waihoehoe Road (Drury Upgrade) project in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32789 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Waihoehoe Road (Drury Upgrade) project since 27 November 2023 that were not progressed?

  • 32790 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Waihoehoe Road (Drury Upgrade) project as a result of a change in government direction since 27 November 2023; if so, what, if…

  • 32791 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Waihoehoe Road (Drury Upgrade) project that has since been superseded, discarded, or rendered obsolete by a change in scope…

  • 32792 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Waihoehoe Road (Drury Upgrade) project since 27 November 2023, and what is their combined value?

  • 32793 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Waihoehoe Road (Drury Upgrade) project, broken down by financial year and by supplier, since 27…

  • 32794 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Waihoehoe Road (Drury Upgrade) project since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32795 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Waihoehoe Road (Drury Upgrade) project remains unspent as at 30 June 2026?

  • 32796 (matches this search)

    What further expenditure, if any, would be required to keep SH1 Papakura to Drury "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32797 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH1 Papakura to Drury over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32798 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Papakura to Drury, including any consenting appeals or litigation, since 27 November 2023?

  • 32799 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Papakura to Drury since 27 November 2023?

  • 32800 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Papakura to Drury since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32801 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Papakura to Drury, in total and broken down by financial year, since 27 November 2023?

  • 32802 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Papakura to Drury per month, on average, since 27 November 2023?

  • 32803 (matches this search)

    Has construction funding been committed to SH1 Papakura to Drury since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32804 (matches this search)

    What is the current status of SH1 Papakura to Drury in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32805 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH1 Papakura to Drury since 27 November 2023 that were not progressed?

  • 32806 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Papakura to Drury as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated…

  • 32807 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Papakura to Drury that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32808 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Papakura to Drury since 27 November 2023, and what is their combined value?

  • 32809 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Papakura to Drury, broken down by financial year and by supplier, since 27 November 2023?

  • 32810 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Papakura to Drury remains unspent as at 30 June 2026?

  • 32811 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Papakura to Drury since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32812 (matches this search)

    What further expenditure, if any, would be required to keep Penlink O Mahurangi "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32814 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on Penlink O Mahurangi over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32816 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to Penlink O Mahurangi, including any consenting appeals or litigation, since 27 November 2023?

  • 32817 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Penlink O Mahurangi since 27 November 2023?

  • 32819 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to Penlink O Mahurangi since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32820 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Penlink O Mahurangi, in total and broken down by financial year, since 27 November 2023?

  • 32821 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Penlink O Mahurangi per month, on average, since 27 November 2023?

  • 32822 (matches this search)

    What is the current status of Penlink O Mahurangi in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32823 (matches this search)

    Has construction funding been committed to Penlink O Mahurangi since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32824 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for Penlink O Mahurangi since 27 November 2023 that were not progressed?

  • 32825 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Penlink O Mahurangi as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated…

  • 32826 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to Penlink O Mahurangi since 27 November 2023, and what is their combined value?

  • 32827 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Penlink O Mahurangi that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32828 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Penlink O Mahurangi, broken down by financial year and by supplier, since 27 November 2023?

  • 32829 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for Penlink O Mahurangi remains unspent as at 30 June 2026?

  • 32830 (matches this search)

    How much, if any, has the NZ Transport Agency spent on Penlink O Mahurangi since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32831 (matches this search)

    What further expenditure, if any, would be required to keep SH29 Tauriko (Ōmanawa Bridge) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32832 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH29 Tauriko (Ōmanawa Bridge) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32833 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH29 Tauriko (Ōmanawa Bridge), including any consenting appeals or litigation, since 27 November 2023?

  • 32834 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32835 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023?

  • 32836 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH29 Tauriko (Ōmanawa Bridge), in total and broken down by financial year, since 27 November 2023?

  • 32837 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH29 Tauriko (Ōmanawa Bridge) per month, on average, since 27 November 2023?

  • 32838 (matches this search)

    What is the current status of SH29 Tauriko (Ōmanawa Bridge) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32839 (matches this search)

    Has construction funding been committed to SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32840 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023 that were not progressed?

  • 32841 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH29 Tauriko (Ōmanawa Bridge) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32842 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH29 Tauriko (Ōmanawa Bridge) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32843 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023, and what is their combined value?

  • 32844 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH29 Tauriko (Ōmanawa Bridge), broken down by financial year and by supplier, since 27 November 2023?

  • 32846 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH29 Tauriko (Ōmanawa Bridge) remains unspent as at 30 June 2026?

  • 32847 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design,…

  • 32849 (matches this search)

    What further expenditure, if any, would be required to keep SH1 Cambridge to Piarere "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32850 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Cambridge to Piarere, including any consenting appeals or litigation, since 27 November 2023?

  • 32851 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Cambridge to Piarere since 27 November 2023?

  • 32852 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on SH1 Cambridge to Piarere over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32853 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Cambridge to Piarere since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?

  • 32854 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Cambridge to Piarere, in total and broken down by financial year, since 27 November 2023?

  • 32855 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Cambridge to Piarere per month, on average, since 27 November 2023?

  • 32856 (matches this search)

    Has construction funding been committed to SH1 Cambridge to Piarere since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32857 (matches this search)

    What is the current status of SH1 Cambridge to Piarere in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32858 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for SH1 Cambridge to Piarere since 27 November 2023 that were not progressed?

  • 32859 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Cambridge to Piarere as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that…

  • 32860 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Cambridge to Piarere that has since been superseded, discarded, or rendered obsolete by a change in scope or route?

  • 32861 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Cambridge to Piarere since 27 November 2023, and what is their combined value?

  • 32862 (matches this search)

    How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Cambridge to Piarere remains unspent as at 30 June 2026?

  • 32863 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Cambridge to Piarere, broken down by financial year and by supplier, since 27 November 2023?

  • 32864 (matches this search)

    How much, if any, has the NZ Transport Agency spent on SH1 Cambridge to Piarere since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?

  • 32865 (matches this search)

    What further expenditure, if any, would be required to keep the Northland Corridor (Warkworth to Te Hana) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?

  • 32866 (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on the Northland Corridor (Warkworth to Te Hana) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?

  • 32867 (matches this search)

    How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northland Corridor (Warkworth to Te Hana), including any consenting appeals or litigation, since 27 November 2023?

  • 32868 (matches this search)

    What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northland Corridor (Warkworth to Te Hana) since 27 November 2023?

  • 32869 (matches this search)

    How many properties, if any, has the NZ Transport Agency purchased in relation to the Northland Corridor (Warkworth to Te Hana) since 27 November 2023 that are not currently required for construction, and what is their combined purchase…

  • 32870 (matches this search)

    How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northland Corridor (Warkworth to Te Hana), in total and broken down by financial year, since 27 November 2023?

  • 32871 (matches this search)

    How much, if any, has the NZ Transport Agency spent on the Northland Corridor (Warkworth to Te Hana) per month, on average, since 27 November 2023?

  • 32872 (matches this search)

    Has construction funding been committed to the Northland Corridor (Warkworth to Te Hana) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?

  • 32873 (matches this search)

    What is the current status of the Northland Corridor (Warkworth to Te Hana) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?

  • 32874 (matches this search)

    What was the cost, if any, of any options or route alternatives investigated for the Northland Corridor (Warkworth to Te Hana) since 27 November 2023 that were not progressed?

  • 32875 (matches this search)

    Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northland Corridor (Warkworth to Te Hana) as a result of a change in government direction since 27 November 2023; if so, what, if…

  • 32876 (matches this search)

    How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northland Corridor (Warkworth to Te Hana) that has since been superseded, discarded, or rendered obsolete by a change in…

  • 32877 (matches this search)

    How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northland Corridor (Warkworth to Te Hana) since 27 November 2023, and what is their combined value?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

While I recognise there is significant public interest following my announcement of the Major Transport Projects Pipeline on 9 July 2026, responding to the information sought across a total of 653 questions (32220 (2026) to 32877 (2026)),…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How did the New Zealand Transport Agency calculate that the 114 year old Waihenga bridge outside Martinborough has a remaining lifespan of 20-30 years and what evidence, if any, does the agency have that confirms this calculation?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised the current assumed 20-to-40-year remaining life for the Waihenga Bridge was not calculated using a simple age-based formula. Rather, it is based on NZTA’s asset management approach and informed by ongoing structural…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 31968 (matches this search)

    What evidence has the New Zealand Transport Agency used to determine that “major improvements are not economically justified” for the Waihenga bridge and when was that evidence last examined in detail?

  • 31972 (matches this search)

    When, if at all, was the last time that the New Zealand Transport Agency undertook a replacement project feasibility report for the Waihenga bridge and when, if at all, will the next report be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that it used the Bridge Management Plan (BMP) as the governing document for the Waihenga Bridge. The latest BMP is from April 2021. Included in the BMP is a 2011 Project Feasibility Report (PFR). The PFR for Waihenga…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What were all of the extensive mitigation measures that the New Zealand Transport Agency have taken on the Waihenga bridge since 2021 and how, if at all, has each improved the condition or safety of the bridge?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZTA completed various inspections between 2022 and 2025, these included an audit inspection by the structure’s inspection engineer, structural inspections and post flood inspection. A structural inspection regime is in…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many vehicles, if any, does the New Zealand Transport Agency estimate used the Waihenga bridge each year in 2011, 2018, 2021 and 2025?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that average annual daily traffic count for these years are as follows: 2011: 2852 2018: 3350 2021: 3268 2025: 3214

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many heavy vehicles, including high productivity motor vehicles, if any, does the New Zealand Transport Agency estimate used the Waihenga bridge each year in 2011, 2018, 2021 and 2025?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that average annual daily traffic count for heavy vehicles are as follows: 2011: 258 2018: 354 2021: 293 2025: 351

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What information does the New Zealand Transport Agency require to consider future funding for replacing a bridge?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZTA considers future funding for bridge replacement through the relevant National Land Transport Programme (NLTP) funding work category, depending on whether the proposal is a renewal or an improvement. For an…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How does the New Zealand Transport Agency rank bridges for replacement and what formula, if any, is used?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZTA does not maintain a single, national ranking of all state highway bridges for replacement, and there is no single formula that ranks every potential bridge replacement across the network. NZTA regularly inspects and…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 31976 (matches this search)

    Where does the Waihenga bridge rank in the New Zealand Transport Agency’s bridge replacement rankings and how was that ranking determined?

  • 31977 (matches this search)

    What are all of the approximately 80 bridges nationwide that the New Zealand Transport Agency ranks higher for replacement than the Waihenga bridge and for each how is it ranked?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA has recently advised me that previous references to approximately 80 bridges being a higher replacement priority than the Waihenga Bridge are no longer considered accurate. Those references were derived from a 2011 document which NZTA…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many state highway bridges in use today, if any, does the New Zealand Transport Agency expect to have a total lifespan of 150 years or more?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZTA does not generally assess or maintain forecasts of the ultimate lifespan of individual state highway bridges for investment decision-making purposes. Bridges are designed for a specified design working life,…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many times, if any, has the Waihenga bridge on State Highway 53 been closed since 1 January 2026 and for each closure, on what date was it closed and on what date was it reopened?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that the NZTA has closed the bridge four times since 1 January 2026: • Closed on 20/4/2026 at 11:35pm and reopened on 23/04/2026 at 11:49am. • Closed on 26/6/2026 at 7:45pm and reopened on 28/6/2026 at 9:25pm. • Closed on…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30348 (2026), what proportion of the $531 million Picton works budget and the $325 million Wellington works budget is covered by signed fixed-price contracts rather than estimates, and what cost escalation provisions will…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Per our reply to 30348 (2026), early contractor involvement and various demolition and design tasks have been contracted while main works contracts will be entered later this year. To maintain the position of Ferry Holdings to carry out…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30347 (2026), what elements of the Government's negotiating position remain to be protected in respect of the agreements between Ferry Holdings and CentrePort, Port Marlborough and KiwiRail that reply 30346 (2026)…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

To use your language, those elements which are still under negotiation remain to be protected. With respect to finalised elements, we have released all information where it is possible to do so under the OIA. As work progresses, we will…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30345 (2026), what is the current forecast cost at completion for the Cook Strait ferry replacement programme against the budget approved by Cabinet, expressed as a dollar variance, if any?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

$1.704 billion is the current taxpayer budget for our contribution to the programme. This gives a variance of $0.000 billion against the budget approved by Cabinet. As a mathematical equation: $1.704 billion minus $1.704 billion equals…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30354 (2026), has Ferry Holdings Limited issued a formal notice to proceed, or equivalent instruction, authorising Guangzhou Shipyard International to begin building the two new Cook Strait ferries, as distinct from the…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the reply to 30354 (2026). The entire point of the contract is to build the two Cook Strait ferries.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30354 (2026), on what date was the fixed price contract with Guangzhou Shipyard International entered, and how does the Minister reconcile that date with the date of 15 November 2026 stated in the reply?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

15 November 2025. We have corrected the typo in the reply to 30354 (2026) and thank the member for drawing it to our attention.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30344 (2026), does a programmed delivery date for each vessel exist within the shipbuilding contract or the programme schedule, and if so, will the Minister release those dates; if not, why not?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Yes, and no. Rest assured, however, when we are in a position to announce the commencement dates the member will be among the first to know.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30352 (2026), in which quarter of 2027 is construction of the first vessel programmed to begin, and how is an end-of-2029 in-service date achievable if construction begins later than the first quarter of 2027 and vessels…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

May 2027 for the first vessel, which will enter service in the first half of 2029.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30352 (2026), how much time has been programmed between delivery of each vessel by Guangzhou Shipyard International and its entry into service on the Cook Strait for the delivery voyage, sea trials, Maritime New Zealand…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information will be released closer to 2029, but time is allocated for these matters to occur before the first vessel enters service in the first half of 2029.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30350 (2026), what is the value of the contingent liability recorded on the Crown's books in respect of the Crown guarantee provided to secure the shipyard deal?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information is not disclosed, as this would reveal the quantum of various milestone payments.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30350 (2026), has Guangzhou Shipyard International obtained the refund guarantee from a reputable bank required under the shipbuilding contract, and if so, on what date was it provided and does it cover the full value of…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Yes, as obtaining a refund guarantee was a condition to enter the contract. It is not the Government’s place to state the banking arrangements of a shipyard, except to say that Ferry Holdings and its assurance advisors were satisfied such…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30351 (2026), in what currency is the shipbuilding contract denominated, and what hedging arrangements, if any, are in place to protect the taxpayer against the foreign exchange movements to which the reply states the $596…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

USD. Hedging arrangements are in place for 66 percent of the remaining unpaid contract value. The balance is managed under the company’s foreign exchange management policy.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30351 (2026), what was the quantum of the first milestone payment made on signing in November 2025, and what proportion of the total contract price will have been paid before construction of the vessels commences?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information cannot be disclosed at this time, but as it is a fixed price contract the total payments add up to $596 million.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30349 (2026), what consequences arise under the shipbuilding contract if Final Approval to Deliver is not granted, including any break fees or forfeited payments, if any?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is a hypothetical question of no consequence as the Final Approval to Deliver Business Case has been completed and provided to shareholding Ministers. It will be released soon.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30349 (2026), was the first milestone payment to Guangzhou Shipyard International made before Final Approval to Deliver was granted, and if so, under what authority was that payment made?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Yes. Shareholding Ministers approved funding for Ferry Holdings to enter the shipyard contracts consistent with our delegations from Cabinet and on the recommendation of Ferry Holdings and the Treasury.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30346 (2026), which party or parties will bear any programme costs above $2 billion, should the overall cost of the programme exceed that figure?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

None, while we’re in charge anyway.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30346 (2026), how much of the $415 million allocated to programme management and total contingencies has been drawn down or committed to date, and against which risks or cost pressures was it drawn down or committed, if…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

$28 million has been spent on programme management as of 30 June 2026. This includes direct ship-related costs that sit outside the ship build contract (such as ship brokerage, naval architecture, and interior design), together with Ferry…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30346 (2026), which parties are meeting the difference between the estimated overall programme cost of $1.86 billion and the maximum taxpayer contribution of $1.704 billion, and what is each party's confirmed contribution?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

As announced on 17 July 2026: CentrePort Limited (that’s a port based in Wellington) is contributing $100 million, Port Marlborough (a port based in Picton) is contributing $110 million, and the New Zealand Transport Agency (an authority…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30343 (2026), what risks recorded on the programme risk register for the Cook Strait ferry replacement programme are currently rated as high or extreme, if any?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 30343 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 30343 (2026), what specific written advice, if any, has the Minister received from Ferry Holdings Limited, the Treasury, the Ministry of Transport, or any other officials since 1 January 2026 assessing the likelihood of…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Where it has been possible to release these titles and documents we have done so. The Treasury has also proactively released advice on its website leading up to our November 2025 announcement.

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

Matching question numbers: 31787 (2026), 31797 (2026), 31802 (2026), 31807 (2026), 31813 (2026), 31818 (2026), 31822 (2026), 31829 (2026), 31832 (2026), 31837 (2026), 31842 (2026), 31847 (2026), 31853 (2026)

  • 31765 (matches this search)

    What proportion, if any, of the more than $675 million approved by the NZ Transport Agency Board to progress consenting, design, route protection, site investigations and early works on the Roads of National Significance is allocated to…

  • 31771 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to the SH6 Hope Bypass; if not, in which cost categories is that expenditure recorded?

  • 31777 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass; if not, in which cost categories is that…

  • 31782 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to SH1 Wellington Improvements; if not, in which cost categories is that expenditure recorded?

Show the remaining 13 questions
  • 31787 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to Otaki to north of Levin; if not, in which cost categories is that expenditure recorded?

  • 31797 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to the Petone to Grenada Link Road; if not, in which cost categories is that expenditure recorded?

  • 31802 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to the SH2 Hawke's Bay Expressway; if not, in which cost categories is that expenditure recorded?

  • 31807 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to SH29 Tauriko (wider scope); if not, in which cost categories is that expenditure recorded?

  • 31813 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to SH29 Tauriko West - Omanawa Bridge; if not, in which cost categories is that expenditure recorded?

  • 31818 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to Takitimu North Link Stage 2; if not, in which cost categories is that expenditure recorded?

  • 31822 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to Takitimu North Link Stage 1; if not, in which cost categories is that expenditure recorded?

  • 31829 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to SH1 Cambridge to Piarere; if not, in which cost categories is that expenditure recorded?

  • 31832 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to Hamilton Southern Links; if not, in which cost categories is that expenditure recorded?

  • 31837 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to Mill Road; if not, in which cost categories is that expenditure recorded?

  • 31842 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to the East-West Link; if not, in which cost categories is that expenditure recorded?

  • 31847 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to the SH16 North-West Alternative State Highway; if not, in which cost categories is that expenditure…

  • 31853 (matches this search)

    Does the NZ Transport Agency record expenditure on public consultation and community engagement as a discrete cost category in relation to the Northland Corridor; if not, in which cost categories is that expenditure recorded?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Public consultation is not a discrete cost category and occurs throughout the project development lifecycle. Costs occur across investment case, property, pre-implementation and implementation phases.

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

Matching question numbers: 31778 (2026), 31781 (2026), 31783 (2026), 31786 (2026), 31788 (2026), 31796 (2026), 31798 (2026), 31801 (2026), 31803 (2026), 31806 (2026), 31808 (2026), 31811 (2026), 31812 (2026), 31816 (2026), 31817 (2026), 31821 (2026), 31823 (2026), 31826 (2026), 31827 (2026), 31831 (2026), 31833 (2026), 31836 (2026), 31838 (2026), 31841 (2026), 31843 (2026), 31846 (2026), 31848 (2026), 31851 (2026), 31852 (2026)

  • 31766 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement across all Roads of National Significance, in total and broken down by financial year and by project, since 27 November 2023?

  • 31770 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to the SH6 Hope Bypass, in total and broken down by financial…

  • 31772 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to the SH6 Hope Bypass, in total and broken down by financial year, since 27 November 2023?

  • 31776 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass, in…

Show the remaining 29 questions
  • 31778 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass, in total and broken down by financial year, since 27 November 2023?

  • 31781 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to SH1 Wellington Improvements, in total and broken down by…

  • 31783 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to SH1 Wellington Improvements, in total and broken down by financial year, since 27 November 2023?

  • 31786 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to Otaki to north of Levin, in total and broken down by…

  • 31788 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to Otaki to north of Levin, in total and broken down by financial year, since 27 November 2023?

  • 31796 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to the Petone to Grenada Link Road, in total and broken down…

  • 31798 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to the Petone to Grenada Link Road, in total and broken down by financial year, since 27 November 2023?

  • 31801 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to the SH2 Hawke's Bay Expressway, in total and broken down by…

  • 31803 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to the SH2 Hawke's Bay Expressway, in total and broken down by financial year, since 27 November 2023?

  • 31806 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to SH29 Tauriko (wider scope), in total and broken down by…

  • 31808 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to SH29 Tauriko (wider scope), in total and broken down by financial year, since 27 November 2023?

  • 31811 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to SH29 Tauriko West - Omanawa Bridge, in total and broken…

  • 31812 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to SH29 Tauriko West - Omanawa Bridge, in total and broken down by financial year, since 27 November 2023?

  • 31816 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to Takitimu North Link Stage 2, in total and broken down by…

  • 31817 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to Takitimu North Link Stage 2, in total and broken down by financial year, since 27 November 2023?

  • 31821 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to Takitimu North Link Stage 1, in total and broken down by…

  • 31823 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to Takitimu North Link Stage 1, in total and broken down by financial year, since 27 November 2023?

  • 31826 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to SH1 Cambridge to Piarere, in total and broken down by…

  • 31827 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to SH1 Cambridge to Piarere, in total and broken down by financial year, since 27 November 2023?

  • 31831 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to Hamilton Southern Links, in total and broken down by…

  • 31833 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to Hamilton Southern Links, in total and broken down by financial year, since 27 November 2023?

  • 31836 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to Mill Road, in total and broken down by financial year,…

  • 31838 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to Mill Road, in total and broken down by financial year, since 27 November 2023?

  • 31841 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to the East-West Link, in total and broken down by financial…

  • 31843 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to the East-West Link, in total and broken down by financial year, since 27 November 2023?

  • 31846 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to the SH16 North-West Alternative State Highway, in total and…

  • 31848 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to the SH16 North-West Alternative State Highway, in total and broken down by financial year, since 27 November 2023?

  • 31851 (matches this search)

    How much, if any, has the NZ Transport Agency paid to external suppliers for communications, public relations, public consultation, or community engagement services in relation to the Northland Corridor, in total and broken down by…

  • 31852 (matches this search)

    How much, if any, has the NZ Transport Agency spent on public consultation and community engagement in relation to the Northland Corridor, in total and broken down by financial year, since 27 November 2023?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Public consultation is not recorded as a discrete cost category and occurs throughout the project development lifecycle. I am advised that providing this level of detail would require a significant manual exercise, including reviewing…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to the SH6 Hope Bypass over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Consultation/engagement activities over the remainder of the 2024-27 National Land Transport Programme period are currently being considered to align with project phasing in the Major Transport Projects Pipeline.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on the SH6 Hope Bypass, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $1.5 million Property $0.059 million 2025/26 (as at 31 May 2026) Investment Case $0.686 million Pre Implementation $3.6 million Property $0.243 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass over the remainder of the 2024-27 National Land Transport…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Consultation/engagement activities over the remainder of the 2024-27 National Land Transport Programme period are currently being considered to align with project phasing in the Major Transport Projects Pipeline.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on the SH1 Belfast to Pegasus Motorway and Woodend Bypass, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment case $1.2 million Pre Implementation $8.6 million Property $7.4 million 2025/26 (as at 31 May 2026) Pre Implementation $19 million Implementation “Early Works” $5.7 million Property $26.6 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to SH1 Wellington Improvements over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Consultation/engagement activities over the remainder of the 2024-27 National Land Transport Programme period are currently being considered to align with project phasing in the Major Transport Projects Pipeline.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on SH1 Wellington Improvements, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $5.4 million Property $0.017 million 2025/26 (as at 31 May 2026) Investment Case $1.3 million Pre Implementation $23.6 million Property $8.2 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to Otaki to north of Levin over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency expects public consultation and community engagement for the Ōtaki to north of Levin project to be delivered primarily through project information centres and targeted landowner engagement, with costs generally…