- Questions published
- Reply lodged
Asked by
Tangi Utikere
Member for Palmerston North · Labour Party
Questions
-
32220
How much, if any, does the NZ Transport Agency expect to spend on the Cross Valley Link over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
-
32221
What further expenditure, if any, would be required to keep the Cross Valley Link "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32222
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Cross Valley Link, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32223
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Cross Valley Link since 27 November 2023?
Original response/referral lodged:
-
32224
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Cross Valley Link, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32225
How many properties, if any, has the NZ Transport Agency purchased in relation to the Cross Valley Link since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
Show the remaining 647 questions
-
32226
How much, if any, has the NZ Transport Agency spent on the Cross Valley Link per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32227
Has construction funding been committed to the Cross Valley Link since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32228
What is the current status of the Cross Valley Link in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32229
What was the cost, if any, of any options or route alternatives investigated for the Cross Valley Link since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32230
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Cross Valley Link that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32231
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Cross Valley Link as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32232
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Cross Valley Link since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32233
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Cross Valley Link, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32234
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Cross Valley Link remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32235
How much, if any, has the NZ Transport Agency spent on the Cross Valley Link since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32236
How much, if any, does the NZ Transport Agency expect to spend on Airport to Botany Busway Stage 3 and 4 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32237
What further expenditure, if any, would be required to keep Airport to Botany Busway Stage 3 and 4 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32238
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Airport to Botany Busway Stage 3 and 4 since 27 November 2023?
Original response/referral lodged:
-
32239
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Airport to Botany Busway Stage 3 and 4, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32240
How many properties, if any, has the NZ Transport Agency purchased in relation to Airport to Botany Busway Stage 3 and 4 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32241
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Airport to Botany Busway Stage 3 and 4, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32242
Has construction funding been committed to Airport to Botany Busway Stage 3 and 4 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32243
How much, if any, has the NZ Transport Agency spent on Airport to Botany Busway Stage 3 and 4 per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32244
What is the current status of Airport to Botany Busway Stage 3 and 4 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32245
What was the cost, if any, of any options or route alternatives investigated for Airport to Botany Busway Stage 3 and 4 since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32246
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Airport to Botany Busway Stage 3 and 4 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32247
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Airport to Botany Busway Stage 3 and 4 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32248
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Airport to Botany Busway Stage 3 and 4 since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32249
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Airport to Botany Busway Stage 3 and 4, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32250
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Airport to Botany Busway Stage 3 and 4 remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32251
How much, if any, has the NZ Transport Agency spent on Airport to Botany Busway Stage 3 and 4 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32252
What further expenditure, if any, would be required to keep the Auckland Level Crossings Removal programme (including the Western Line) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32253
How much, if any, does the NZ Transport Agency expect to spend on the Auckland Level Crossings Removal programme (including the Western Line) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32254
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Auckland Level Crossings Removal programme (including the Western Line), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32255
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023?
Original response/referral lodged:
-
32256
How many properties, if any, has the NZ Transport Agency purchased in relation to the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32257
How much, if any, has the NZ Transport Agency spent on the Auckland Level Crossings Removal programme (including the Western Line) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32258
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Auckland Level Crossings Removal programme (including the Western Line), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32259
Has construction funding been committed to the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32260
What is the current status of the Auckland Level Crossings Removal programme (including the Western Line) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32261
What was the cost, if any, of any options or route alternatives investigated for the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32262
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Auckland Level Crossings Removal programme (including the Western Line) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32263
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32264
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Auckland Level Crossings Removal programme (including the Western Line), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32265
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Auckland Level Crossings Removal programme (including the Western Line) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32266
How much, if any, has the NZ Transport Agency spent on the Auckland Level Crossings Removal programme (including the Western Line) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32267
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Auckland Level Crossings Removal programme (including the Western Line) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32268
What further expenditure, if any, would be required to keep SH6 Hope Bypass Stage 2 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32269
How much, if any, does the NZ Transport Agency expect to spend on SH6 Hope Bypass Stage 2 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32270
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH6 Hope Bypass Stage 2, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32271
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH6 Hope Bypass Stage 2 since 27 November 2023?
Original response/referral lodged:
-
32272
How many properties, if any, has the NZ Transport Agency purchased in relation to SH6 Hope Bypass Stage 2 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32273
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH6 Hope Bypass Stage 2, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32274
How much, if any, has the NZ Transport Agency spent on SH6 Hope Bypass Stage 2 per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32275
Has construction funding been committed to SH6 Hope Bypass Stage 2 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32276
What is the current status of SH6 Hope Bypass Stage 2 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32277
What was the cost, if any, of any options or route alternatives investigated for SH6 Hope Bypass Stage 2 since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32278
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH6 Hope Bypass Stage 2 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32279
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH6 Hope Bypass Stage 2 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32280
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH6 Hope Bypass Stage 2 since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32281
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH6 Hope Bypass Stage 2, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32282
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH6 Hope Bypass Stage 2 remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32283
How much, if any, has the NZ Transport Agency spent on SH6 Hope Bypass Stage 2 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32284
What further expenditure, if any, would be required to keep the Petone to Grenada Link Road "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32285
How much, if any, does the NZ Transport Agency expect to spend on the Petone to Grenada Link Road over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32286
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Petone to Grenada Link Road, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32287
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Petone to Grenada Link Road since 27 November 2023?
Original response/referral lodged:
-
32288
How many properties, if any, has the NZ Transport Agency purchased in relation to the Petone to Grenada Link Road since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32289
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Petone to Grenada Link Road, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32290
How much, if any, has the NZ Transport Agency spent on the Petone to Grenada Link Road per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32291
Has construction funding been committed to the Petone to Grenada Link Road since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32292
What is the current status of the Petone to Grenada Link Road in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32293
What was the cost, if any, of any options or route alternatives investigated for the Petone to Grenada Link Road since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32294
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Petone to Grenada Link Road as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32295
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Petone to Grenada Link Road that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32296
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Petone to Grenada Link Road since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32297
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Petone to Grenada Link Road, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32298
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Petone to Grenada Link Road remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32299
How much, if any, has the NZ Transport Agency spent on the Petone to Grenada Link Road since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32300
What further expenditure, if any, would be required to keep Mill Road – Alfriston to Drury "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32301
How much, if any, does the NZ Transport Agency expect to spend on Mill Road – Alfriston to Drury over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32302
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Mill Road – Alfriston to Drury, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32303
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Mill Road – Alfriston to Drury since 27 November 2023?
Original response/referral lodged:
-
32304
How many properties, if any, has the NZ Transport Agency purchased in relation to Mill Road – Alfriston to Drury since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32305
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Mill Road – Alfriston to Drury, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32306
How much, if any, has the NZ Transport Agency spent on Mill Road – Alfriston to Drury per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32307
What is the current status of Mill Road – Alfriston to Drury in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32308
Has construction funding been committed to Mill Road – Alfriston to Drury since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32309
What was the cost, if any, of any options or route alternatives investigated for Mill Road – Alfriston to Drury since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32310
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Mill Road – Alfriston to Drury as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32311
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Mill Road – Alfriston to Drury that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32312
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Mill Road – Alfriston to Drury, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32313
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Mill Road – Alfriston to Drury since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32314
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Mill Road – Alfriston to Drury remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32315
How much, if any, has the NZ Transport Agency spent on Mill Road – Alfriston to Drury since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32316
What further expenditure, if any, would be required to keep the East-West Link "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32317
How much, if any, does the NZ Transport Agency expect to spend on the East-West Link over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32318
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the East-West Link, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32319
How many properties, if any, has the NZ Transport Agency purchased in relation to the East-West Link since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32320
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the East-West Link since 27 November 2023?
Original response/referral lodged:
-
32321
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the East-West Link, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32322
Has construction funding been committed to the East-West Link since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32323
How much, if any, has the NZ Transport Agency spent on the East-West Link per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32324
What is the current status of the East-West Link in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32325
What was the cost, if any, of any options or route alternatives investigated for the East-West Link since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32326
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the East-West Link as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32327
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the East-West Link that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32328
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the East-West Link since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32329
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the East-West Link, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32330
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the East-West Link remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32331
How much, if any, has the NZ Transport Agency spent on the East-West Link since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32332
What further expenditure, if any, would be required to keep the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32333
How much, if any, does the NZ Transport Agency expect to spend on the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32334
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32335
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023?
Original response/referral lodged:
-
32336
How many properties, if any, has the NZ Transport Agency purchased in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32337
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32338
How much, if any, has the NZ Transport Agency spent on the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32339
Has construction funding been committed to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32340
What is the current status of the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32341
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32342
What was the cost, if any, of any options or route alternatives investigated for the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32343
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32344
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32345
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32346
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32347
How much, if any, has the NZ Transport Agency spent on the Northland Corridor (Te Hana to Whangārei, excluding the Alternative to Brynderwyn Hills) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32348
What further expenditure, if any, would be required to keep the Northwest Busway – Te Ara Hauāuru Stage 3 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32349
How much, if any, does the NZ Transport Agency expect to spend on the Northwest Busway – Te Ara Hauāuru Stage 3 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32350
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northwest Busway – Te Ara Hauāuru Stage 3, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32351
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023?
Original response/referral lodged:
-
32352
How many properties, if any, has the NZ Transport Agency purchased in relation to the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32353
How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 3 per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32354
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northwest Busway – Te Ara Hauāuru Stage 3, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32355
Has construction funding been committed to the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32356
What is the current status of the Northwest Busway – Te Ara Hauāuru Stage 3 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32357
What was the cost, if any, of any options or route alternatives investigated for the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32358
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northwest Busway – Te Ara Hauāuru Stage 3 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32359
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32360
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northwest Busway – Te Ara Hauāuru Stage 3 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32361
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northwest Busway – Te Ara Hauāuru Stage 3, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32362
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northwest Busway – Te Ara Hauāuru Stage 3 remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32363
How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 3 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32364
What further expenditure, if any, would be required to keep the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32365
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32366
How much, if any, does the NZ Transport Agency expect to spend on the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32367
How many properties, if any, has the NZ Transport Agency purchased in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32368
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023?
Original response/referral lodged:
-
32369
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32370
How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32371
Has construction funding been committed to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32372
What is the current status of the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32373
What was the cost, if any, of any options or route alternatives investigated for the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32374
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32375
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32376
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32377
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32378
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32379
How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 1B and 2 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32380
What further expenditure, if any, would be required to keep the SH16 North-West Alternative State Highway "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32381
How much, if any, does the NZ Transport Agency expect to spend on the SH16 North-West Alternative State Highway over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32382
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the SH16 North-West Alternative State Highway, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32383
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the SH16 North-West Alternative State Highway since 27 November 2023?
Original response/referral lodged:
-
32384
How many properties, if any, has the NZ Transport Agency purchased in relation to the SH16 North-West Alternative State Highway since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32385
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the SH16 North-West Alternative State Highway, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32386
How much, if any, has the NZ Transport Agency spent on the SH16 North-West Alternative State Highway per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32387
Has construction funding been committed to the SH16 North-West Alternative State Highway since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32388
What is the current status of the SH16 North-West Alternative State Highway in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32389
What was the cost, if any, of any options or route alternatives investigated for the SH16 North-West Alternative State Highway since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32390
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the SH16 North-West Alternative State Highway as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32391
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the SH16 North-West Alternative State Highway that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32392
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the SH16 North-West Alternative State Highway since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32393
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the SH16 North-West Alternative State Highway, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32394
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the SH16 North-West Alternative State Highway remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32395
How much, if any, has the NZ Transport Agency spent on the SH16 North-West Alternative State Highway since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32396
What further expenditure, if any, would be required to keep Takitimu North Link Stage 2B "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32397
How much, if any, does the NZ Transport Agency expect to spend on Takitimu North Link Stage 2B over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32398
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Takitimu North Link Stage 2B, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32399
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Takitimu North Link Stage 2B since 27 November 2023?
Original response/referral lodged:
-
32400
How many properties, if any, has the NZ Transport Agency purchased in relation to Takitimu North Link Stage 2B since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32401
How much, if any, has the NZ Transport Agency spent on Takitimu North Link Stage 2B per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32402
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Takitimu North Link Stage 2B, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32403
What is the current status of Takitimu North Link Stage 2B in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32404
Has construction funding been committed to Takitimu North Link Stage 2B since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32405
What was the cost, if any, of any options or route alternatives investigated for Takitimu North Link Stage 2B since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32406
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Takitimu North Link Stage 2B as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32407
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Takitimu North Link Stage 2B since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32408
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Takitimu North Link Stage 2B that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32409
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Takitimu North Link Stage 2B, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32410
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Takitimu North Link Stage 2B remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32411
What further expenditure, if any, would be required to keep Hamilton Southern Links "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32412
How much, if any, has the NZ Transport Agency spent on Takitimu North Link Stage 2B since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32413
How much, if any, does the NZ Transport Agency expect to spend on Hamilton Southern Links over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32414
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Hamilton Southern Links since 27 November 2023?
Original response/referral lodged:
-
32415
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Hamilton Southern Links, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32416
How many properties, if any, has the NZ Transport Agency purchased in relation to Hamilton Southern Links since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32417
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Hamilton Southern Links, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32418
How much, if any, has the NZ Transport Agency spent on Hamilton Southern Links per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32419
Has construction funding been committed to Hamilton Southern Links since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32420
What was the cost, if any, of any options or route alternatives investigated for Hamilton Southern Links since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32421
What is the current status of Hamilton Southern Links in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32422
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Hamilton Southern Links that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32423
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Hamilton Southern Links as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32424
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Hamilton Southern Links since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32425
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Hamilton Southern Links, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32426
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Hamilton Southern Links remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32427
How much, if any, has the NZ Transport Agency spent on Hamilton Southern Links since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32428
What further expenditure, if any, would be required to keep SH29 Tauriko (wider scope) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32429
How much, if any, does the NZ Transport Agency expect to spend on SH29 Tauriko (wider scope) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32430
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH29 Tauriko (wider scope), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32431
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH29 Tauriko (wider scope) since 27 November 2023?
Original response/referral lodged:
-
32432
How many properties, if any, has the NZ Transport Agency purchased in relation to SH29 Tauriko (wider scope) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32433
Has construction funding been committed to SH29 Tauriko (wider scope) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32434
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH29 Tauriko (wider scope), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32435
How much, if any, has the NZ Transport Agency spent on SH29 Tauriko (wider scope) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32436
What is the current status of SH29 Tauriko (wider scope) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32437
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH29 Tauriko (wider scope) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32438
What was the cost, if any, of any options or route alternatives investigated for SH29 Tauriko (wider scope) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32439
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH29 Tauriko (wider scope) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32440
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH29 Tauriko (wider scope), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32441
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH29 Tauriko (wider scope) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32442
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH29 Tauriko (wider scope) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32443
How much, if any, has the NZ Transport Agency spent on SH29 Tauriko (wider scope) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32444
What further expenditure, if any, would be required to keep the Northland Corridor Alternative to Brynderwyn Hills "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32445
How much, if any, does the NZ Transport Agency expect to spend on the Northland Corridor Alternative to Brynderwyn Hills over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32446
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northland Corridor Alternative to Brynderwyn Hills, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32447
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023?
Original response/referral lodged:
-
32448
How many properties, if any, has the NZ Transport Agency purchased in relation to the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32449
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northland Corridor Alternative to Brynderwyn Hills, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32450
How much, if any, has the NZ Transport Agency spent on the Northland Corridor Alternative to Brynderwyn Hills per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32451
Has construction funding been committed to the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32452
What is the current status of the Northland Corridor Alternative to Brynderwyn Hills in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32453
What was the cost, if any, of any options or route alternatives investigated for the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32454
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northland Corridor Alternative to Brynderwyn Hills as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32455
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northland Corridor Alternative to Brynderwyn Hills that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32456
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32457
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northland Corridor Alternative to Brynderwyn Hills remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32458
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northland Corridor Alternative to Brynderwyn Hills, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32459
How much, if any, has the NZ Transport Agency spent on the Northland Corridor Alternative to Brynderwyn Hills since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32460
What further expenditure, if any, would be required to keep SH1 Wellington Improvements "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32461
How much, if any, does the NZ Transport Agency expect to spend on SH1 Wellington Improvements over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32462
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Wellington Improvements, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32463
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Wellington Improvements since 27 November 2023?
Original response/referral lodged:
-
32464
How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Wellington Improvements since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32465
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Wellington Improvements, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32466
Has construction funding been committed to SH1 Wellington Improvements since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32467
How much, if any, has the NZ Transport Agency spent on SH1 Wellington Improvements per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32468
What is the current status of SH1 Wellington Improvements in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32469
What was the cost, if any, of any options or route alternatives investigated for SH1 Wellington Improvements since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32470
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Wellington Improvements as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32471
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Wellington Improvements that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32472
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Wellington Improvements since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32473
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Wellington Improvements, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32474
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Wellington Improvements remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32475
How much, if any, has the NZ Transport Agency spent on SH1 Wellington Improvements since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32476
What further expenditure, if any, would be required to keep SH6 Hope Bypass Stage 1 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32477
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH6 Hope Bypass Stage 1, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32478
How much, if any, does the NZ Transport Agency expect to spend on SH6 Hope Bypass Stage 1 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32479
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH6 Hope Bypass Stage 1 since 27 November 2023?
Original response/referral lodged:
-
32480
How many properties, if any, has the NZ Transport Agency purchased in relation to SH6 Hope Bypass Stage 1 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32481
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH6 Hope Bypass Stage 1, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32482
How much, if any, has the NZ Transport Agency spent on SH6 Hope Bypass Stage 1 per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32483
Has construction funding been committed to SH6 Hope Bypass Stage 1 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32484
What is the current status of SH6 Hope Bypass Stage 1 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32485
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH6 Hope Bypass Stage 1 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32486
What was the cost, if any, of any options or route alternatives investigated for SH6 Hope Bypass Stage 1 since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32487
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH6 Hope Bypass Stage 1 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32488
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH6 Hope Bypass Stage 1 since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32489
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH6 Hope Bypass Stage 1, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32490
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH6 Hope Bypass Stage 1 remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32491
How much, if any, has the NZ Transport Agency spent on SH6 Hope Bypass Stage 1 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32492
What further expenditure, if any, would be required to keep Takitimu North Link Stage 2A "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32493
How much, if any, does the NZ Transport Agency expect to spend on Takitimu North Link Stage 2A over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32494
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Takitimu North Link Stage 2A, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32495
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Takitimu North Link Stage 2A since 27 November 2023?
Original response/referral lodged:
-
32496
How many properties, if any, has the NZ Transport Agency purchased in relation to Takitimu North Link Stage 2A since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32497
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Takitimu North Link Stage 2A, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32498
How much, if any, has the NZ Transport Agency spent on Takitimu North Link Stage 2A per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32499
Has construction funding been committed to Takitimu North Link Stage 2A since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32500
What is the current status of Takitimu North Link Stage 2A in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32501
What was the cost, if any, of any options or route alternatives investigated for Takitimu North Link Stage 2A since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32502
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Takitimu North Link Stage 2A as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32503
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Takitimu North Link Stage 2A that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32504
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Takitimu North Link Stage 2A since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32505
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Takitimu North Link Stage 2A, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32506
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Takitimu North Link Stage 2A remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32507
How much, if any, has the NZ Transport Agency spent on Takitimu North Link Stage 2A since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32508
What further expenditure, if any, would be required to keep Mill Road Stage 1 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32509
How much, if any, does the NZ Transport Agency expect to spend on Mill Road Stage 1 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32510
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Mill Road Stage 1, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32511
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Mill Road Stage 1 since 27 November 2023?
Original response/referral lodged:
-
32512
How many properties, if any, has the NZ Transport Agency purchased in relation to Mill Road Stage 1 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32513
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Mill Road Stage 1, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32514
How much, if any, has the NZ Transport Agency spent on Mill Road Stage 1 per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32515
Has construction funding been committed to Mill Road Stage 1 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32516
What is the current status of Mill Road Stage 1 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32517
What was the cost, if any, of any options or route alternatives investigated for Mill Road Stage 1 since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32518
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Mill Road Stage 1 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32519
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Mill Road Stage 1 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32520
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Mill Road Stage 1 since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32521
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Mill Road Stage 1, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32522
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Mill Road Stage 1 remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32523
How much, if any, has the NZ Transport Agency spent on Mill Road Stage 1 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32524
What further expenditure, if any, would be required to keep the SH1 Belfast to Pegasus Motorway and Woodend Bypass "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32525
How much, if any, does the NZ Transport Agency expect to spend on the SH1 Belfast to Pegasus Motorway and Woodend Bypass over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32526
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32527
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023?
Original response/referral lodged:
-
32528
How many properties, if any, has the NZ Transport Agency purchased in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32529
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32530
How much, if any, has the NZ Transport Agency spent on the SH1 Belfast to Pegasus Motorway and Woodend Bypass per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32531
What is the current status of the SH1 Belfast to Pegasus Motorway and Woodend Bypass in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32532
Has construction funding been committed to the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32533
What was the cost, if any, of any options or route alternatives investigated for the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32534
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the SH1 Belfast to Pegasus Motorway and Woodend Bypass as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32535
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the SH1 Belfast to Pegasus Motorway and Woodend Bypass that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32536
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32537
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the SH1 Belfast to Pegasus Motorway and Woodend Bypass, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32538
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the SH1 Belfast to Pegasus Motorway and Woodend Bypass remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32539
How much, if any, has the NZ Transport Agency spent on the SH1 Belfast to Pegasus Motorway and Woodend Bypass since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32540
What further expenditure, if any, would be required to keep Airport to Botany Busway Stage 2 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32541
How much, if any, does the NZ Transport Agency expect to spend on Airport to Botany Busway Stage 2 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32542
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Airport to Botany Busway Stage 2, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32543
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Airport to Botany Busway Stage 2 since 27 November 2023?
Original response/referral lodged:
-
32544
How many properties, if any, has the NZ Transport Agency purchased in relation to Airport to Botany Busway Stage 2 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32545
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Airport to Botany Busway Stage 2, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32546
How much, if any, has the NZ Transport Agency spent on Airport to Botany Busway Stage 2 per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32547
Has construction funding been committed to Airport to Botany Busway Stage 2 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32548
What is the current status of Airport to Botany Busway Stage 2 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32549
What was the cost, if any, of any options or route alternatives investigated for Airport to Botany Busway Stage 2 since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32550
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Airport to Botany Busway Stage 2 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32551
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Airport to Botany Busway Stage 2 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32552
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Airport to Botany Busway Stage 2 since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32553
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Airport to Botany Busway Stage 2, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32554
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Airport to Botany Busway Stage 2 remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32555
How much, if any, has the NZ Transport Agency spent on Airport to Botany Busway Stage 2 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32556
What further expenditure, if any, would be required to keep the Auckland Level Crossings Removal project at Takaanini "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32557
How much, if any, does the NZ Transport Agency expect to spend on the Auckland Level Crossings Removal project at Takaanini over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32558
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Auckland Level Crossings Removal project at Takaanini, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32559
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Auckland Level Crossings Removal project at Takaanini since 27 November 2023?
Original response/referral lodged:
-
32560
How many properties, if any, has the NZ Transport Agency purchased in relation to the Auckland Level Crossings Removal project at Takaanini since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32561
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Auckland Level Crossings Removal project at Takaanini, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32562
How much, if any, has the NZ Transport Agency spent on the Auckland Level Crossings Removal project at Takaanini per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32563
Has construction funding been committed to the Auckland Level Crossings Removal project at Takaanini since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32564
What is the current status of the Auckland Level Crossings Removal project at Takaanini in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32565
What was the cost, if any, of any options or route alternatives investigated for the Auckland Level Crossings Removal project at Takaanini since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32566
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Auckland Level Crossings Removal project at Takaanini as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32567
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Auckland Level Crossings Removal project at Takaanini that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32568
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Auckland Level Crossings Removal project at Takaanini since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32569
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Auckland Level Crossings Removal project at Takaanini remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32570
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Auckland Level Crossings Removal project at Takaanini, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32571
How much, if any, has the NZ Transport Agency spent on the Auckland Level Crossings Removal project at Takaanini since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32572
What further expenditure, if any, would be required to keep Eastern Busway Stage 4 (excluding Botany Station) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32573
How much, if any, does the NZ Transport Agency expect to spend on Eastern Busway Stage 4 (excluding Botany Station) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32574
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Eastern Busway Stage 4 (excluding Botany Station), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32575
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023?
Original response/referral lodged:
-
32576
How many properties, if any, has the NZ Transport Agency purchased in relation to Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32577
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Eastern Busway Stage 4 (excluding Botany Station), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32578
How much, if any, has the NZ Transport Agency spent on Eastern Busway Stage 4 (excluding Botany Station) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32579
Has construction funding been committed to Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32580
What is the current status of Eastern Busway Stage 4 (excluding Botany Station) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32581
What was the cost, if any, of any options or route alternatives investigated for Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32582
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Eastern Busway Stage 4 (excluding Botany Station) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32583
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Eastern Busway Stage 4 (excluding Botany Station) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32584
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Eastern Busway Stage 4 (excluding Botany Station), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32585
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32586
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Eastern Busway Stage 4 (excluding Botany Station) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32587
How much, if any, has the NZ Transport Agency spent on Eastern Busway Stage 4 (excluding Botany Station) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32588
How much, if any, does the NZ Transport Agency expect to spend on the Lower North Island Rail Integrated Mobility (LNIRIM) project over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32589
What further expenditure, if any, would be required to keep the Lower North Island Rail Integrated Mobility (LNIRIM) project "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32590
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32591
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023?
Original response/referral lodged:
-
32592
How many properties, if any, has the NZ Transport Agency purchased in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32593
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32594
How much, if any, has the NZ Transport Agency spent on the Lower North Island Rail Integrated Mobility (LNIRIM) project per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32595
Has construction funding been committed to the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32596
What is the current status of the Lower North Island Rail Integrated Mobility (LNIRIM) project in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32597
What was the cost, if any, of any options or route alternatives investigated for the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32598
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Lower North Island Rail Integrated Mobility (LNIRIM) project as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32599
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Lower North Island Rail Integrated Mobility (LNIRIM) project that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32600
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32601
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32602
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Lower North Island Rail Integrated Mobility (LNIRIM) project remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32603
How much, if any, has the NZ Transport Agency spent on the Lower North Island Rail Integrated Mobility (LNIRIM) project since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32604
What further expenditure, if any, would be required to keep the Waikare Gorge realignment "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32605
How much, if any, does the NZ Transport Agency expect to spend on the Waikare Gorge realignment over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32606
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Waikare Gorge realignment, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32607
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Waikare Gorge realignment since 27 November 2023?
Original response/referral lodged:
-
32608
How many properties, if any, has the NZ Transport Agency purchased in relation to the Waikare Gorge realignment since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32609
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Waikare Gorge realignment, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32610
How much, if any, has the NZ Transport Agency spent on the Waikare Gorge realignment per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32611
Has construction funding been committed to the Waikare Gorge realignment since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32612
What is the current status of the Waikare Gorge realignment in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32613
What was the cost, if any, of any options or route alternatives investigated for the Waikare Gorge realignment since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32614
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Waikare Gorge realignment as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32615
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Waikare Gorge realignment that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32616
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Waikare Gorge realignment since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32617
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Waikare Gorge realignment, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32618
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Waikare Gorge realignment remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32619
How much, if any, has the NZ Transport Agency spent on the Waikare Gorge realignment since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32620
What further expenditure, if any, would be required to keep the Northwest Busway – Te Ara Hauāuru Stage 1A "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32621
How much, if any, does the NZ Transport Agency expect to spend on the Northwest Busway – Te Ara Hauāuru Stage 1A over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32622
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32623
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023?
Original response/referral lodged:
-
32624
How many properties, if any, has the NZ Transport Agency purchased in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32625
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32626
Has construction funding been committed to the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32627
How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 1A per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32628
What is the current status of the Northwest Busway – Te Ara Hauāuru Stage 1A in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32629
What was the cost, if any, of any options or route alternatives investigated for the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32630
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32631
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32632
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northwest Busway – Te Ara Hauāuru Stage 1A as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32633
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northwest Busway – Te Ara Hauāuru Stage 1A that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32634
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Northwest Busway – Te Ara Hauāuru Stage 1A remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32635
How much, if any, has the NZ Transport Agency spent on the Northwest Busway – Te Ara Hauāuru Stage 1A since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32636
What further expenditure, if any, would be required to keep the Second Ashburton Bridge project "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32637
How much, if any, does the NZ Transport Agency expect to spend on the Second Ashburton Bridge project over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32638
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Second Ashburton Bridge project since 27 November 2023?
Original response/referral lodged:
-
32639
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Second Ashburton Bridge project, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32640
How many properties, if any, has the NZ Transport Agency purchased in relation to the Second Ashburton Bridge project since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32641
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Second Ashburton Bridge project, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32642
How much, if any, has the NZ Transport Agency spent on the Second Ashburton Bridge project per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32643
Has construction funding been committed to the Second Ashburton Bridge project since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32644
What is the current status of the Second Ashburton Bridge project in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32645
What was the cost, if any, of any options or route alternatives investigated for the Second Ashburton Bridge project since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32646
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Second Ashburton Bridge project as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32647
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Second Ashburton Bridge project that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32648
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Second Ashburton Bridge project since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32649
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Second Ashburton Bridge project, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32650
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Second Ashburton Bridge project remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32651
How much, if any, has the NZ Transport Agency spent on the Second Ashburton Bridge project since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32652
What further expenditure, if any, would be required to keep SH76 Brougham Street improvements Package 2 (corridor) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32653
How much, if any, does the NZ Transport Agency expect to spend on SH76 Brougham Street improvements Package 2 (corridor) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32654
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH76 Brougham Street improvements Package 2 (corridor), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32655
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023?
Original response/referral lodged:
-
32656
How many properties, if any, has the NZ Transport Agency purchased in relation to SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32657
Has construction funding been committed to SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32658
How much, if any, has the NZ Transport Agency spent on SH76 Brougham Street improvements Package 2 (corridor) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32659
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH76 Brougham Street improvements Package 2 (corridor), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32660
What is the current status of SH76 Brougham Street improvements Package 2 (corridor) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32661
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH76 Brougham Street improvements Package 2 (corridor) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32662
What was the cost, if any, of any options or route alternatives investigated for SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32663
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH76 Brougham Street improvements Package 2 (corridor) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32664
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32665
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH76 Brougham Street improvements Package 2 (corridor), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32666
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH76 Brougham Street improvements Package 2 (corridor) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32667
How much, if any, has the NZ Transport Agency spent on SH76 Brougham Street improvements Package 2 (corridor) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32668
What further expenditure, if any, would be required to keep SH76 Brougham Street improvements Package 1 (bridge) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32669
How much, if any, does the NZ Transport Agency expect to spend on SH76 Brougham Street improvements Package 1 (bridge) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32670
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023?
Original response/referral lodged:
-
32671
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH76 Brougham Street improvements Package 1 (bridge), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32672
How many properties, if any, has the NZ Transport Agency purchased in relation to SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32673
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH76 Brougham Street improvements Package 1 (bridge), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32674
How much, if any, has the NZ Transport Agency spent on SH76 Brougham Street improvements Package 1 (bridge) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32675
Has construction funding been committed to SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32676
What was the cost, if any, of any options or route alternatives investigated for SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32677
What is the current status of SH76 Brougham Street improvements Package 1 (bridge) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32678
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH76 Brougham Street improvements Package 1 (bridge) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32679
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH76 Brougham Street improvements Package 1 (bridge) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32680
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32681
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH76 Brougham Street improvements Package 1 (bridge) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32682
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH76 Brougham Street improvements Package 1 (bridge), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32683
How much, if any, has the NZ Transport Agency spent on SH76 Brougham Street improvements Package 1 (bridge) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32684
What further expenditure, if any, would be required to keep SH1 Rolleston Access improvements Package 2 (flyover) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32685
How much, if any, does the NZ Transport Agency expect to spend on SH1 Rolleston Access improvements Package 2 (flyover) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32686
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Rolleston Access improvements Package 2 (flyover), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32687
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023?
Original response/referral lodged:
-
32688
How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32689
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Rolleston Access improvements Package 2 (flyover), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32690
How much, if any, has the NZ Transport Agency spent on SH1 Rolleston Access improvements Package 2 (flyover) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32691
Has construction funding been committed to SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32692
What is the current status of SH1 Rolleston Access improvements Package 2 (flyover) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32693
What was the cost, if any, of any options or route alternatives investigated for SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32694
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Rolleston Access improvements Package 2 (flyover) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32695
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Rolleston Access improvements Package 2 (flyover) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32696
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32697
How much, if any, has the NZ Transport Agency spent on SH1 Rolleston Access improvements Package 2 (flyover) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32698
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Rolleston Access improvements Package 2 (flyover), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32699
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Rolleston Access improvements Package 2 (flyover) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32700
What further expenditure, if any, would be required to keep SH1 Rolleston Access improvements Package 1 (roundabout) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32701
How much, if any, does the NZ Transport Agency expect to spend on SH1 Rolleston Access improvements Package 1 (roundabout) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32702
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023?
Original response/referral lodged:
-
32703
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Rolleston Access improvements Package 1 (roundabout), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32704
How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32705
How much, if any, has the NZ Transport Agency spent on SH1 Rolleston Access improvements Package 1 (roundabout) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32706
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Rolleston Access improvements Package 1 (roundabout), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32707
Has construction funding been committed to SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32708
What is the current status of SH1 Rolleston Access improvements Package 1 (roundabout) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32709
What was the cost, if any, of any options or route alternatives investigated for SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32710
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Rolleston Access improvements Package 1 (roundabout) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32711
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Rolleston Access improvements Package 1 (roundabout) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32712
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32713
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Rolleston Access improvements Package 1 (roundabout), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32714
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Rolleston Access improvements Package 1 (roundabout) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32715
How much, if any, has the NZ Transport Agency spent on SH1 Rolleston Access improvements Package 1 (roundabout) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32716
What further expenditure, if any, would be required to keep the SH75 Halswell Road improvements "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32717
How much, if any, does the NZ Transport Agency expect to spend on the SH75 Halswell Road improvements over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32718
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the SH75 Halswell Road improvements, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32719
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the SH75 Halswell Road improvements since 27 November 2023?
Original response/referral lodged:
-
32720
How many properties, if any, has the NZ Transport Agency purchased in relation to the SH75 Halswell Road improvements since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32721
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the SH75 Halswell Road improvements, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32722
How much, if any, has the NZ Transport Agency spent on the SH75 Halswell Road improvements per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32723
What is the current status of the SH75 Halswell Road improvements in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32724
Has construction funding been committed to the SH75 Halswell Road improvements since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32725
What was the cost, if any, of any options or route alternatives investigated for the SH75 Halswell Road improvements since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32726
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the SH75 Halswell Road improvements as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32727
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the SH75 Halswell Road improvements that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32728
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the SH75 Halswell Road improvements since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32729
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the SH75 Halswell Road improvements, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32730
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the SH75 Halswell Road improvements remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32731
How much, if any, has the NZ Transport Agency spent on the SH75 Halswell Road improvements since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32732
What further expenditure, if any, would be required to keep the Queenstown Package "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32733
How much, if any, does the NZ Transport Agency expect to spend on the Queenstown Package over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32734
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Queenstown Package, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32735
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Queenstown Package since 27 November 2023?
Original response/referral lodged:
-
32736
How many properties, if any, has the NZ Transport Agency purchased in relation to the Queenstown Package since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32737
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Queenstown Package, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32738
How much, if any, has the NZ Transport Agency spent on the Queenstown Package per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32739
Has construction funding been committed to the Queenstown Package since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32740
What is the current status of the Queenstown Package in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32741
What was the cost, if any, of any options or route alternatives investigated for the Queenstown Package since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32742
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Queenstown Package as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32743
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Queenstown Package that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32744
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Queenstown Package since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32745
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Queenstown Package, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32746
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Queenstown Package remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32747
How much, if any, has the NZ Transport Agency spent on the Queenstown Package since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32748
What further expenditure, if any, would be required to keep the SH2 Melling Transport Improvements project "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32749
How much, if any, does the NZ Transport Agency expect to spend on the SH2 Melling Transport Improvements project over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32750
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the SH2 Melling Transport Improvements project, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32751
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the SH2 Melling Transport Improvements project since 27 November 2023?
Original response/referral lodged:
-
32752
How many properties, if any, has the NZ Transport Agency purchased in relation to the SH2 Melling Transport Improvements project since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32753
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the SH2 Melling Transport Improvements project, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32754
How much, if any, has the NZ Transport Agency spent on the SH2 Melling Transport Improvements project per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32755
Has construction funding been committed to the SH2 Melling Transport Improvements project since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32756
What is the current status of the SH2 Melling Transport Improvements project in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32757
What was the cost, if any, of any options or route alternatives investigated for the SH2 Melling Transport Improvements project since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32758
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the SH2 Melling Transport Improvements project as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32759
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the SH2 Melling Transport Improvements project that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32760
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the SH2 Melling Transport Improvements project since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32761
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the SH2 Melling Transport Improvements project, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32762
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the SH2 Melling Transport Improvements project remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32763
How much, if any, has the NZ Transport Agency spent on the SH2 Melling Transport Improvements project since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32764
What further expenditure, if any, would be required to keep SH58 Safety Improvements Stage 2 "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32765
How much, if any, does the NZ Transport Agency expect to spend on SH58 Safety Improvements Stage 2 over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32766
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH58 Safety Improvements Stage 2 since 27 November 2023?
Original response/referral lodged:
-
32767
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH58 Safety Improvements Stage 2, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32768
How many properties, if any, has the NZ Transport Agency purchased in relation to SH58 Safety Improvements Stage 2 since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32769
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH58 Safety Improvements Stage 2, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32770
How much, if any, has the NZ Transport Agency spent on SH58 Safety Improvements Stage 2 per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32771
Has construction funding been committed to SH58 Safety Improvements Stage 2 since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32772
What is the current status of SH58 Safety Improvements Stage 2 in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32773
What was the cost, if any, of any options or route alternatives investigated for SH58 Safety Improvements Stage 2 since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32774
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH58 Safety Improvements Stage 2 as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32775
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH58 Safety Improvements Stage 2 that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32776
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH58 Safety Improvements Stage 2 since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32777
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH58 Safety Improvements Stage 2, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32778
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH58 Safety Improvements Stage 2 remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32779
How much, if any, has the NZ Transport Agency spent on SH58 Safety Improvements Stage 2 since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32780
What further expenditure, if any, would be required to keep the Waihoehoe Road (Drury Upgrade) project "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32781
How much, if any, does the NZ Transport Agency expect to spend on the Waihoehoe Road (Drury Upgrade) project over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32782
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Waihoehoe Road (Drury Upgrade) project, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32783
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Waihoehoe Road (Drury Upgrade) project since 27 November 2023?
Original response/referral lodged:
-
32784
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Waihoehoe Road (Drury Upgrade) project, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32785
How many properties, if any, has the NZ Transport Agency purchased in relation to the Waihoehoe Road (Drury Upgrade) project since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32786
Has construction funding been committed to the Waihoehoe Road (Drury Upgrade) project since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32787
How much, if any, has the NZ Transport Agency spent on the Waihoehoe Road (Drury Upgrade) project per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32788
What is the current status of the Waihoehoe Road (Drury Upgrade) project in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32789
What was the cost, if any, of any options or route alternatives investigated for the Waihoehoe Road (Drury Upgrade) project since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32790
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Waihoehoe Road (Drury Upgrade) project as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32791
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Waihoehoe Road (Drury Upgrade) project that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32792
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Waihoehoe Road (Drury Upgrade) project since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32793
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to the Waihoehoe Road (Drury Upgrade) project, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32794
How much, if any, has the NZ Transport Agency spent on the Waihoehoe Road (Drury Upgrade) project since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32795
How much, if any, of the NZ Transport Agency's approved design and consenting funding for the Waihoehoe Road (Drury Upgrade) project remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32796
What further expenditure, if any, would be required to keep SH1 Papakura to Drury "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32797
How much, if any, does the NZ Transport Agency expect to spend on SH1 Papakura to Drury over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32798
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Papakura to Drury, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32799
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Papakura to Drury since 27 November 2023?
Original response/referral lodged:
-
32800
How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Papakura to Drury since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32801
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Papakura to Drury, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32802
How much, if any, has the NZ Transport Agency spent on SH1 Papakura to Drury per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32803
Has construction funding been committed to SH1 Papakura to Drury since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32804
What is the current status of SH1 Papakura to Drury in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32805
What was the cost, if any, of any options or route alternatives investigated for SH1 Papakura to Drury since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32806
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Papakura to Drury as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32807
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Papakura to Drury that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32808
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Papakura to Drury since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32809
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Papakura to Drury, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32810
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Papakura to Drury remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32811
How much, if any, has the NZ Transport Agency spent on SH1 Papakura to Drury since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32812
What further expenditure, if any, would be required to keep Penlink O Mahurangi "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32814
How much, if any, does the NZ Transport Agency expect to spend on Penlink O Mahurangi over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32816
How much, if any, has the NZ Transport Agency spent on legal costs in relation to Penlink O Mahurangi, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32817
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for Penlink O Mahurangi since 27 November 2023?
Original response/referral lodged:
-
32819
How many properties, if any, has the NZ Transport Agency purchased in relation to Penlink O Mahurangi since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32820
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to Penlink O Mahurangi, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32821
How much, if any, has the NZ Transport Agency spent on Penlink O Mahurangi per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32822
What is the current status of Penlink O Mahurangi in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32823
Has construction funding been committed to Penlink O Mahurangi since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32824
What was the cost, if any, of any options or route alternatives investigated for Penlink O Mahurangi since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32825
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on Penlink O Mahurangi as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32826
How many external contracts, if any, has the NZ Transport Agency entered into in relation to Penlink O Mahurangi since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32827
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for Penlink O Mahurangi that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32828
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to Penlink O Mahurangi, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32829
How much, if any, of the NZ Transport Agency's approved design and consenting funding for Penlink O Mahurangi remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32830
How much, if any, has the NZ Transport Agency spent on Penlink O Mahurangi since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32831
What further expenditure, if any, would be required to keep SH29 Tauriko (Ōmanawa Bridge) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32832
How much, if any, does the NZ Transport Agency expect to spend on SH29 Tauriko (Ōmanawa Bridge) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32833
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH29 Tauriko (Ōmanawa Bridge), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32834
How many properties, if any, has the NZ Transport Agency purchased in relation to SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32835
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023?
Original response/referral lodged:
-
32836
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH29 Tauriko (Ōmanawa Bridge), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32837
How much, if any, has the NZ Transport Agency spent on SH29 Tauriko (Ōmanawa Bridge) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32838
What is the current status of SH29 Tauriko (Ōmanawa Bridge) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32839
Has construction funding been committed to SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32840
What was the cost, if any, of any options or route alternatives investigated for SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32841
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH29 Tauriko (Ōmanawa Bridge) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32842
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH29 Tauriko (Ōmanawa Bridge) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32843
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32844
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH29 Tauriko (Ōmanawa Bridge), broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32846
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH29 Tauriko (Ōmanawa Bridge) remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32847
How much, if any, has the NZ Transport Agency spent on SH29 Tauriko (Ōmanawa Bridge) since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32849
What further expenditure, if any, would be required to keep SH1 Cambridge to Piarere "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32850
How much, if any, has the NZ Transport Agency spent on legal costs in relation to SH1 Cambridge to Piarere, including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32851
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for SH1 Cambridge to Piarere since 27 November 2023?
Original response/referral lodged:
-
32852
How much, if any, does the NZ Transport Agency expect to spend on SH1 Cambridge to Piarere over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32853
How many properties, if any, has the NZ Transport Agency purchased in relation to SH1 Cambridge to Piarere since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32854
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to SH1 Cambridge to Piarere, in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32855
How much, if any, has the NZ Transport Agency spent on SH1 Cambridge to Piarere per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32856
Has construction funding been committed to SH1 Cambridge to Piarere since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32857
What is the current status of SH1 Cambridge to Piarere in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32858
What was the cost, if any, of any options or route alternatives investigated for SH1 Cambridge to Piarere since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32859
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on SH1 Cambridge to Piarere as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32860
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for SH1 Cambridge to Piarere that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32861
How many external contracts, if any, has the NZ Transport Agency entered into in relation to SH1 Cambridge to Piarere since 27 November 2023, and what is their combined value?
Original response/referral lodged:
-
32862
How much, if any, of the NZ Transport Agency's approved design and consenting funding for SH1 Cambridge to Piarere remains unspent as at 30 June 2026?
Original response/referral lodged:
-
32863
How much, if any, has the NZ Transport Agency paid to external suppliers for consultancy, engineering, or advisory services in relation to SH1 Cambridge to Piarere, broken down by financial year and by supplier, since 27 November 2023?
Original response/referral lodged:
-
32864
How much, if any, has the NZ Transport Agency spent on SH1 Cambridge to Piarere since 27 November 2023, broken down by cost category (e.g. business case, consenting, route protection, property acquisition, design, consultation/engagement)?
Original response/referral lodged:
-
32865
What further expenditure, if any, would be required to keep the Northland Corridor (Warkworth to Te Hana) "shovel ready" if a construction funding decision is delayed beyond the current National Land Transport Programme period?
Original response/referral lodged:
-
32866
How much, if any, does the NZ Transport Agency expect to spend on the Northland Corridor (Warkworth to Te Hana) over the remainder of the 2024-27 National Land Transport Programme period, broken down by cost category?
Original response/referral lodged:
-
32867
How much, if any, has the NZ Transport Agency spent on legal costs in relation to the Northland Corridor (Warkworth to Te Hana), including any consenting appeals or litigation, since 27 November 2023?
Original response/referral lodged:
-
32868
What is the annual cost, if any, to the NZ Transport Agency of holding, maintaining, or leasing back property acquired for the Northland Corridor (Warkworth to Te Hana) since 27 November 2023?
Original response/referral lodged:
-
32869
How many properties, if any, has the NZ Transport Agency purchased in relation to the Northland Corridor (Warkworth to Te Hana) since 27 November 2023 that are not currently required for construction, and what is their combined purchase value?
Original response/referral lodged:
-
32870
How much, if any, has the NZ Transport Agency spent on property acquisition in relation to the Northland Corridor (Warkworth to Te Hana), in total and broken down by financial year, since 27 November 2023?
Original response/referral lodged:
-
32871
How much, if any, has the NZ Transport Agency spent on the Northland Corridor (Warkworth to Te Hana) per month, on average, since 27 November 2023?
Original response/referral lodged:
-
32872
Has construction funding been committed to the Northland Corridor (Warkworth to Te Hana) since 27 November 2023; if not, what is the expected timeframe for a construction funding decision?
Original response/referral lodged:
-
32873
What is the current status of the Northland Corridor (Warkworth to Te Hana) in the NZ Transport Agency's Major Transport Projects Pipeline, and how does this compare with its status as at 27 November 2023?
Original response/referral lodged:
-
32874
What was the cost, if any, of any options or route alternatives investigated for the Northland Corridor (Warkworth to Te Hana) since 27 November 2023 that were not progressed?
Original response/referral lodged:
-
32875
Has the NZ Transport Agency had to repeat or redo any consultation, business case, or design work on the Northland Corridor (Warkworth to Te Hana) as a result of a change in government direction since 27 November 2023; if so, what, if anything, did that repeated work cost?
Original response/referral lodged:
-
32876
How much, if any, has the NZ Transport Agency spent since 27 November 2023 on business case or design work for the Northland Corridor (Warkworth to Te Hana) that has since been superseded, discarded, or rendered obsolete by a change in scope or route?
Original response/referral lodged:
-
32877
How many external contracts, if any, has the NZ Transport Agency entered into in relation to the Northland Corridor (Warkworth to Te Hana) since 27 November 2023, and what is their combined value?
Original response/referral lodged:
Answered by
Hon Chris Bishop
Member for Hutt South · National Party · Minister of Transport
Answer
While I recognise there is significant public interest following my announcement of the Major Transport Projects Pipeline on 9 July 2026, responding to the information sought across a total of 653 questions (32220 (2026) to 32877 (2026)), received on 17 July 2026, would require substantial collation, review, and processing. This would divert officials from their core duties. In accordance with Speakers’ Rulings 210/6, I consider that the time and expense involved would not be in the public interest and would not represent an efficient or proportionate use of officials’ resources. Many of the matters raised relate to operational information held by NZ Transport Agency Waka Kotahi, which is best placed to respond to requests for detailed project information through the appropriate channels, for example under the Official Information Act 1982.