Asked by Tangi Utikere · Member for Palmerston North · Labour Party
Minister All Ministers
Portfolio All portfolios
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 351 to 400 of 2089 written question sets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 35756 (2026), will the Government review the Advance Purchase Policy for Property Acquisitions, last reviewed in October 2018, in light of the scale of unfunded designations identified in reply 35761 (2026); if not, why…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZTA is currently reviewing its Advance Purchase Policy for Property Acquisitions.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    For each of the 11 projects listed in reply 35761 (2026), what is the current expected timeframe, if any, for construction funding to be allocated?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am not able to confirm the timeframe for allocating construction funding to these 11 projects. Consistent with the Major Transport Projects Pipeline, the timeframe remains subject to funding availability.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 33478 (2026), for each confirmed NZTA designation not among those listed as having a lapse date within the next five years, what is the current lapse date of that designation?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to the attached document.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 35743 (2026), can the Minister confirm whether the statement that no agreements under section 17 of the Public Works Act 1981 have been deemed entered into as a result of a section 185 order in the last 10 years is…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA has confirmed that no agreements have been entered into in the last 10 years as a result of an order made under s185 of the RMA. One agreement is currently with the landowner for signing and once this is done the agreement will go to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What estimate, if any, has NZTA or Treasury made of the rate of increase in the market value of properties subject to long-term unfunded designations, and how is that factored into any assessment of future Crown acquisition costs?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency's property acquisition estimates are set out in its Cost Estimation Manual. This is available on the NZTA website at https://www.nzta.govt.nz/assets/resources/cost-estimation-manual/docs/cost-estimation-manual-sm014.pdf

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has the Government sought advice from the Office of the Auditor-General, or any other independent body, on whether contingent liabilities arising from long-term unfunded designations are adequately identified, quantified, and disclosed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I have sought no such advice.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many of the 2,395 properties identified in reply 35761 (2026) have been the subject of an application under section 185 of the Resource Management Act 1991, and what was the outcome in each case?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that there have been five applications lodged under s185 RMA that relate to those properties: • One has had an order made by the Environment Court under s185 RMA. • One was withdrawn by consent following an agreement being…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    For each of the 11 projects listed in reply 35761 (2026), what is the average length of time elapsed since the relevant notice of requirement or designation was lodged?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to the attached document.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 36197 (2026), has any whole-of-life cost comparison since been undertaken for any of the 11 projects listed in reply 35761 (2026), between maintaining the designation, acquiring the corridor now, or non-statutory route…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that a whole-of-life cost comparison has not been undertaken to compare the options of maintaining the designation, acquiring the corridor now, or using non-statutory route protection.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does NZTA maintain a central risk register or contingent liability estimate for properties subject to designations for which no construction funding is allocated; if so, what is the current total value recorded; if not, why not?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No. Risks and potential property-related obligations are assessed and managed within individual project governance and business case processes.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 35750 (2026), has the Minister received any advice since the date of that reply on the projected cost of section 185 acquisitions arising from designations without construction funding?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I have received no such advice.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 35745 (2026), will the Government now separately disclose section 185-related contingent liabilities in the Financial Statements of the Government of New Zealand, given the scale of properties identified in reply 35761…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Treasury is responsible for determining the content of the Financial Statements of the Government, including whether contingent liabilities are separately disclosed. In general, a separate disclosure is required only where a contingent…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has Treasury undertaken or commissioned any analysis of the aggregate contingent liability arising from designations without construction funding across the 11 projects listed in reply 35761 (2026); if so, what is the title and date of…

Answered by

Hon Nicola Willis

List MP · National Party · Minister of Finance

Answer

No. The Treasury has not undertaken or commissioned this analysis. Responsibility for assessing individual project costs and funding requirements sits with the relevant designating authority or responsible agency, with proposals considered…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 36198 (2026), as the $364.4m estimate for NoR 1 North properties was prepared in 2017, has that estimate been updated since, and if not, why not?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that the estimate has not been updated since. The estimate was developed for the North Detailed Business Case and has not been updated because the project is not expected to be delivered in the near term.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 35761 (2026), what is the estimated current market value of the properties impacted by each of the 11 projects listed in that reply, broken down by project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The property cost estimates for the 11 projects are as follows: • Alternative to the Brynderwyn Hills $177,857,000 • Supporting Growth Alliance $653,000,000 • NW Alternative State Highway $242,000,000 • Northwest Busway $1,161,354,000 •…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), is he currently aware of any procurement decision by Ferry Holdings Ltd that did not comply with the Government Procurement Rules; if so, which decisions?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Ferry Holdings has followed the Government Procurement Rules including taking decisions for exemptions where a fair basis has been established.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), have any contracts been suspended, varied, re-tendered, or terminated, or any procurement processes paused, as a result of matters identified in or connected to the review; if so,…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), has any matter arising from or connected to the review been referred to the Office of the Auditor-General, the Serious Fraud Office, the New Zealand Police, or any other enforcement or…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), have any Ferry Holdings Ltd staff or contractors been stood down, suspended, reassigned, or had their delegations altered in connection with the review; if so, how many?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), what are the terms of reference for the review, and will he release them; if not, why not?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Yes, following completion of the review, consideration by the board, consideration Ministers of any update from the board, and consideration of the material in accordance with the provisions of the Official Information Act, the terms of…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), who is conducting the review, and is that reviewer internal or external to Ferry Holdings Ltd?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The reviewer is Esby & Co and is external to Ferry Holdings.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), what briefings, aides-memoire, or other written advice has he or his office received regarding the review, listed by date and title?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

None regarding the review itself, and as noted in the reply to WPQ 35235 (2026), "we will be updated in due course."

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), on what date was he first informed of the review, and by whom?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We do not have a record of the exact date; however, Ferry Holdings started the work in May 2026, and their Chair is in regular contact with my Office and mentioned it to my Private Secretary as is appropriate.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), was the review commenced in response to any complaint, protected disclosure, audit finding, or concern raised internally or externally; if so, on what date was that matter first raised?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No. The review was commenced by the board and chief executive in reference to best practice.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 35235 (2026), on what date did Ferry Holdings Ltd commence its review into its procurement practices, and who made the decision to commence it?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

11 May 2026, based on the decision of the chief executive and board.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What contingency arrangements, if any, are in place for Regional Infrastructure Fund projects, including the 42 flood resilience projects requiring 40 percent local authority co-investment, should a council be unable to meet its share once…

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

The Regional Infrastructure Fund (RIF) is a Budget 2024 initiative appropriated until June 2027, and is approaching full allocation. All flood resilience projects will be underway by 2027. No consideration has been given to increasing the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What impact, if any, does he expect the rates cap, due to take full effect by 2029, to have on the number and value of future Regional Infrastructure Fund applications that depend on local authority co-investment?

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

The Regional Infrastructure Fund is a Budget 2024 initiative appropriated until June 2027, with funds now mostly allocated. As the proposed rates cap has not yet been implemented, how each council will manage implementation is unknown. Any…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 36600 (matches this search)

    When, if at all, did he or his officials first assess the interaction between the Government's proposed rates cap and the co-investment model underpinning the Regional Infrastructure Fund?

  • 36604 (matches this search)

    What assessment, if any, was undertaken within his portfolio of the impact of a rates cap on local authorities' ability to meet co-investment requirements under the Regional Infrastructure Fund before the Government announced its rates cap…

  • 36605 (matches this search)

    What advice, if any, has he received from officials, including Kānoa – Regional Economic Development & Investment Unit, on the impact of the Government's proposed rates cap on the ability of local authorities to co-invest in projects…

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

In 2024, Officials provided advice on each local authorities’ financial position and ability to contribute co-funding for flood resilience projects, in support of the Government’s Regional Infrastructure Fund investment decisions on…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many projects funded or approved for funding through the Regional Infrastructure Fund, if any, have been delayed, rescoped, or withdrawn since 1 December 2025 because a local authority co-investment partner was unable to confirm or…

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

Since 1 December 2025, two Regional Infrastructure Fund projects have been delayed for this reason, none were rescoped or withdrawn.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What discussions, if any, has he had with the Minister of Local Government about the effect of the proposed rates cap on local authorities' capacity to co-invest in Regional Infrastructure Fund projects, and on what dates did any such…

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

None. The Regional Infrastructure Fund is a Budget 2024 initiative appropriated until June 2027, with funds now mostly allocated while the proposed rates cap is yet to be implemented.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which local authorities, if any, have raised concerns with him or his officials about their ability to meet co-investment requirements for Regional Infrastructure Fund projects, including the 40 percent local share of flood resilience…

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

Officials have not been made aware by local authorities of any concerns in relation to their ability to contribute co-funding towards relevant Regional Infrastructure Fund projects.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many of the 42 flood resilience projects allocated $101.1 million from the Regional Infrastructure Fund, announced on 12 August 2024 with local authorities required to co-invest 40 percent of project costs, have had their local…

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

All the projects referred to have had their local authority co-investment share confirmed.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What proportion, if any, of projects approved for funding from the Regional Infrastructure Fund to date rely on co-investment from local authorities, and what is the total value of local authority co-investment committed across those…

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Regional Development

Answer

As at 9 August 2026, 156 projects in total have been approved for funding through the Regional Infrastructure Fund (RIF), of which 90 show the recipient is either a local authority or council-controlled organisation that contributed to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 10 August 2026, listed by agency, title and date received?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

The titles and dates of Transport briefings received from the Ministry of Cities, Environment, Regions and Transport are or will soon be proactively released here:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 10 August 2026, listed by agency, title and date received?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I regularly request and receive advice from officials on a range of matters. MCERT and NZTA publish monthly lists of titles of advice provided to me (refer to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 10 August 2026, listed by agency, title and date received?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for State Owned Enterprises

Answer

As I said in Written Parliamentary Questions 10889 (2025), 11147 (2025), 14770 (2025), 18421 (2025), 19559 (2025), 20746 (2025), 22412 (2025), 27507 (2025), 28436 (2025), 30419 (2025), 30991 (2025), 31535 (2025), 32421 (2025), 33193…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 10 August 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail, KiwiRail Quarter 4 FY26 Performance report, 13 August

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 10 August 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Racing

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 10 August 2026, listed by agency, title and date received?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

As the Minister of Local Government, I received the following advice, reports, briefings, aide memoires, or any other documents from the Ministry of Cities, Environment, Regions and Transport during the week beginning 10 August 2026 •…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 10 August 2026, by title and date?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 10 August 2026, by title and date?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I can advise that I took the following papers through Cabinet during the week beginning 10 August 2026: - Next steps on Waitematā Harbour Connections - 10 August - RUC transition report back and regulations policy…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 10 August 2026, by title and date?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for State Owned Enterprises

Answer

As I said in Written Parliamentary Questions 11040 (2025), 11255 (2025), 14923 (2025), 18528 (2025), 19677 (2025), 20885 (2025), 22550 (2025), 27613 (2025), 28543 (2025), 30527 (2025), 31099 (2025), 31644 (2025), 32532 (2025), 33300…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 10 August 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 10 August 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Racing

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 10 August 2026, by title and date?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What further work, if any, has he requested from KiwiRail or from officials on options to lift passenger frequency above eight trains per hour south of Wiri station, and by what date is that work due to be reported to him?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This work is ongoing between KiwiRail and Auckland Council as part of the transport planning process.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What advice, if any, has he sought or received on rail freight scheduling practices in other jurisdictions, including Australia, where freight services are reported to run off-peak, at night, or on dedicated freight tracks?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We have sought no advice on the scheduling practices of other countries.

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 36278 (matches this search)

    What directions, if any, has he given to KiwiRail in his capacity as Minister for Rail concerning freight movements on the Auckland metro rail network during weekday peak periods?

  • 36279 (matches this search)

    What expectations, if any, has he set for KiwiRail regarding the prioritisation of passenger services over freight movements during peak periods on the Auckland metro rail network, whether by letter of expectations, statement of corporate…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The peaks are due to passenger demand, and as such passengers are the priority during the peak. Freight is also essential for our economy, and also for reducing truck volumes in the busy Auckland centre. We have always been clear that…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When does he expect eight trains per hour to operate south of Wiri station, and what advice, if any, has he received on that timeframe?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

In the fullness of time, following confirmation by the relevant safety case holders.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What funding, if any, has been allocated by the Government to date for an extension of the third main line or for a fourth main line on the Auckland metro rail network, and over what period?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

In 2020, the Minister for State Owned Enterprises (Rt Hon Winston Peters) committed and announced the funding to build the third main line at the busiest rail junction in New Zealand. In 2025, the Minister for Rail (Rt Hon Winston Peters)…