Skip to main content

For each of the 11 projects listed in reply 35761 (2026), what is the average length of time elapsed since the relevant notice of requirement or designation was lodged?

Answered Question 37316 (2026)
Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • For each of the 11 projects listed in reply 35761 (2026), what is the average length of time elapsed since the relevant notice of requirement or designation was lodged?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to the attached document.

Answer attachment

Download WQ_37316_2026.pdf

application/pdf · 99,294 bytes