Written questions

Search written questions to Ministers and the replies they have received.

Filters
Asked by All MPs
Minister All Ministers
Portfolio All portfolios
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 6401 to 6450 of 31958 written question sets.

Question published
Reply lodged

Asked by

Chris Hipkins

Member for Remutaka · Labour Party

Question

  • (matches this search)

    Further to the answer to written question 32114 (2026) from the Minister Responsible for Ministerial Services: on what date, if any, was this invoice approved by Hon Shane Jones’ office?

Answered by

Hon Shane Jones

List MP · NZ First · Minister for Resources

Answer

25 March 2025.

Question published
Reply lodged

Asked by

Ingrid Leary

Member for Taieri · Labour Party

Question

  • (matches this search)

    Did Health New Zealand indicate at any point, after 1 April 2026, whether the concerns the Ombudsman raised about Wakari Hospital Ward 10A were different from those raised in 2022, and if so, on what date did that indication occur?

Answered by

Hon Matt Doocey

Member for Waimakariri · National Party · Minister for Mental Health

Answer

I have had many conversations with officials about the findings from the Ombudsman report, as the Member would expect. I would also refer the Member to the publicly available 2022 report:…

Question published
Reply lodged

Asked by

Ingrid Leary

Member for Taieri · Labour Party

Question

  • (matches this search)

    What specific new information caused the shift from a refurbishment programme to a decision to close Wakari Hospital Ward 10A, and relocate patients?

Answered by

Hon Matt Doocey

Member for Waimakariri · National Party · Minister for Mental Health

Answer

I am advised the decision to close Wakari Hospital Ward 10A, made by the Health New Zealand Board on 1 July 2026 and advised to me on 2 July 2026, was a clinical decision based on the safety needs of individual patients.

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    Has NZQA communicated to any staff, either verbally or in writing, that the functions currently undertaken by Ngā Poutoko Aromatawai Māori will be transferred to another team or positions under the proposed restructure; if so, when and to…

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I am advised that NZQA announced the start of consultation on proposed changes to the Assessment Division to its 180 staff on 15 July.

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    Did NZQA prepare a Te Tiriti impact assessment, Māori impact assessment, or equivalent analysis in relation to the proposed Assessment Division restructure; if so, when was it completed and what were its conclusions?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I am advised that NZQA considered a range of factors relevant to Māori assessment capability, the impacts on staff, and NZQA's ability to continue delivering its functions and services effectively as well as alignment with NZQA Board’s Te…

Question published
Reply lodged

Asked by

Ginny Andersen

List MP · Labour Party

Question

  • (matches this search)

    How many times, if any, have Police prosecuted offences/offenders under s 45 of the Arms Act 1983 since the provision was introduced?

Answered by

Hon Mark Mitchell

Member for Whangaparāoa · National Party · Minister of Police

Answer

I am advised that since the enactment of the Arms Act 1983 and the commencement of the Recorded Crime Offender Statistics (RCOS) in July 2009, there have been 25,410 proceedings against offenders for the offence of "Unlawfully…

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    Is the advertised position of Chief Advisor Assessment - Mātauranga Māori, an existing position, a newly established position, or a replacement for an existing position; if an existing position, what is the name of the role and the details…

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I am advised that the position of Chief Advisor Assessment – Mātauranga Māori is a newly created position. The role provides strategic and specialist leadership to embed mātauranga Māori, Te Ao Māori, and Te Tiriti o Waitangi obligations…

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    Has NZQA advertised any new or replacement positions that would undertake functions currently performed by Ngā Poutoko Aromatawai Māori before consultation on the proposed restructure has concluded; if so, how many positions, what are…

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I am advised that no new or replacement positions that would undertake functions currently performed by Ngā Poutoko Aromatawai Māori have been advertised.

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    What consultation, if any, has she or NZQA undertaken with Māori education organisations, Iwi, kura, and Māori-medium providers in relation to the proposed Assessment Division restructure?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I am advised that NZQA has followed the standard public-sector change process, through which they must consult with staff first.

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    How many organisational restructures, if any, have affected the staff and functions currently undertaken by Ngā Poutoko Aromatawai Māori since 27 November 2023, and what changes to staffing numbers and reporting lines resulted from each…

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I am advised that only one organisational restructure, initiated in May 2024, affected staff and functions currently undertaken by Ngā Poutoko Aromatawai Māori (NPAM). As a result of the final decisions announced on 13 June 2024, the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Will Ferry Holdings Limited table revised prospective financial statements following shareholding Ministers' decisions of July 2026, as contemplated in its Statement of Performance Expectations 2026/27, and if so when?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Yes. The Statement of Performance Expectations for 2026/27 has been available on the Ferry Holdings website since 24 July 2026.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What performance measures, if any, in Ferry Holdings Limited's Statement of Performance Expectations 2026/27 relate to delivering the Cook Strait Ferry Replacement Programme within the $1.7 billion funding envelope or to any cost or budget…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Ferry Holdings is a delivery entity charged with procuring ferries and enabling infrastructure within an appropriated total of $1.704 billion. The performance measure is established by an appropriation limit of $1.704 billion.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has Ferry Holdings Limited applied for classification as a public purpose Crown-controlled company under section CW38B of the Income Tax Act 2007, and what is the income tax liability if that application is unsuccessful?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Yes, and the application has been approved. As noted in the Statement of Performance Expectations, “As a result, no provision for income tax has been recognised in these prospective financial statements.”

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What insurance, if any, does Ferry Holdings Limited hold in respect of the ships under construction and the port infrastructure works, and what is the annual premium?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

None. The fixed price ship contract, approved infrastructure scope, and contingencies are all within the $1.704 billion appropriation for Ferry Holdings Limited costs. Ferry Holdings Limited does not hold any insurance for ships…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What are the top five risks recorded on the Cook Strait Ferry Replacement Programme risk register as at 24 July 2026, and what is the assessed cost impact of each?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information is not disclosed. However, standard infrastructure risks apply and approximately 20% contingency is built into the programme which is funded to the relatively high P85 level.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What Gateway reviews of the Cook Strait Ferry Replacement Programme have been completed since April 2025, what delivery confidence assessment rating was assigned by each, and will those reviews be proactively released?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

A Targeted Investment Review was completed in September 2025 and the first Gateway review was completed in June 2026 as part of the assurance processes leading to Ministers’ approval decisions in July 2026. Two Gateway Reviews found the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What assurance does the Government have that principal repayments on Ferry Holdings Limited's concessionary loans will commence from 1 July 2028 as assumed, and what is the consequence for the programme if they do not?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The Statement of Performance Expectations makes the assurance point quite clear: “Term: Up to 2.5 years, with principal repayments due 1 July 2028.”

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the estimated cost to the programme of every one cent movement in the New Zealand dollar against the United States dollar below the weighted average contract rate of 0.5870 disclosed by Ferry Holdings Limited?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Actually, Ferry Holdings disclosed a weighted average contract rate of 0.5874. The words “weighted average” should provide the member with a strong hint that Ferry Holdings has a range to anticipate exchange rate fluctuation scenarios.…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which entities are the counterparties to the concessionary loans forecast to total $68 million advanced by Ferry Holdings Limited at 0 percent interest against an assumed market rate of 5.75 percent, and what security, if any, does the…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

To the extent that such information can be released, Ferry Holdings Limited has done so in section “l)” of its Statement of Performance Expectations.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the total value in New Zealand dollars of the Cook Strait ferry build contracts denominated in United States dollars, and what proportion of that exposure is covered by the forward foreign exchange contracts with a notional amount…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information has not been disclosed.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the basis for Ferry Holdings Limited capitalising $12.869 million of operating costs to 30 June 2026 and a forecast $12.446 million in 2026/27 as construction in progress rather than expensing them, and what would the reported…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Ferry Holdings Limited is a delivery entity for capital assets that will garner a return. These assets are not generated by magic, but instead by works that attract a cost and can be capitalised. This is quite standard for asset-generating…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, did Ferry Holdings Limited spend on travel and accommodation in the period 5 March 2025 to 30 June 2026, how much is forecast for the year ending 30 June 2027, and how much of that relates to travel to the shipyard in…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is not information held by a shareholding Minister. The member is welcome to seek this information from Ferry Holdings directly.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Why are Ferry Holdings Limited's forecast employee costs of $6.506 million for the twelve months ending 30 June 2027 higher than the $3.380 million incurred over the sixteen months ending 30 June 2026?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The personnel will increase as overall work activities increase, then drop again when the project is completed. This is normal. The member may have missed this, but the waste at Project iReX saw a team of over 100 people spread across two…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many full-time equivalent staff were employed by Ferry Holdings Limited as at 24 July 2026, how many are forecast as at 30 June 2027, and how many, if any, are paid total remuneration exceeding $200,000 per annum?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

As of 12 June 2026, 15 and 7.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does he stand by his statement that the previous Cook Strait ferry project was hijacked by expensive consultants, and how is this consistent with Ferry Holdings Limited's forecast consulting and professional fees of $7.156 million and…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Yes. $8.5 million is 0.2125% of $4 billion, which is the number Treasury warned the previous Government iReX was on course to hit.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, has Ferry Holdings Limited spent on consulting and professional fees, legal fees, contractors and external assurance services in the period 5 March 2025 to 30 June 2026, and how much is forecast for the year ending 30…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Ferry Holdings will provide a full account of its spending in its 2025/26 annual report. This is not information held by the Minister, and can be sought from Ferry Holdings directly if desired before the annual report is published.

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    What advice, if any, has the Minister received on the likely impact of the proposed Assessment Division restructure on NZQA's capability to develop, maintain, and quality assure Māori-medium assessment and qualifications?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I was advised on 15 July 2026 that NZQA would be commencing consultation on proposed changes to the Assessment Division’s structure. As Minister, I do not become involved in NZQA’s operational or internal organisational matters. These are…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What penalties, liquidated damages or incentive payments, if any, are provided for in the infrastructure delivery agreements signed in June 2026 between Ferry Holdings Limited, Port Marlborough, CentrePort and KiwiRail Limited in the event…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information is not disclosed as they are commercial activities. We will never release information that puts taxpayer funds at risk. However, we are satisfied the arrangements place performance incentives appropriately to encourage…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What matters, if any, have been escalated to the Escalation Executives Group established under the Cook Strait Ferry Replacement Programme governance framework since April 2025, and how many remain unresolved?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We hope to see this group working effectively, with leaders resolving matters. It would be a crying shame if leaders did not escalate matters to be resolved, otherwise we would see months of infrastructure indecision leading to an…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What percentage of the special purpose vehicle holding the Picton main wharf and marine assets will be owned by Ferry Holdings Limited and what percentage by Port Marlborough, and on what basis were those shares determined?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

There is an old Māori saying, ‘we pay the price, we pluck the duck.’ As such, shares are determined by money contributed.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has the Crown returns agreement between Ferry Holdings Limited and KiwiRail Limited been signed, and if not, what is the current expected signing date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The decisions in July 2026 were required before these arrangements can be finalised, and are now in train. The core elements underpinning this agreement have been announced in our speech dated 17 July 2026.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the net present value of the payments the Crown expects to receive from KiwiRail Limited under the Crown returns agreement intended to be signed by December 2026, and what discount rate has been used?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information is not disclosed, in the same way as Interislander and Bluebridge do not currently disclose its port fee payments in KiwiRail’s annual report.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What annual payment, if any, will KiwiRail Limited make to Ferry Holdings Limited and the Crown for use of the new Cook Strait ferries and port infrastructure, and over what period is the Crown's investment forecast to be recovered?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information is not disclosed, in the same way as Interislander and Bluebridge do not currently disclose its port fee payments in KiwiRail’s annual report.

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    How many full-time equivalent staff employed by NZQA have primary responsibility for Māori-medium assessment, mātauranga Māori qualifications, or Māori assessment standards?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I am advised that as at 29 July 2026, there are 28.4 full-time equivalent (FTE) staff employed in NZQA with primary responsibility for Māori-medium assessment, mātauranga Māori qualifications, or Māori assessment standards.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the scheduled completion date for each major port infrastructure work package at Wellington and Picton, and which, if any, are currently forecast to be completed later than the date assumed in the November 2025 estimates?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information has not been disclosed but clearly works are scheduled to be completed before the first ferry enters service in 2029.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the estimated cost of the common linkspan design being procured for both Wellington and Picton, and has the contract with the preferred linkspan supplier been signed?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information cannot be disclosed at this time for commercial reasons, but works are progressing well.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What resource consents or other statutory approvals are required for the port infrastructure works at Wellington and Picton, and how many, if any, remain outstanding as at 1 July 2026?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Most works will be carried out under existing consents. Some minor adjacent consents are in progress and are expected soon.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Have early works at Wellington and Picton been completed, and if not, what is the forecast completion date and what additional cost, if any, has been incurred as a result of any delay?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We remain on schedule to complete works in 2029 so yes.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Have main infrastructure works commenced at Wellington as scheduled in July 2026, and if not, what is the revised commencement date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No, as main works contracts will be entered later this year as announced on 17 July 2026. There are ongoing works under existing contracts so Ferry Holdings delivers on time.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Why did the Minister for Rail state on 17 July 2026 that the commercial agreements "set the basis for main works contracts to be entered later this year" when Ferry Holdings Limited's Statement of Performance Expectations 2026/27 states…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

In the very same speech, we acknowledged Brian Perry Civil and HEB as the construction partners already brought into the project by CentrePort and Port Marlborough respectively. As we are talking about taxpayers money being invested,…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    On what date, if any, was the main works construction contract for Wellington signed with Brian Perry Civil, given that Ferry Holdings Limited's Statement of Performance Expectations 2026/27, signed in June 2026, records that negotiations…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Brian Perry Civil is CentePort’s construction partner and the member can ask CentrePort that question. However, main works contracts are expected to be entered later this year.

Question published
Reply lodged

Asked by

Hūhana Lyndon

List MP · Green Party

Question

  • (matches this search)

    What positions, if any, are proposed to undertake the functions currently performed by Ngā Poutoko Aromatawai Māori, under the proposed NZQA Assessment Division restructure, by position title and number of established full-time equivalent…

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Education

Answer

I am advised that if the proposed changes are adopted, the existing functions of the Ngā Poutoko Aromatawai Māori (NPAM) team would continue to be delivered with some changes to the way resources are organised and aligned within…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 33708 (matches this search)

    What regulatory or safety requirements applying to the new Cook Strait ferries remain unconfirmed pending the further marine simulations scheduled for late 2026?

  • 33709 (matches this search)

    What findings, if any, from the marine simulations completed to date indicate that operational restrictions will apply to the new Cook Strait ferries berthing or navigating at Wellington or Picton, and what further simulations remain…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is not information held by a shareholding Minister, but needless to say this likely has a thing or two to do with simulating sailing and berthing operations. This is a standard and ongoing process as part of the design stage of…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the estimated cost of establishing and operating the Ferry Holdings Limited site supervision team at the Guangzhou Shipyard International shipyard, and how many staff will it comprise?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information is not held by shareholding Ministers and can be requested directly from Ferry Holdings.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What float or schedule contingency, if any, exists between the scheduled completion of port infrastructure works in early 2029 and the scheduled arrival of the first Cook Strait ferry in April 2029?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

There is a float in the works programme, but that is for me to know and you to find out. It is a general principle in contract management to keep your cards close, as revealing them gives away leverage and we will not be doing that.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Given that Ferry Holdings Limited's Statement of Performance Expectations 2026/27 states the second Cook Strait ferry will arrive in New Zealand in October 2029 and that both ships will enter service in 2029, what commissioning, sea…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Standard commissioning arrangements are planned including sea trials, crew training, and regulatory certification activities.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Have all milestones under the fixed-price contracts signed in November 2025 between Ferry Holdings Limited and Guangzhou Shipyard International been met on schedule to date, and if not, which have not been met?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

One of the milestones is vessel acceptance on completion, so no.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the scheduled date on which each of the vessels Kupe and Cook is expected to enter commercial service, and how many weeks are allowed between the arrival of each vessel in New Zealand and its entry into service?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information is not disclosed for commercial reasons, but both vessels are expected to be in service within months of arriving in New Zealand.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many variations, if any, to the fixed-price ship building contracts between Ferry Holdings Limited and Guangzhou Shipyard International have been agreed or are under negotiation as at 24 July 2026, and what is their total value?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The fixed-price nature of the ship building contracts remain unchanged. It is a normal and expected part of shipbuilding to update specific components of the contract, such as when an alternative maker is selected. Detailing minor…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 33716 (matches this search)

    How much, if any, has Ferry Holdings Limited assumed it will receive from Marlborough District Council as grant income for the Dublin Street Overbridge in Picton in the year ending 30 June 2027, and what is the status of the agreement…

  • 33717 (matches this search)

    What is the estimated cost of the Dublin Street rail overbridge in Picton, how much, if any, is Marlborough District Council contributing, and has that contribution been contractually confirmed?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail is still in progress on this so we cannot provide specifics, however the cost is in the low tens of millions like other overbridges around the country. Marlborough District Council is not contributing. There will be $10 million as…