Written questions

Search written questions to Ministers and the replies they have received.

Showing 101 to 150 of 161 written questions.

Awaiting reply Question 40227 (2026)
Question published

40227 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has been made of the additional cost to the responsible council of any reduction in the New Zealand Transport Agency funding assistance rate applying to a special purpose road over the 2027-30 National Land Transport…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 40226 (2026)
Question published

40226 (2026). Mike Davidson to the Minister of Transport

Asked by

Mike Davidson

List MP · Green Party

Question

What advice, briefings, reports or correspondence has the Minister had, if any, on the roading maintenance and/or rates impacts of lowering the Financial Assistance Rate for Councils?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39784 (2026)
Question published

39784 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What correspondence, if any, did the Minister have with Horizons Regional Council prior to announcing the disapplication of the "prescribed nitrogen reductions" in the Manawatū/Whanganui region that would have taken effects under Plan…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

No reply has been published yet.

Awaiting reply Question 39783 (2026)
Question published

39783 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What correspondence, if any, did the Minister have with industry bodies representing farmers prior to announcing the "prevent[ion] [of] the restrictive elements on Plan Change 1 from applying during the transition period to the new…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

No reply has been published yet.

Awaiting reply Question 39781 (2026)
Question published

39781 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What correspondence, if any, did the Minister have with Waikato Regional Council prior to announcing the "prevent[ion] [of] the restrictive elements on Plan Change 1 from applying during the transition period to the new planning system",…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

No reply has been published yet.

Awaiting reply Question 39779 (2026)
Question published

39779 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What correspondence, if any, did the Minister have with industry bodies representing farmers prior to announcing the disapplication of the "prescribed nitrogen reductions" in the Manawatū/Whanganui region that would have taken effects…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

No reply has been published yet.

Awaiting reply Question 39741 (2026)
Question published

39741 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What were Appendix 1 Topics C and D as listed at paragraph 4 in the Briefing the Minister received titled "26-BRF-00808, Planning and Natural Environment Bill - Ministerial decisions to inform Departmental Reports (part 2)" dated 7 April…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

No reply has been published yet.

Awaiting reply Question 39740 (2026)
Question published

39740 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What topics were covered in Appendices 2, 3, and 4 as listed following paragraph 4 in the Briefing the Minister received titled "26-BRF-00808, Planning and Natural Environment Bill - Ministerial decisions to inform Departmental Reports…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

No reply has been published yet.

Awaiting reply Question 39738 (2026)
Question published

39738 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What effect, other than "greenhouse gas emissions" did Under-Secretary Simon Court suggest for potential exclusion from the Natural Environment Bill, as noted under "A1" in Appendix 1 to the Briefing the Minister received titled…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

No reply has been published yet.

Awaiting reply Question 39737 (2026)
Question published

39737 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How many approved organisations, if any, will receive a New Zealand Transport Agency normal funding assistance rate in 2029/30 that is lower than, higher than, or the same as their 2026/27 rate, broken down by organisation and by the…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39735 (2026)
Question published

39735 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What normal funding assistance rate has the New Zealand Transport Agency set for each approved organisation, broken down by organisation and by each of the 2024/25, 2025/26, 2026/27, 2027/28, 2028/29 and 2029/30 financial years?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39734 (2026)
Question published

39734 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What are the maximum and minimum New Zealand Transport Agency normal funding assistance rates, and the overall National Land Transport Fund co-investment rate, being the average share of local land transport programmes met nationally from…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39733 (2026)
Question published

39733 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What value or score was recorded for each input variable used in the New Zealand Transport Agency's methodology for setting normal funding assistance rates for the 2027-30 National Land Transport Programme, broken down by approved…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39732 (2026)
Question published

39732 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has the Minister received directly from a council of the dollar cost to that council of its New Zealand Transport Agency normal funding assistance rate for the 2027-30 National Land Transport Programme, compared with…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39731 (2026)
Question published

39731 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Which approved organisations, if any, received a temporarily enhanced New Zealand Transport Agency normal funding assistance rate following Cyclone Gabrielle, broken down by organisation, by the enhanced rate received, and by the rate set…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39730 (2026)
Question published

39730 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How many submissions or written responses, if any, did the New Zealand Transport Agency receive from councils and other approved organisations on the proposed normal funding assistance rates for the 2027-30 National Land Transport…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39729 (2026)
Question published

39729 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How many requests or representations, if any, have the New Zealand Transport Agency or the Minister received seeking reconsideration of a normal funding assistance rate set for the 2027-30 National Land Transport Programme, broken down by…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39728 (2026)
Question published

39728 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has been made of the additional cost, if any, falling on councils and other approved organisations, in dollars, as a result of changes to New Zealand Transport Agency normal funding assistance rates over the three…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39727 (2026)
Question published

39727 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the forecast expenditure from the National Land Transport Fund on local road maintenance, operations and renewals over the 2027-30 National Land Transport Programme, broken down by approved organisation and by financial year, and…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39726 (2026)
Question published

39726 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What proportion of each approved organisation's total land transport expenditure was met from the National Land Transport Fund during the 2024-27 National Land Transport Programme, broken down by organisation and by financial year?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39725 (2026)
Question published

39725 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has been made of the increase, if any, in rates a council would need to levy in order to maintain its planned local road maintenance and renewal programme unchanged after its New Zealand Transport Agency normal…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39724 (2026)
Question published

39724 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How many councils or other approved organisations, if any, have advised the New Zealand Transport Agency or the Ministry of Transport that they intend to reduce, defer or reprioritise planned road maintenance, renewal or bridge work…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39723 (2026)
Question published

39723 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What funding assistance rate for public transport services has the New Zealand Transport Agency set for each regional council and unitary authority, broken down by council and by each of the 2026/27, 2027/28, 2028/29 and 2029/30 financial…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39722 (2026)
Question published

39722 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What New Zealand Transport Agency funding assistance rate applies to total mobility services, being the subsidised transport scheme for people unable to use conventional public transport, broken down by approved organisation and by each…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39721 (2026)
Question published

39721 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has been made of the additional cost falling on regional councils and unitary authorities as a result of changes to New Zealand Transport Agency public transport funding assistance rates over the three years of the…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39720 (2026)
Question published

39720 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What New Zealand Transport Agency funding assistance rate applies to emergency works, being repairs to local roads damaged by storms, floods and other events, broken down by approved organisation and by each year of the 2027-30 National…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39719 (2026)
Question published

39719 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What amount, if any, has been paid from the National Land Transport Fund towards emergency works on local roads since 1 July 2023, broken down by approved organisation and by financial year?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39718 (2026)
Question published

39718 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What methodology did the New Zealand Transport Agency use to set normal funding assistance rates for the 2027-30 National Land Transport Programme, and in what respects, if any, does that methodology differ from the one used to set rates…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39717 (2026)
Question published

39717 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What role, if any, did the Minister have in the setting of New Zealand Transport Agency normal funding assistance rates for the 2027-30 National Land Transport Programme, and on what dates, if any, was the Minister consulted or informed…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39709 (2026)
Question published

39709 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 34451 (2026), how much, if any, has the NZ Transport Agency spent to date on external professional services for the Northland Corridor programme as a whole, broken down by section (Warkworth to Te Hana; Te Hana to Port…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39708 (2026)
Question published

39708 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 66207 (2024), are external professional services costs for the corridor now recorded against individual sections; if so, from what date, and if not, what is the total programme-level spend on external professional services…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39707 (2026)
Question published

39707 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How much, if any, has the NZ Transport Agency spent on external professional services for the Northland Corridor programme in each financial year from 2023/24 to 2025/26, broken down by financial year and by section?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39706 (2026)
Question published

39706 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Are any external advisers engaged on the Northland Corridor programme remunerated on a success-fee, contingent or milestone basis; if so, which advisers, what milestones apply, and what is the total value of such fees paid or payable to…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39705 (2026)
Question published

39705 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the total value paid or payable to Arup, Tonkin & Taylor and Bureau Veritas, whether individually or through Tūtahi Joint Venture, for services in relation to any section of the Northland Corridor since 27 November 2023, broken…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39704 (2026)
Question published

39704 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Which ten external suppliers have been paid the most for consultancy, engineering, legal, financial or advisory services in relation to the Northland Corridor programme since 27 November 2023, and what is the total paid to each?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39703 (2026)
Question published

39703 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Which external advisers engaged by the NZ Transport Agency on the Warkworth to Te Hana public-private partnership are also engaged on the Te Hana to Whangārei sections of the Northland Corridor, if any, and what ringfencing arrangements of…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39702 (2026)
Question published

39702 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Is the $98 million in external professional services costs recorded in Reply 34451 (2026) included within the $3.649 billion net present value cost of the Warkworth to Te Hana project referred to in Reply 34979 (2026), or is it additional…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39701 (2026)
Question published

39701 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the total contract value and term of the independent reviewer contract awarded to Tūtahi Joint Venture for the Warkworth to Te Hana public-private partnership, and is that cost borne by the NZ Transport Agency, the Northway…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39700 (2026)
Question published

39700 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 34450 (2026), has the bid cost reimbursement for the two unsuccessful Warkworth to Te Hana bidders now been finalised; if so, what amount was paid to each and on what date, and if not, when is finalisation expected?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39699 (2026)
Question published

39699 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How much, if any, did the NZ Transport Agency pay external advisers to prepare the Public Sector Comparator and value-for-money assessment for the Warkworth to Te Hana public-private partnership, and which firms were engaged?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39698 (2026)
Question published

39698 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the NZ Transport Agency's forecast annual client-side cost of managing the Warkworth to Te Hana Project Agreement over the 25-year operational period referred to in Reply 34979 (2026), and how much of that cost is expected to be…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39697 (2026)
Question published

39697 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Of the $42.8 million in technical services recorded in Reply 34451 (2026), what proportion relates to geotechnical investigation data that has been provided to the Northway consortium, and did the consortium pay any amount for that data or…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39696 (2026)
Question published

39696 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How much, if any, has the NZ Transport Agency spent on external professional services for the Alternative to the Brynderwyn Hills, including preparation of the statutory approvals application referred to in Reply 34402 (2026), broken down…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39695 (2026)
Question published

39695 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What did the Northland Corridor investment case referred to in Reply 66207 (2024) cost to produce, broken down by NZ Transport Agency internal costs and external professional services, and which firms were engaged?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39694 (2026)
Question published

39694 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 34451 (2026), which recorded $27.7 million in legal services and advice for Warkworth to Te Hana, how much, if any, has the NZ Transport Agency spent on external legal services for the Te Hana to Port Marsden Highway and…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39693 (2026)
Question published

39693 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 34402 (2026), which advised that no decision has been made on a procurement model for the sections beyond Warkworth to Te Hana, how much, if any, has the NZ Transport Agency spent or committed on external commercial,…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 39692 (2026)
Question published

39692 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How much does the NZ Transport Agency expect to spend on external professional services for the Te Hana to Port Marsden Highway and Port Marsden Highway to Whangārei sections in each of 2026/27 and 2027/28, if any, and what proportion of…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Answered Question 39630 (2026)
Question published

39630 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What advice, reports, briefings, aide memoires, or any other documents has the Minister or any member of their office received, if any, during the week beginning 31/08/2026, by title and date?

Answered by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I refer the Member to my reply to written question 39363 (2026)

Answered Question 39629 (2026)
Question published

39629 (2026). Lan Pham to the Minister responsible for RMA Reform

Asked by

Lan Pham

List MP · Green Party

Question

What papers, if any, did the Minister take to Cabinet during the week beginning 31/08/2026, by title and date?

Answered by

Chris Bishop

Member for Hutt South · National Party · Minister responsible for RMA Reform

Answer

I refer the Member to my reply to written question 39466 (2026).

Awaiting reply Question 39533 (2026)
Question published

39533 (2026). Vanushi Walters to the Attorney-General

Asked by

Vanushi Walters

List MP · Labour Party

Question

What papers, if any, did the Attorney-General take to Cabinet during the week beginning 31 August 2026, by title and date?

For answer by

Chris Bishop

Member for Hutt South · National Party · Attorney-General

Answer

No reply has been published yet.