Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What is the NZ Transport Agency's total expenditure to date on Hamilton Southern Links, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $3.5 million Property $1.2 million 2025/26 (as at 31 May 2026) Investment Case $0.776 million Pre Implementation $3.8 million Property $3.2 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to Mill Road over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency does not anticipate any spend on public consultation and community engagement in relation to Mill Road Stage 1 over the remainder of the 2024-27 National Land Transport Programme period.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What is the NZ Transport Agency's total expenditure to date on Mill Road, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $4.5 million Pre Implementation $3 million Property $4.5 million 2025/26 (as at 31 May 2026) Investment Case $1.4 million Pre Implementation $24 million Property $43.4 million Please note, figures are inclusive of…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to the East-West Link over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Consultation/engagement activities over the remainder of the 2024-27 National Land Transport Programme period are currently being considered to align with project phasing in the Major Transport Projects Pipeline.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What is the NZ Transport Agency's total expenditure to date on the East-West Link, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $3.9 million Pre Implementation $0.166 million 2025/26 (as at 31 May 2026) Investment Case $1.5 million Pre Implementation 2.9 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to the SH16 North-West Alternative State Highway over the remainder of the 2024-27 National Land Transport Programme…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency does not anticipate any spend on public consultation and community engagement in relation to SH16 North-West Alternative State Highway over the remainder of the 2024-27 National Land Transport Programme period.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What is the NZ Transport Agency's total expenditure to date on the SH16 North-West Alternative State Highway, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Property $39.7 million 2025/26 (as of 31 May 2026) Property $33 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to the Northland Corridor over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Consultation/engagement activities over the remainder of the 2024-27 National Land Transport Programme period are currently being considered to align with project phasing in the Major Transport Projects Pipeline.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What is the NZ Transport Agency's total expenditure to date on the Northland Corridor, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Programme Management $14.7 million Investment Case $6.8 million Pre Implementation $50 million Property $22.5m 2025/26 (as at 31 May 2026) Programme Management $5.5 million Pre Implementation $101.5 million Property $107.8 million

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What consultation, if any, has the Government undertaken on the proposed expansion of Five Eyes or Migration 5 data-sharing arrangements to include citizens’ criminal offending information?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

As the Minister of Immigration I do not have any responsibility for New Zealand citizens. However, I am advised that no consultation beyond the Government agencies involved in the Migration 5’s Criminal Data Checking project (MBIE,…

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What position, if any, has the Government taken on the proposed expansion of Five Eyes or Migration 5 data-sharing arrangements to include citizens’ criminal offending information?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

As the Minister of Immigration I do not have any responsibility for New Zealand citizens. However, I am advised that NZ representative agencies on the Migration 5’s Criminal Data Checking project (MBIE, Ministry of Justice and NZ Police)…

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What advice, if any, has the Minister received on the proposed expansion of Five Eyes or Migration 5 data-sharing arrangements to include citizens’ criminal offending information?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None. Migration 5 heads agreed to pause this work in April 2026 following an exploratory phase.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What advice, if any, has the Minister received on the retention period for biometric information shared by New Zealand through Migration 5?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What advice, if any, has the Minister received on whether biometric or biographic information shared through Migration 5 may be onward shared by partner countries?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None.

Questions published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Questions

  • 31859

    What advice, if any, has the Minister received on procurement options for any future biometric capability project intended to replace the Biometric Capability Upgrade?

  • 31861

    What work, if any, is Immigration New Zealand undertaking to upgrade biometric technology used for immigration identity, visa, border, or compliance functions?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None. I am advised that MBIE continues to explore options for investment in Immigration New Zealand's identity management solution (including biometric capability) and will provide me with advice in due course.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What briefings, if any, has the Minister received since 24 June 2026 relating to Migration 5, listed by title and date?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What information technology projects, if any, are currently being considered by Immigration New Zealand to replace or continue any capability intended to be delivered by the Biometric Capability Upgrade project?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

I am advised that MBIE continues to explore options for investment in Immigration New Zealand's identity management solution (including biometric capability) and will provide me with advice in due course.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What advice, if any, has the Minister received on whether New Zealand’s Migration 5 arrangements require further public reporting?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What advice, if any, has the Minister received on whether New Zealand’s Migration 5 arrangements require further parliamentary oversight?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What discussions, if any, has the Minister had with officials since 24 June 2026 about New Zealand’s continued participation in Migration 5?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What decisions, if any, has the Minister made since 24 June 2026 relating to New Zealand’s continued participation in Migration 5?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What advice, if any, has the Minister received since 24 June 2026 on New Zealand’s continued participation in Migration 5?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

None.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • What work, if any, is currently underway to support New Zealand's ongoing participation in Migration 5?

Answered by

Hon Erica Stanford

Member for East Coast Bays · National Party · Minister of Immigration

Answer

I am advised that New Zealand's ongoing participation in the Migration 5 is predominately led by Immigration New Zealand and consists of a number of working level groups of subject matter experts, and meetings of senior officials to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • When is main construction of Hamilton Southern Links, expected to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Public consultation is not a discrete cost category and occurs throughout the project development lifecycle. Costs occur across investment case, property, pre-implementation and implementation phases.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What advice, if any, did the New Zealand Infrastructure Commission give the Government in 2025 on whether an increase in fuel excise duty is required to fund the Roads of National Significance programme?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister for Infrastructure

Answer

The New Zealand Infrastructure Commission did not provide me with advice on the relationship between fuel excise duty revenue and the Government’s ability to meet its Roads of National Significance programme.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What distinguishes placing a project in Phase Three ("continuing more slowly") of the July 2026 Major Transport Projects Pipeline from deferring that project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

A Phase Three project remains in the Major Transport Projects Pipeline and continues to be progressed in a managed way, with work sequenced to align with funding availability and delivery readiness.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • What is Tenancy Services' current average and maximum timeframe for a tenant to obtain their tenant number when they request it by telephone, measured since 1 January 2026, broken down by month?

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

Service Centre data does not separately identify tenant number enquiries from other bond-related calls and, therefore, the average and maximum timeframes for tenants to obtain their tenant number by telephone since 1 January 2026,…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • Has detailed design of Stage 1 (Galway Link) of the East West Link commenced, as signalled on 20 October 2025; if so, when is it expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Detailed design for the East West Link Stage 1 is not currently being progressed. This work will progress in the future subject to funding availability.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • Of the $32 million announced on 20 October 2025 to progress design, consenting and procurement activities for Petone to Grenada and the Cross Valley Link, how much has been spent to date, and what procurement activities have been…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Procurement for the preparation of the notice of requirement and associated work was completed in January 2026. As at 30 April 2026, $14.8m has been spent on design and consenting activities for Petone to Grenada.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • In each month from January 2026 to June 2026, how many bond refunds were initiated by tenants themselves, and how many have been initiated by tenants (by any means, including by telephone or paper form) since 29 June 2026?

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

MBIE can provide the total number of bond refund applications received during the relevant period via post or email. However, it cannot accurately report on how many were initiated by tenants as they do not collect or record this…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • Since 29 June 2026, how many bond refund applications have been approved on the landlord's or property manager's submitted version because the tenant did not respond within the applicable response period, and what was that number for the…

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

Since 29 June 2026 landlords have been required to submit bond refund applications through either BondHub, a web-based offering, or through the Business-to-Business connection with Property Management Software. From 29 June to 13 July 2026…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • How many calls were received by the Tenancy Services contact centre in each week from 29 June 2026 to date, how does this compare with the equivalent weeks before 29 June 2026, and what was the average call wait time in each of those…

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

Calls to Tenancy Services Service Centre include calls regarding Bonds, the Mediation Tribunal and other Tenancy related queries. Calls received over the weeks requested, for all three categories, were: Monday 13 July – 1,513 Monday 6 July…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • Of all tenants associated with active bonds as at 29 June 2026, how many, if any, do not have a valid email address or mobile number recorded and would therefore receive bond notifications only by post?

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

As at 15 July 2026, for all tenants associated with active bonds: Total Active Tenants in bond system: 902,992. • Count of Active tenants with an email: 703,442 • Count of Active tenants with no email: 199,550 Of the tenants with no email:…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • What equity analysis, if any, was undertaken on the effect of the 29 June 2026 bond refund changes on Māori, Pacific, low-income, elderly, or disabled tenants?

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

While a specific equity analysis was not undertaken, the focus was on ensuring any tenants who would not be able to access the new system through email, text or internet would be supported with the ability to obtain and lodge bond forms…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • What specific steps has the Minister or Tenancy Services taken to ensure tenants without reliable digital access, or with out-of-date contact details, are not disadvantaged by a refund process that depends on emailed or texted notification…

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

Tenancy Services are required to ensure that all parties to a bond have the opportunity to respond to a request for a bond refund. In the past this has been proven through a form signed by all parties. From 29 June, when digital bond…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • How many submissions or representations opposing the removal of tenant-initiated online bond refunds were received from tenant advocacy groups, if any?

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

Tenancy Services has not removed the ability of tenants to initiate bond refunds, therefore no submissions or representations were received. Landlords are now required to initiate bond transactions digitally, using either BondHub, our…

Questions published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Questions

  • 31377

    For what reasons was the ability for a tenant to initiate their own bond refund via a downloadable form or online request removed as part of the 29 June 2026 changes?

  • 31379

    When, if at all, did the Minister, or officials acting under delegation, decide to discontinue the downloadable tenant bond refund form and require bond refunds to be initiated by landlords or property managers through Bond Hub from 29…

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

The ability for tenants to initiate their own bond refund has not been removed since 29 June, instead while the tenant-initiated bond refund form is no longer available on the Tenancy Services website for download, this form is still…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • What regulatory impact analysis, cost-benefit assessment, or equivalent advice was prepared before the 29 June 2026 bond refund changes, if any?

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

The Tenancy Bond Modernisation programme, Te Riu Kairangi, received funding through Budget 2021 to transform the management of tenancy bonds to a new modernised bond system through an automated, digital service, bringing benefits to…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • What public consultation, if any, did MBIE or Tenancy Services undertake before the 29 June 2026 bond refund changes, with which tenant advocacy organisations was it conducted, and over what period?

Answered by

Hon Tama Potaka

Member for Hamilton West · National Party · Associate Minister of Housing

Answer

The Tenancy Modernisation programme had a strong focus on achieving benefits for landlords, tenants and the Crown. MBIE engagement with customers consistently identified that timeliness of bond refunds was a key performance indicator and…

Question published
Reply lodged

Asked by

Phil Twyford

Member for Te Atatū · Labour Party

Question

  • What are the Shorter Stays in Emergency Departments results (actuals v targets) for Waitakere Hospital for the last four quarters?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Shorter Stays in Emergency Departments (SSED) health target is for 95 percent of patients to be admitted, discharged, or transferred from an emergency department within six hours by 2030. I am further advised that for…

Question published
Reply lodged

Asked by

Teanau Tuiono

List MP · Green Party

Question

  • Further to 30116 (2026), what was the purpose of each of the three meetings between the Chief of the Defence Force and Lockheed Martin?

Answered by

Hon Chris Penk

Member for Kaipara ki Mahurangi · National Party · Minister of Defence

Answer

The meetings on 21 Nov 2024 were site visits to Trentham and Linton Military Camps as referenced in WPQ 30116 (2026). Both the 3 and 8 July 2025 meetings at Defence House were in-person to discuss in-service support requirements.

Question published
Reply lodged

Asked by

Teanau Tuiono

List MP · Green Party

Question

  • What statements, resolutions or other activities, if any, has the Government taken about the detention of Dr Abu Safiya by date and title?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister of Foreign Affairs

Answer

We are aware of reports regarding the treatment of Palestinian paediatrician Dr Hussam Abu Safiya in Israeli custody. We have been advised by the Ministry of Foreign Affairs and Trade that officials intend to raise the case with Israeli…

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • In the year to March 2026, what was the number clients who received food grants, the average value of food grants received by each client, and the number of those clients who received food grants up to or near the cap for a six-month…

Answered by

Hon Louise Upston

Member for Taupō · National Party · Minister for Social Development and Employment

Answer

I refer the member to the attached table, which provides the number of clients who were granted food hardship grants, total amount granted, and average grant amount between 1 April 2025 to 31 March 2026. I am advised that the number of…

Question published
Reply lodged

Asked by

Teanau Tuiono

List MP · Green Party

Question

  • What response, if any, has the Minister given to the letter from Cameron Pitches about the detention of Dr Abu Safiya by date and title?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister of Foreign Affairs

Answer

Correspondence received on the detention of Dr Abu Safiya was referred to the Ministry of Foreign Affairs and Trade for response. We are advised that the Ministry respondede to Cameron Pitches on 17 July 2026.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • Why is the Cross Valley Link shown at feasibility/investment-case stage in the July 2026 Major Transport Projects Pipeline when its investment case was described alongside Petone to Grenada in the Government's 20 October 2025 announcement?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Cross Valley Link project is being progressed by Hutt City Council. It has an important network relationship with the Petone to Grenada (P2G) project but does not form part of the P2G scope.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • When does the Minister of Transport expect an investment case for the Cross Valley Link to be completed, following the feasibility study shown as completed in the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Investment Case for the Cross Valley Link is being developed by Hutt City Council, and timelines for delivery are the responsibility of the Council.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What NZTA funding, if any, is committed to the Cross Valley Link?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No NZTA funding has been committed to this project to date.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What NZTA co-funding, if any, is committed to the Airport to Botany Busway Stages 3 and 4?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No NZTA co-funding commitment for Airport to Botany Busway Stages 3 and 4 has been made. It is expected this will be part of the prioritisation of funding through the upcoming Auckland Regional Land Transport Plan and 30 Year Plan.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • When are route protection or main construction of the Airport to Botany Busway Stages 3 and 4, listed as a council-led project in Phase Three of the July 2026 Major Transport Projects Pipeline, expected to occur, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Route protection is already complete for stages 3 and 4. The 2021 Single Stage Business Case recommended staged delivery: the western section (Airport–Manukau via Puhinui) in the next decade, followed by the eastern section…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What NZTA co-funding, if any, is committed to the Auckland Level Crossings Removal (including Western Line) project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA has committed $4.8 million to the Level Crossing Safety Impact Assessment, $200 million for the Takanini and Glen Innes level crossing removals construction phase, and $8 million for the Western Line business case.