Showing 401 to 450 of 1461 written question sets.

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What automated approvals, if any, are currently operating within the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

None

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What procurement process, if any, was used for purchasing artificial intelligence tools, if any, currently being used within the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The standard NZTA procurement process was followed for the procurement of Microsoft 365 Copilot. The licences were acquired through NZTA’s existing Microsoft Cloud Software and Services Agreement (MCSSA) and Microsoft enterprise licensing…

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What public engagement surveys, if any, have been completed regarding the use of artificial intelligence in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, since 27…

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

Nil

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What automated approvals, if any, are currently operating within the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

Nil

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What procurement process, if any, was used for purchasing artificial intelligence tools, if any, currently being used within the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if…

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

I am advised that the CAA has undertaken one direct source procurement for an artificial intelligence (AI) proof-of-concept project. The CAA has also purchased a limited number of Microsoft Copilot licences for a product trial through its…

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What algorithm impact assessments, if any, have been done in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, since 27 November 2023?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA does not undertake standalone Algorithm Impact Assessments. The potential impacts of algorithms are considered as part of the risk assessment and approval process that applies to every Artificial Intelligence (AI) use case before it…

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What algorithm impact assessments, if any, have been done in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, since 27 November 2023?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

Nil

Question published
Reply lodged

Asked by

Jo Luxton

List MP · Labour Party

Question

  • (matches this search)

    Will the Minister commit to directing NZ Transport Agency Waka Kotahi to look into a nationally consistent permit system for agricultural machinery that cannot currently obtain permits under the Vehicle Dimensions and Mass Rules; if not,…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that it already operates a nationally consistent permitting framework for overweight and overdimension vehicles, including agricultural machinery, for state highways and local roads where an agreement is in place with…

Question published
Reply lodged

Asked by

Jo Luxton

List MP · Labour Party

Question

  • (matches this search)

    Has the Minister received advice on the number of forage harvesters, tractors, combines, cultivators, or other agricultural machines that cannot be lawfully operated on the road network due to current Vehicle Dimensions and Mass…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No

Question published
Reply lodged

Asked by

Jo Luxton

List MP · Labour Party

Question

  • (matches this search)

    How many state highway and local road bridges are currently subject to restrictions that limit or prevent the movement of agricultural machinery that exceeds the standard Vehicle Dimensions and Mass limits?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that it is unable to provide an exact number, as this is dependent on a specific assessment of route and vehicle to identify the restrictions required to cross the structure.

Question published
Reply lodged

Asked by

Jo Luxton

List MP · Labour Party

Question

  • (matches this search)

    How many, if any, overweight permit or specialist vehicle permit applications for agricultural machinery have been declined in each of the past five years, and what were the reasons for those decisions?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that the number of overweight permit or specialist vehicle permit applications for agricultural machinery that have been declined by NZTA in each of the past five years, as at 17 June 2026, is as follows: • 2021 – 0 • 2022 – 2…

Question published
Reply lodged

Asked by

Jo Luxton

List MP · Labour Party

Question

  • (matches this search)

    For an agricultural vehicle load that exceeds the maximum weight, how many separate permits may be required for a farmer or rural contractor to move a single agricultural machine across multiple road controlling authority jurisdictions,…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that an agricultural vehicle may need two permits from NZTA for access to the state highway network that NZTA is the road controlling authority for (an overweight and overdimension permit). The maximum number of…

Question published
Reply lodged

Asked by

Jo Luxton

List MP · Labour Party

Question

  • (matches this search)

    Does NZ Transport Agency Waka Kotahi have the ability to issue exemptions, or other approvals for agricultural vehicles that exceed current Vehicle Dimensions and Mass limits if a permit cannot be granted; if so, under what circumstances?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that the Director of Land Transport can provide for exemptions from the Land Transport Rule: Vehicle Dimension and Mass Limits 2016 under s168D(3) of the Land Transport Act 1998. This requires the Director to consider:…

Question published
Reply lodged

Asked by

Jo Luxton

List MP · Labour Party

Question

  • (matches this search)

    What categories of agricultural machinery have been identified by NZ Transport Agency Waka Kotahi as being unable to obtain permits under the current Vehicle Dimensions and Mass requirements?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZTA does not decline any specific categories of agricultural machinery for a permit. Each application for a specific vehicle and route is assessed to see if it complies with the relevant Vehicle Dimension and Mass…

Question published
Reply lodged

Asked by

Jo Luxton

List MP · Labour Party

Question

  • (matches this search)

    How many agricultural vehicles or machines are currently unable to obtain permits to operate on New Zealand roads under the Vehicle Dimensions and Mass requirements?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised by NZTA that it is unable to provide an exact number as this is dependent on a specific assessment of route and vehicle to identify the appropriate restrictions.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 19 July 2026, by title and date?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I can advise that I did not take any papers through Cabinet during the week beginning 20 July 2026.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 19 July 2026, by title and date?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 19 July 2026, listed by agency, title and date received?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I regularly request and receive advice from officials on a range of matters. MCERT and NZTA publish monthly lists of titles of advice provided to me (refer to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 19 July 2026, listed by agency, title and date received?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

The titles and dates of Transport briefings received from the Ministry of Cities, Environment, Regions and Transport are or will soon be proactively released here:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance or other major transport projects, if any, has NZTA withdrawn, surrendered, allowed to lapse, or begun withdrawing a notice of requirement or designation for since 1 January 2024, and on what dates?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA is in the process of withdrawing its Notice of Requirement for a designation of land for the East West Link project, which was lodged with the Environmental Protection Authority in 2016.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance in the future (unscheduled) phase of the July 2026 Major Transport Projects Pipeline, if any, does NZTA intend to retain, allow to lapse, or withdraw existing notices of requirement or designations for,…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA is currently in the process of withdrawing its Notice of Requirement for a designation of land for the East West Link project, which was lodged with the Environmental Protection Authority in 2016. For the remaining RoNS projects that…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance currently have a confirmed designation held by NZTA, and which of those designations, if any, have a lapse date within the next five years?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

i am advised NZTA holds confirmed designations for the following Roads of National Significance projects: Warkworth to Te Hana, Hamilton Southern Links, Cambridge to Piarere, Ōtaki to north of Levin, Takitimu North Link, SH16 North-West…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance, if any, have had their preferred route changed since 1 January 2024 such that an existing notice of requirement or designation no longer fully overlaps the preferred route?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Since 1 January 2024, NZTA has refined the preferred routes for a number of projects as investment cases and pre-implementation work have been completed. This includes the East West Link, Petone to Grenada, and SH1 Wellington Improvements…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current phase of route protection for the SH1 Wellington Improvements project, the Brynderwyns section of the Northland Expressway, SH29 Tauriko (Wider Scope), and Northwest Busway Stage 3, and by what date is a notice of…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

SH1 Wellington Improvements is currently in the route protection phase, with design, consenting and statutory approval activities underway. NZTA expects to lodge its Fast-track Approvals Act application in August 2026. The Brynderwyns…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What extensions to designation lapse dates, if any, has NZTA sought, or does it intend to seek, for Roads of National Significance that have no construction start date in the July 2026 Major Transport Projects Pipeline, and for which…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA is submitting an application to extend the lapse date for the Mill Road Stage 1 designations. Most other existing designations have been given effect to or have long lapse dates. NZTA will continue to monitor if any lapse dates need…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance, if any, hold a resource consent or Fast-track approval that has been granted but not yet given effect, and which of those have a lapse date within the next five years?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Roads of National Significance that have designation alterations, resource consents, and other statutory approvals under the Fast-track Approvals Act are Takitimu Northern Link Stage 2 and Belfast to Pegasus Project. The resource…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance or other major transport projects, if any, has NZTA surrendered, withdrawn, or allowed to lapse a resource consent or Fast-track approval for since 1 January 2024, and on what dates?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA is currently in the process of withdrawing its resource consent applications for the East West Link project, which were lodged with the Environmental Protection Authority in 2016.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance, if any, have had consenting or designation work paused or stopped since 1 January 2024, and what is the current status of any Fast-track Approvals Act application for each?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Since 1 January 2024, NZTA has paused or stopped consenting or designation work on the following Roads of National Significance: • Northland Corridor – Te Hana to Whangārei (excluding the Alternative to the Brynderwyn Hills) – designation…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance or other major transport projects, if any, has NZTA opened a tender or procurement process for since 1 January 2024 that has not resulted in a contract being entered into?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which tenders for consenting, design, or construction works on Roads of National Significance, if any, has NZTA cancelled, discontinued, or declined to award since 1 January 2024, and on what dates?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Since 1 January 2024, NZTA has cancelled, discontinued, or declined to award the following tenders relating to Roads of National Significance: • East West Link – NZTA commenced market engagement, including an Expression of Interest, for…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which consenting, design, or early-works contracts, if any, has NZTA terminated or reduced in scope for Roads of National Significance that have no construction start date in the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As reflected in the July 2026 Major Transport Projects Pipeline, NZTA has reduced the scope of, or paused, consenting, design or early works activities for the following Roads of National Significance that do not have a confirmed…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many properties has NZTA acquired to date for each Road of National Significance, and what is the total property-acquisition expenditure for each?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance or other major transport projects, if any, does NZTA intend to dispose of, offer back, or cease acquiring land for as a result of the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

East West Link – As a result of the July 2026 Major Transport Projects Pipeline, NZTA is progressing the withdrawal of the existing Notice of Requirement for a designation of land. Once the Notice of Requirement has been withdrawn, NZTA…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many landowners, if any, across the Roads of National Significance programme have been, or will be, notified that route protection or intended property acquisition affecting their land is being withdrawn?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The East West Link project is currently in the process of identifying and informing affected landowners. To date, 103 landowners have been advised by letter of the intended uplift of the existing Notice of Requirement.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance is NZTA continuing focused property acquisition for, and which, if any, has it paused or stopped property acquisition for?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA continues focused property acquisition for Roads of National Significance where the objective is to achieve or maintain construction readiness, support route protection, or complete approved pre-implementation activities. This…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the most recent completed business or investment case for each Road of National Significance, including its date and latest total cost estimate?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Belfast to Pegasus: Investment Case Nov 2024. Investment envelope (Nov 2024) $0.8-1 billion Mill Road Stage 1: Investment Case April 2025 Investment envelope (April 2025) $1.75-2.05 billion Tauriko West: Investment Case April 2025…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance, if any, have a completed business or investment case that has not been approved, or that has been approved but not funded for its next phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the total expenditure to date on planning, design, consenting, route protection, and property acquisition, excluding construction, for each Road of National Significance?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at (Question 170, pages 9-10): https://www3.parliament.nz/resource/en-NZ/54SCTIN_EVI_7003c45b-c90d-4b0e-f4e8-08dec1097c80_TIN11102/0be9cec219a9e9a3667d9f2fc515d9e0ca38abd8

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much has NZTA spent to date on planning, consenting, route protection, and property acquisition for those Roads of National Significance that have no construction start date in the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at (Question 170, pages 9-10): https://www3.parliament.nz/resource/en-NZ/54SCTIN_EVI_7003c45b-c90d-4b0e-f4e8-08dec1097c80_TIN11102/0be9cec219a9e9a3667d9f2fc515d9e0ca38abd8

Corrected reply

Question 33496 (2026)

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Takitimu North Link Stage 1, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Corrected reply: I refer the Member to the attached document, which answers Written Questions 33496 (2026) to 33539 (2026), inclusive.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Ōtaki to North of Levin, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Hawke's Bay Expressway, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date;…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Northland Corridor – Warkworth to Te Hana, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH1 Cambridge to Piarere, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH29 Tauriko (Ōmanawa Bridge), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Penlink O Mahurangi, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date;…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH1 Papakura to Drury, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date;…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Waihoehoe Road (Drury Upgrade), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH58 Safety Improvements Stage 2, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH2 Melling Transport Improvements, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).