Written questions

Search written questions to Ministers and the replies they have received.

Showing 1601 to 1650 of 1985 written questions.

Awaiting reply
Question published

39726 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What proportion of each approved organisation's total land transport expenditure was met from the National Land Transport Fund during the 2024-27 National Land Transport Programme, broken down by organisation and by financial year?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39725 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has been made of the increase, if any, in rates a council would need to levy in order to maintain its planned local road maintenance and renewal programme unchanged after its New Zealand Transport Agency normal…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39724 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How many councils or other approved organisations, if any, have advised the New Zealand Transport Agency or the Ministry of Transport that they intend to reduce, defer or reprioritise planned road maintenance, renewal or bridge work…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39723 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What funding assistance rate for public transport services has the New Zealand Transport Agency set for each regional council and unitary authority, broken down by council and by each of the 2026/27, 2027/28, 2028/29 and 2029/30 financial…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39722 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What New Zealand Transport Agency funding assistance rate applies to total mobility services, being the subsidised transport scheme for people unable to use conventional public transport, broken down by approved organisation and by each…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39721 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has been made of the additional cost falling on regional councils and unitary authorities as a result of changes to New Zealand Transport Agency public transport funding assistance rates over the three years of the…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39720 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What New Zealand Transport Agency funding assistance rate applies to emergency works, being repairs to local roads damaged by storms, floods and other events, broken down by approved organisation and by each year of the 2027-30 National…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39719 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What amount, if any, has been paid from the National Land Transport Fund towards emergency works on local roads since 1 July 2023, broken down by approved organisation and by financial year?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39718 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What methodology did the New Zealand Transport Agency use to set normal funding assistance rates for the 2027-30 National Land Transport Programme, and in what respects, if any, does that methodology differ from the one used to set rates…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39717 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What role, if any, did the Minister have in the setting of New Zealand Transport Agency normal funding assistance rates for the 2027-30 National Land Transport Programme, and on what dates, if any, was the Minister consulted or informed…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39716 (2026). Tangi Utikere to the Minister of Local Government

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How many councils, if any, have advised the Minister or the Department of Internal Affairs that the reduction in the share of their land transport costs met by the New Zealand Transport Agency from 2027/28 will affect their ability to…

For answer by

Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

No reply has been published yet.

Awaiting reply
Question published

39715 (2026). Tangi Utikere to the Minister of Local Government

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What was the average rates increase set by each council for the 2026/27 financial year, broken down by council, and how does each compare with the level of the proposed cap on rates increases?

For answer by

Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

No reply has been published yet.

Awaiting reply
Question published

39714 (2026). Tangi Utikere to the Minister of Local Government

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has the Minister received of the change in the total amount of central government funding transferred to local authorities over the three years from 1 July 2027, across all portfolios and not only transport, broken…

For answer by

Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

No reply has been published yet.

Awaiting reply
Question published

39713 (2026). Mike Davidson to the Minister of Local Government

Asked by

Mike Davidson

List MP · Green Party

Question

What advice, reports or briefings, has the Minister or any member of his office had, if any, on the impact that removing water services from the rates calculation as a result of Local Water Done Well and/or Rates Capping legislation, will…

For answer by

Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

No reply has been published yet.

Answered
Question published
Reply lodged

39712 (2026). Mike Davidson to the Minister of Internal Affairs

Asked by

Mike Davidson

List MP · Green Party

Question

What advice, reports, briefings or correspondence has the Minister had, if any, on Fire and Emergency New Zealand's approach to work injury ACC claims and does she have confidence in FENZ senior leadership to address such claims…

Answered by

Brooke van Velden

Member for Tāmaki · ACT Party · Minister of Internal Affairs

Answer

In relation to individual ACC work injury claims, it would be difficult for me to make a judgement about how any particular claim has been handled, as I do not have access to the details of each case and it would not be appropriate for…

Awaiting reply
Question published

39711 (2026). Mike Davidson to the Minister of Local Government

Asked by

Mike Davidson

List MP · Green Party

Question

What advice, reports, briefings, aides memoire, or any other documents has the Minister or any member of their Office received, if any, during the week beginning 31 August 2026, by title and date?

For answer by

Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

No reply has been published yet.

Answered
Question published
Reply lodged

39710 (2026). Mike Davidson to the Minister of Internal Affairs

Asked by

Mike Davidson

List MP · Green Party

Question

What advice, reports, briefings, or any other documents has the Minister or any member of their Office received, if any, during the week beginning 31 August 2026, by title and date?

Answered by

Brooke van Velden

Member for Tāmaki · ACT Party · Minister of Internal Affairs

Answer

I am advised by officials from the Department of Internal Affairs that this information will soon be made publicly available. The Department proactively releases the titles of briefings provided to me. This information is available at the…

Awaiting reply
Question published

39709 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 34451 (2026), how much, if any, has the NZ Transport Agency spent to date on external professional services for the Northland Corridor programme as a whole, broken down by section (Warkworth to Te Hana; Te Hana to Port…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39708 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 66207 (2024), are external professional services costs for the corridor now recorded against individual sections; if so, from what date, and if not, what is the total programme-level spend on external professional services…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39707 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How much, if any, has the NZ Transport Agency spent on external professional services for the Northland Corridor programme in each financial year from 2023/24 to 2025/26, broken down by financial year and by section?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39706 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Are any external advisers engaged on the Northland Corridor programme remunerated on a success-fee, contingent or milestone basis; if so, which advisers, what milestones apply, and what is the total value of such fees paid or payable to…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39705 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the total value paid or payable to Arup, Tonkin & Taylor and Bureau Veritas, whether individually or through Tūtahi Joint Venture, for services in relation to any section of the Northland Corridor since 27 November 2023, broken…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39704 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Which ten external suppliers have been paid the most for consultancy, engineering, legal, financial or advisory services in relation to the Northland Corridor programme since 27 November 2023, and what is the total paid to each?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39703 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Which external advisers engaged by the NZ Transport Agency on the Warkworth to Te Hana public-private partnership are also engaged on the Te Hana to Whangārei sections of the Northland Corridor, if any, and what ringfencing arrangements of…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39702 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Is the $98 million in external professional services costs recorded in Reply 34451 (2026) included within the $3.649 billion net present value cost of the Warkworth to Te Hana project referred to in Reply 34979 (2026), or is it additional…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39701 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the total contract value and term of the independent reviewer contract awarded to Tūtahi Joint Venture for the Warkworth to Te Hana public-private partnership, and is that cost borne by the NZ Transport Agency, the Northway…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39700 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 34450 (2026), has the bid cost reimbursement for the two unsuccessful Warkworth to Te Hana bidders now been finalised; if so, what amount was paid to each and on what date, and if not, when is finalisation expected?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39699 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How much, if any, did the NZ Transport Agency pay external advisers to prepare the Public Sector Comparator and value-for-money assessment for the Warkworth to Te Hana public-private partnership, and which firms were engaged?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39698 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the NZ Transport Agency's forecast annual client-side cost of managing the Warkworth to Te Hana Project Agreement over the 25-year operational period referred to in Reply 34979 (2026), and how much of that cost is expected to be…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39697 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Of the $42.8 million in technical services recorded in Reply 34451 (2026), what proportion relates to geotechnical investigation data that has been provided to the Northway consortium, and did the consortium pay any amount for that data or…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39696 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How much, if any, has the NZ Transport Agency spent on external professional services for the Alternative to the Brynderwyn Hills, including preparation of the statutory approvals application referred to in Reply 34402 (2026), broken down…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39695 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What did the Northland Corridor investment case referred to in Reply 66207 (2024) cost to produce, broken down by NZ Transport Agency internal costs and external professional services, and which firms were engaged?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39694 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 34451 (2026), which recorded $27.7 million in legal services and advice for Warkworth to Te Hana, how much, if any, has the NZ Transport Agency spent on external legal services for the Te Hana to Port Marsden Highway and…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39693 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Further to Reply 34402 (2026), which advised that no decision has been made on a procurement model for the sections beyond Warkworth to Te Hana, how much, if any, has the NZ Transport Agency spent or committed on external commercial,…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39692 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How much does the NZ Transport Agency expect to spend on external professional services for the Te Hana to Port Marsden Highway and Port Marsden Highway to Whangārei sections in each of 2026/27 and 2027/28, if any, and what proportion of…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply
Question published

39691 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What amount, if any, has been spent on iReX-related wind-down activity since the settlement with Hyundai Mipo Dockyard was concluded in August 2025, and what did that expenditure relate to?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39690 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the total cost to the Crown of the cancellation and wind-down of Project iReX as at 30 June 2026, and does this figure differ from the $671 million reported by KiwiRail in August 2025; if so, why?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39689 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What was the total book value of materials, plant and equipment procured for Project iReX that were subsequently sold, scrapped or written off, and what amount, if any, was recovered through their sale?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39688 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What land, property, consents or design work, if any, was acquired or commissioned for Project iReX that is not being used in the current Cook Strait Ferry Replacement Programme, and what was the cost of each?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39687 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What has been the Interislander's total fleet maintenance expenditure in each of the 2022/23, 2023/24, 2024/25 and 2025/26 financial years?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39686 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What amount, if any, of expenditure on Project iReX has been capitalised into the current ferry replacement programme rather than written off, and what does that expenditure consist of?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39685 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the forecast Interislander fleet maintenance expenditure for each of the 2026/27, 2027/28 and 2028/29 financial years?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39684 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What was the total cost of the fleet life-extension programme recommended following the DNV assessment of the Interislander fleet, and how much of that has been spent to date?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39683 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What amount, if any, of Interislander maintenance expenditure since December 2023 would not have been required had the vessels ordered under Project iReX been delivered in 2025 and 2026 as originally scheduled?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39682 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What advice, if any, has the Minister received on the expected maintenance cost of the Interislander fleet in the event that the delivery of Kupe and Cook is delayed beyond 2029?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39681 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What has been the total cost of drydock and layby maintenance undertaken overseas for Interislander vessels since 1 January 2024, broken down by vessel and by location?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39680 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What is the annual cost of road-bridging rail freight across Cook Strait following the retirement of the Aratere, and how does this compare with the cost of carrying the same freight on a rail-enabled vessel?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39679 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What volume of rail freight, measured in net tonne kilometres or wagon equivalents, has been road-bridged across Cook Strait in each quarter since the Aratere was retired in August 2025?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39678 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has been made of the volume of freight that has permanently transferred from rail to road as a result of the loss of a rail-enabled Cook Strait vessel, and what is the estimated annual revenue impact on KiwiRail?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.

Awaiting reply
Question published

39677 (2026). Tangi Utikere to the Minister for Rail

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What assessment, if any, has been made of the additional heavy vehicle movements on State Highway 1 attributable to road-bridging of Cook Strait rail freight, and what is the estimated additional road maintenance cost?

For answer by

Winston Peters

List MP · NZ First · Minister for Rail

Answer

No reply has been published yet.