Skip to main content

Written questions

Search written questions to Ministers and the replies they have received.

Filters
Asked by Tangi Utikere · Member for Palmerston North · Labour Party
Minister All Ministers
Portfolio All portfolios
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 1051 to 1100 of 2089 written question sets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which prioritisation tables, rankings, or lists prepared for the Minister of Transport ahead of the July 2026 Major Transport Projects Pipeline, if any, were previously withheld or redacted in Official Information Act or proactive…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA has advised me that it has previously withheld information relating to the RoNS prioritisation work under section 9(2)(f)(iv) of the Official Information Act 1982.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What advice, if any, did the Minister of Transport receive from officials on prioritising transport capital investment in the period leading up to the release of the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA is currently reviewing the advice and supporting material that informed the development of the Major Transport Projects Pipeline with a view to proactive release. This process includes assessing documents for any information that may…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many Roads of National Significance are in each of Phase One, Phase Two, and Phase Three of the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to the RoNS components in the July 2026 Major Transport Projects Pipeline infographic at: https://www.nzta.govt.nz/assets/projects-and-consultations/major-projects/major-transport-projects-pipeline-infographic.pdf

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance in the July 2026 Major Transport Projects Pipeline, if any, were placed in a later phase than their benefit-cost ratio alone would indicate, and for what reason?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No Roads of National Significance projects were phased based on benefit-cost ratios alone. The phasing in the July 2026 Major Transport Projects Pipeline was informed by a range of factors, including each project's current phase and…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What weighting, if any, was given to benefit-cost ratios when assigning Roads of National Significance to each phase of the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

BCR was not used as a standalone determinant of project phasing, and no weighting was applied solely for assigning projects to phases within the July 2026 MTPP.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What specific criteria did NZTA use to assign each Road of National Significance to Phase One, Phase Two, or Phase Three in the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

RoNS were assigned to phases based on a combination of strategic fit, network need, economic efficiency, funding availability, and deliverability. Deliverability considerations included project readiness, key risks, market capacity,…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 6 July 2026, listed by agency, title and date received?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

The titles and dates of Transport briefings received from the Ministry of Cities, Environment, Regions and Transport are or will soon be proactively released here:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 6 July 2026, listed by agency, title and date received?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I regularly request and receive advice from officials on a range of matters. MCERT and NZTA publish monthly lists of titles of advice provided to me (refer to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 6 July 2026, listed by agency, title and date received?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for State Owned Enterprises

Answer

As I said in Written Parliamentary Questions 10889 (2025), 11147 (2025), 14770 (2025), 18421 (2025), 19559 (2025), 20746 (2025), 22412 (2025), 27507 (2025), 28436 (2025), 30419 (2025), 30991 (2025), 31535 (2025), 32421 (2025), 33193…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 6 July 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

7 July 2026, The Treasury, NZRC Land disposal July FY27 9 July 2026, KiwiRail, Fortnightly Report 25 June - 8 July 2026

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 6 July 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Racing

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 6 July 2026, listed by agency, title and date received?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

As the Minister of Local Government, I received the following advice, reports, briefings, aide memoires, or any other documents from the Ministry of Cities, Environment, Regions and Transport during the week beginning 6 July 2026 •…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 6 July 2026, by title and date?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 6 July 2026, by title and date?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I can advise that I took two papers through Cabinet during the week beginning 6 July 2026. It is not in the public interest to release the titles at this stage.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 6 July 2026, by title and date?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for State Owned Enterprises

Answer

As I said in Written Parliamentary Questions 11040 (2025), 11255 (2025), 14923 (2025), 18528 (2025), 19677 (2025), 20885 (2025), 22550 (2025), 27613 (2025), 28543 (2025), 30527 (2025), 31099 (2025), 31644 (2025), 32532 (2025), 33300…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 6 July 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 6 July 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Racing

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 6 July 2026, by title and date?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 29 June 2026, listed by agency, title and date received?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

The titles and dates of Transport briefings received from the Ministry of Cities, Environment, Regions and Transport are or will soon be proactively released here:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 29 June 2026, listed by agency, title and date received?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I regularly request and receive advice from officials on a range of matters. MoT and NZTA publish monthly lists of titles of advice provided to me (refer to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 29 June 2026, listed by agency, title and date received?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for State Owned Enterprises

Answer

As I said in Written Parliamentary Questions 10889 (2025), 11147 (2025), 14770 (2025), 18421 (2025), 19559 (2025), 20746 (2025), 22412 (2025), 27507 (2025), 28436 (2025), 30419 (2025), 30991 (2025), 31535 (2025), 32421 (2025), 33193…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 29 June 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

29 June 2026, KiwiRail and NZRC, 2027-2029 Statements of Corporate Intent and FY27 KiwiRail Business Plan 1 July 2026, The Treasury, KiwiRail Share Issue July FY27 1 July 2026, The Treasury, Ferry Holdings – Key Decisions 2026 1 July 2026,…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 29 June 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Racing

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 29 June 2026, listed by agency, title and date received?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

• 29/06/2026 - Title withheld • 29/06/2026 - Talkin points for call with Mayor Mel Tavendale, Waitaki District Mayor • 30/06/2026 - Title withheld • 30/06/2026 - Meeting with the Commerce Commission, 1 July 2026 • 30/06/2026 - Regulatory…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 29 June 2026, by title and date?

Answered by

Hon James Meager

Member for Rangitata · National Party · Associate Minister of Transport

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 29 June 2026, by title and date?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As Minister of Transport, I can advise that I took no papers through Cabinet during the week beginning 29 June 2026.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 29 June 2026, by title and date?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for State Owned Enterprises

Answer

As I said in Written Parliamentary Questions 11040 (2025), 11255 (2025), 14923 (2025), 18528 (2025), 19677 (2025), 20885 (2025), 22550 (2025), 27613 (2025), 28543 (2025), 30527 (2025), 31099 (2025), 31644 (2025), 32532 (2025), 33300…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 29 June 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 29 June 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Racing

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 29 June 2026, by title and date?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 27647 (2026), does the Government dispute that specific figure, and if so, what is its own estimate?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Infrastructure Commission’s estimate was based on the best information available at the time, including assumptions about project scope, cost, and future investment. As advised in my response to Written Parliamentary Question 27643…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What are the principal risks currently identified to delivering the Cook Strait ferry replacement programme on time and on budget, if any, and what advice has the Minister received on the likelihood of the end-of-2029 in-service date being…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

To the extent that information can be disclosed, we have done so. All infrastructure projects carry risks associated to scope, cost, and timing. In this project, we have instituted a competent board and maintained tight control on scope.…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the latest programmed delivery and in-service date for each of the two new Cook Strait ferries?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information has not been announced. However, we have said both ferries will arrive in 2029 with the first arriving before the second.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does the Minister for Rail accept reporting that the Cook Strait ferry replacement programme is already materially over its approved budget, and what is the current variance against the budget allocated by Cabinet?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No, because that was “inaccurate and misleading” reporting by Andrea Vance in the Post. That quote is attributed to the Media Council, who found that report to be scurrilous, unsubstantial nonsense after an official complaint was laid. The…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total estimated cost of the Cook Strait ferry replacement programme, broken down by ships, Picton infrastructure, Wellington infrastructure, and programme management and contingency?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

$1.7 billion is the upper limit of costs to be met by the Government for assets the taxpayer will own. In November 2025 we released a breakdown as follows: • Ship contracts: $596 million • All Picton works: $531 million • All Wellington…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Will the Minister for Rail make public the Interim Development Agreements reached with Port Marlborough and CentrePort for the Cook Strait ferry replacement programme, and if not, why not?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

To the extent possible under the Official Information Act, yes. However, we will never release information that compromises the Government’s negotiating position as that would put at risk taxpayer dollars.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Have construction contracts been signed for the port-side infrastructure at Picton and Wellington required to berth the two new Cook Strait ferries, and if not, when are they expected to be signed?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Yes, for early contractor involvement and various demolition and design tasks. Main works contracts will be entered later this year, as planned.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has "Final Approval to Deliver" for the Cook Strait ferry replacement programme been granted, and if not, when is it expected and can construction of the vessels proceed before it is granted?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The Approval to Deliver process is currently underway and we will make announcements shortly. Please note the vessels are already under contract and construction is scheduled to start in 2027, after design works are completed which are…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What refund or refund-guarantee arrangements apply under the Cook Strait ferry shipbuilding contract if it is terminated before or during construction of the vessels, if any?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information was proactively released on 11 March 2026. Treasury advised that a Crown guarantee was deemed the most effective solution to secure the shipyard deal. A guarantee was provided and to the extent it is possible to release…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What payments have been made to Guangzhou Shipyard International under the Cook Strait ferry shipbuilding contract to date, and what is the milestone payment schedule for the remainder of the contract?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The first milestone payment was made on signing the contract in November 2025. The quantums of the remaining milestone payments have not been released, but they total to $596 million (subject to foreign exchange rates) under the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the programmed construction-start date for each of the two new Cook Strait ferries at Guangzhou Shipyard International?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Construction begins in 2027, after design is completed as is standard. Ships generally take 18-24 months to build, which gets us to 2029. Exact dates have not been released, except to say ships will be ready for service in 2029.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does the shipbuilding contract signed in November 2025 between Ferry Holdings Limited and Guangzhou Shipyard International contain any conditions precedent that must be satisfied before construction of the vessels can begin, and if so,…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Construction begins in 2027, after design is finalised which is well under way at present. We do wonder if the member recalls that, under iReX, Hyundai Mipo Dockyard had two years of design from signing in 2021 until vessel construction…

Corrected reply

Question 30354 (2026)

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has Ferry Holdings Limited issued a formal notice to proceed, or equivalent instruction, authorising Guangzhou Shipyard International to begin building the two new Cook Strait ferries, and if so, on what date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Corrected reply: Yes, as a fixed price contract was entered on 15 November 2025. We are aware of the "Cook Strait Gossip and Drama New Zealand" Facebook post you appear to have garnered your information from and suggest you do not believe…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has physical construction of either of the two new Cook Strait ferries commenced at Guangzhou Shipyard International, and if so, on what date did steel-cutting or keel-laying begin for each vessel?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No, and a simple search on Google would tell the member that construction is scheduled to start in 2027 after vessel design is completed.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 27653 (2026), how does increasing the Crown's capital contribution to take advantage of its "lower cost of capital" reconcile with the reply's stated aim of "retaining sufficient transfer of risk from the Crown to the PPP…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Capital Crown Contribution reduces the quantity of private finance in the project by replacing it with crown funding. However, the risk transfer to the consortium remains material which underpins the benefits of the PPP model.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 27647 (2026), if the estimates are "subject to ongoing work," when will that work conclude and will the Government publish its own projection of the project's share of Crown infrastructure spending to 2050?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

To clarify, the Government is not undertaking a separate projection of the Northland Corridor project’s share of Crown infrastructure spending to 2050. The ongoing work referred to in my previous answer relates to the final cost of the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 27653 (2026), on what basis does the Minister consider affordability "a completely separate question" from the level of Crown capital required to make private bids financeable?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Capital Crown Contributions (CCC) only makes up a portion of the total project costs during the construction phase. The total affordability of the project is tested through the Public Sector Comparator as set out in the Treasury PPP…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 27653 (2026), what was the quantum of the Capital Crown Contribution, and what proportion of the project's total capital did it represent?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

It would not be in the public interest to disclose the quantum of the Capital Crown Contribution for the Warkworth to Te Hana Public Private Partnership as it is commercially sensitive.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 27653 (2026), can the Minister confirm whether any bidder was unable to raise full private financing without the Capital Crown Contribution that the reply says "reduced the amount of private debt required by each bidder"?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No. It would not be in the public interest to disclose this information as it is commercially sensitive due to ongoing procurement and negotiation processes.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to reply 27653 (2026), what specifically was the "debt market capacity" constraint that prevented three consortia from each fully financing a bid for the Warkworth to Te Hana project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Debt market capacity constraint refers to the ability of the multiple consortia participating in the Request for Proposals (RFP) to secure full debt finance for each of their bids. Without securing this finance, the RFP process would not…