Skip to main content

Written questions

Search written questions to Ministers and the replies they have received.

Filters
Asked by All MPs
Minister All Ministers
Portfolio Energy
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 51 to 100 of 729 written question sets.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 27 July 2026, listed by agency, title and date received?

Answered by

Hon Shane Jones

List MP · NZ First · Associate Minister for Energy

Answer

A list of the briefings I have received from MBIE is proactively available on the MBIE website. You can access this information at https://www.mbie.govt.nz/about/open-government-and-official-information/release-of-information.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 27 July 2026, listed by agency, title and date received?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

A list of the briefings I have received from MBIE is proactively available on the MBIE website. You can access this information at https://www.mbie.govt.nz/about/open-government-and-official-information/release-of-information.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 27 July 2026, by title and date?

Answered by

Hon Shane Jones

List MP · NZ First · Associate Minister for Energy

Answer

With the exception of Cabinet Appointments and Honours (APH) papers and minutes, all Cabinet and Cabinet committee papers and minutes must be proactively released and published online within 30 business days of final decisions being taken…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 27 July 2026, by title and date?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

With the exception of Cabinet Appointments and Honours (APH) papers and minutes, all Cabinet and Cabinet committee papers and minutes must be proactively released and published online within 30 business days of final decisions being taken…

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What public engagement surveys, if any, are planned or currently underway regarding the use of artificial intelligence in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that neither the Energy Efficiency and Conservation Authority and the Electricity Authority have completed, nor do they have currently planned, any public engagement surveys specifically regarding the use of artificial…

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    How much, if any, has been spent in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, on consultants who advise on public sector reform management or similar, since 27…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that neither the Energy Efficiency and Conservation Authority nor the Electricity Authority have spent any money towards consultants for public sector reform.

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    How much, if any, is budgeted to be spent in the 2026/27 financial year in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, on consultants who advise on public sector…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that neither the Energy Efficiency and Conservation Authority nor the Electricity Authority have budgeted any money towards consultants for public sector reform.

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What public engagement surveys, if any, have been completed regarding the use of artificial intelligence in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, since 27…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that neither the Electricity Authority or the Energy Efficiency and Conservation Authority have completed public engagement surveys regarding the use of artificial intelligence.

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What automated approvals, if any, are currently operating within the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that neither the Electricity Authority or the Energy Efficiency and Conservation Authority have automated approvals processes.

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What procurement process, if any, was used for purchasing artificial intelligence tools, if any, currently being used within the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that the Electricity Authority follows its procurement and contract management policies, with the process tailored to value, risk and complexity and the Energy Efficiency and Conservation Authority follows the Government…

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What algorithm impact assessments, if any, have been done in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, since 27 November 2023?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that the Electricity Authority has completed AI Impact Assessments for two products, Subsense and LexisNexis+ AI and that the Energy Efficiency and Conservation Authority has undertaken no algorithm impact assessments since 27…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Does he believe it is in the public interest that data centres use new electricity generation?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I believe it is in the public interest for data centres to support additional investment in electricity generation and network infrastructure where this helps maintain a reliable and affordable electricity system.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Has he communicated with his colleagues about the energy demand of data centres in New Zealand, and if so, on what dates and what representations were made?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

As Minister for Energy, I regularly communicate with Coalition partners and Ministerial and Parliamentary colleagues, through various channels, including in-person conversations, phone calls, and discussions on portfolio matters at Cabinet…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    How much, if at all, could the Datagrid data centre affect power prices for other energy consumers once operational?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

My officials have not provided me with an estimate of the impact of individual data centre projects on electricity prices. Officials have advised me that projected data centre demand growth is not expected to put significant upward…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Has he requested or received information on how much of the processing capacity from the Datagrid data centre is expected to be used outside New Zealand?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

A list of the briefings I have received from MBIE is proactively available on the MBIE website. You can access this information at https://www.mbie.govt.nz/about/open-government-and-official-information/release-of-information.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Has he requested or received information on how much of the processing capacity from the Datagrid data centre is expected to be used in New Zealand?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

A list of the briefings I have received from MBIE is proactively available on the MBIE website. You can access this information at https://www.mbie.govt.nz/about/open-government-and-official-information/release-of-information.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Why will safety buffer zones around an LNG import facility at Port Taranaki be determined after the procurement process?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I understand that the determination of safety buffer zones will depend on the final design, equipment, operating procedures, and site-specific arrangements proposed by the preferred provider. Any LNG import facility will be required to…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What is the risk, if any, that an LNG import facility at Port Taranaki will affect public access to recreational spaces?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that any impact on public access to recreational spaces will depend on the final design and operational requirements of the selected LNG import facility. Having said that, I am advised that based on the assessments to date, it…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    How many businesses are located within a 2km radius of Port Taranaki?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I understand that the contents of the 2km radius of Port Taranaki is publicly available in a range of locations, you can access this information at https://www.google.com/maps

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    How many community centres, if any, are located within a 2km radius of Port Taranaki?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I understand that the contents of the 2km radius of Port Taranaki is publicly available in a range of locations, you can access this information at https://www.google.com/maps

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    How many houses are located within a 2km radius of Port Taranaki?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I understand that the contents of the 2km radius of Port Taranaki is publicly available in a range of locations, you can access this information at https://www.google.com/maps

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    How has a known potential worst case fatality distance of approximately 2km factored into the procurement process for an LNG import facility in Port Taranaki?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised Health and safety requirements have been incorporated into the procurement process to the extent reasonable for such a process. As the procurement process remains under way I am unable to comment further. Any LNG import…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Is he considering back up options if WorkSafe declines the Safety Case for the preferred provider for the LNG import facility, meaning it will not go ahead, and if so, what are these back up options?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that WorkSafe's assessment of any Safety Case will be an independent regulatory process. It would not be appropriate to speculate on the outcome of that process.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Why will detailed health and safety assessments only be carried out once the preferred provider for the LNG import facility is contracted?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I understand that detailed health and safety assessments depend on the final design, equipment, operating procedures, and site-specific arrangements proposed by the preferred provider. Any LNG import facility will be required to meet all…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Were buffer zones considered as part of the initial safety evaluations undertaken for both shortlisted proposals for the LNG import facility?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that the procurement process for an LNG import facility remains underway. Providing details around initial safety evaluations would prejudice the procurement process and the proponents' commercial positions.

Questions published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Questions

  • 33944 (matches this search)

    What was the scope of the initial safety evaluations undertaken for both shortlisted proposals for the LNG import facility?

  • 33945 (matches this search)

    Did the initial safety evaluations undertaken for both shortlisted proposals for the LNG import facility raise any issues of concern, and if so, what were they?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that the procurement process for an LNG import facility remains underway. Providing details around initial safety evaluations would prejudice the procurement process and the proponents' commercial positions.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What costs has the Crown incurred to date for the procurement process for the proposed LNG import facility, broken down by feasibility studies, technical advice, legal advice, and consultancy services?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that the following is a breakdown of costs for the LNG project from fiscal years 2024/25 and 2025/26, through to month end July 2026: • Technical advice: $1.34 million • Legal Advice: $0.43 million • Other consultancy…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    Did he or Cabinet consider a combination of options to provide dry year cover; if so, what combinations were considered?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

Cabinet and Cabinet committee papers and minutes are proactively released and published online within 30 business days of final decisions being taken by Cabinet, unless there is good reason not to publish all or part of the material, or to…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What evidence, if any, was used to determine that a distributed demand response as an investment option to provide dry year cover would have a scale of generation likely to be small?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I understand that MBIE considered the scale of back-up generation capacity among large-scale users. This suggested the likely capacity of the option would be well short of the scale required to provide sufficient dry-year cover, and there…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    When incentivising significant rooftop solar uptake across residential, commercial and industrial users was considered, but ruled out as an investment option to provide dry year cover, did this include a scenario of solar alongside battery…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that battery storage was considered as a separate standalone option. Dry year issues largely materialise in late autumn and winter months. Solar output is weakest during that time.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • (matches this search)

    Will the government prioritise developing “sensible rules” for data centres regarding electricity generation and grid stability so that investors have certainty before investing in New Zealand data centres, and if so, by when does the…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I understand that the government is considering whether any additional interventions are needed to ensure that the impacts of data centres on the electricity system are appropriately managed. No decisions have been made on additional…

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • (matches this search)

    Do officials expect the Datagrid data centre in Southland to put upward pressure on electricity prices, if so, by how much?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that current projections of data centre demand growth are not expected to put significant upward pressure on electricity prices over the next three years.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • (matches this search)

    Do officials expect any other data centres, besides the "maybe three" he referred to, to put upward pressure on electricity prices, if so, by how much?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that current projections of data centre demand growth are not expected to put significant upward pressure on electricity prices over the next three years.

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • (matches this search)

    Why do officials not expect any of the “maybe three data centres” to put upward pressure on electricity prices?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that data centres due to come online during 2026/27 are not expected to have a significant impact on electricity prices because projected growth in demand is expected to be accommodated within the current generation pipeline.…

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • (matches this search)

    What advice, if any, has he received to indicate that there will not be a significant impact on electricity prices from data centres?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that current projections of data centre demand growth are not expected to put significant upward pressure on electricity prices over the next three years. This reflects, in part, the Government's actions to address dry-year…

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • (matches this search)

    What are the three data centres that he said are due to ‘come on stream’ in the next 12 months?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that a small number of data centre projects are expected to become operational over the next 12 months. Information on data centres engaging with the national grid owner, Transpower, about connecting to its transmission…

Question published
Reply lodged

Asked by

Ricardo Menéndez March

List MP · Green Party

Question

  • (matches this search)

    How will the government ensure, if at all, that data centres “bring additionality to our energy system and electricity system”?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that the government is considering whether to set expectations, or new guardrails, to ensure the potential impacts of data centres on the electricity system are appropriately managed. These could include ensuring datacentres…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 19 July 2026, by title and date?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

With the exception of Cabinet Appointments and Honours (APH) papers and minutes, all Cabinet and Cabinet committee papers and minutes must be proactively released and published online within 30 business days of final decisions being taken…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 19 July 2026, by title and date?

Answered by

Hon Shane Jones

List MP · NZ First · Associate Minister for Energy

Answer

With the exception of Cabinet Appointments and Honours (APH) papers and minutes, all Cabinet and Cabinet committee papers and minutes must be proactively released and published online within 30 business days of final decisions being taken…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 19 July 2026, listed by agency, title and date received?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

A list of the briefings I have received from MBIE is proactively available on the MBIE website. You can access this information at https://www.mbie.govt.nz/about/open-government-and-official-information/release-of-information.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 19 July 2026, listed by agency, title and date received?

Answered by

Hon Shane Jones

List MP · NZ First · Associate Minister for Energy

Answer

A list of the briefings I have received from MBIE is proactively available on the MBIE website. You can access this information at https://www.mbie.govt.nz/about/open-government-and-official-information/release-of-information.

Question published
Reply lodged

Asked by

Scott Willis

List MP · Green Party

Question

  • (matches this search)

    Further to Reply 30365 (2026), what have the indicative risk appraisals carried out on the proposed LNG terminal in Taranaki showed?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that the procurement process for an LNG import facility remains underway. Providing the indicative risk appraisals prepared by proponents would prejudice the procurement process and the proponents' commercial positions.

Question published
Reply lodged

Asked by

Scott Willis

List MP · Green Party

Question

  • (matches this search)

    Further to Reply 30366 (2026), what have the indicative evaluations carried out on the proposed LNG terminal in Taranaki showed?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised that the procurement process for an LNG import facility remains underway. Providing the indicative risk appraisals prepared by proponents would prejudice the procurement process and the proponents' commercial positions.

Question published
Reply lodged

Asked by

Debbie Ngarewa-Packer

Member for Te Tai Hauāuru · Te Pāti Māori

Question

  • (matches this search)

    Does the Minister consider the discontinuation of Crown funding for Ara Ake to be consistent with the Government's objective of increasing energy affordability, resilience, and security; if so, why?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

Reprioritisation of Ara Ake’s funding reduces duplication with the Energy Efficiency and Conservation Authority and creates opportunities for more efficient use of resources to deliver Government objectives.

Question published
Reply lodged

Asked by

Debbie Ngarewa-Packer

Member for Te Tai Hauāuru · Te Pāti Māori

Question

  • (matches this search)

    How does the discontinuation of Crown funding for Ara Ake align with the Government's stated objectives for regional economic growth in Taranaki?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

The Government is focussed on ensuring an affordable and secure supply of energy, which is a key enabler of economic growth across New Zealand, including in Taranaki.

Question published
Reply lodged

Asked by

Debbie Ngarewa-Packer

Member for Te Tai Hauāuru · Te Pāti Māori

Question

  • (matches this search)

    What assessment, if any, was undertaken of the impact of discontinuing Crown funding for Ara Ake on New Zealand's renewable energy transition?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I am advised there will be minimal impact. The Government continues to support energy innovation, and other funding opportunities will remain in place, including through the reformed science system.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 6 July 2026, listed by agency, title and date received?

Answered by

Hon Shane Jones

List MP · NZ First · Associate Minister for Energy

Answer

A list of the briefings I have received from MBIE is proactively available on the MBIE website. You can access this information at https://www.mbie.govt.nz/about/open-government-and-official-information/release-of-information.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 6 July 2026, listed by agency, title and date received?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

A list of the briefings I have received from MBIE is proactively available on the MBIE website. You can access this information at https://www.mbie.govt.nz/about/open-government-and-official-information/release-of-information.

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 6 July 2026, by title and date?

Answered by

Hon Shane Jones

List MP · NZ First · Associate Minister for Energy

Answer

With the exception of Cabinet Appointments and Honours (APH) papers and minutes, all Cabinet and Cabinet committee papers and minutes must be proactively released and published online within 30 business days of final decisions being taken…

Question published
Reply lodged

Asked by

Megan Woods

Member for Wigram · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 6 July 2026, by title and date?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

With the exception of Cabinet Appointments and Honours (APH) papers and minutes, all Cabinet and Cabinet committee papers and minutes must be proactively released and published online within 30 business days of final decisions being taken…