Showing 551 to 600 of 1461 written question sets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on Takitimu North Link Stage 1, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Pre Implementation $0.96 million Implementation $134 million Property $4 million 2025/26 (as at 31 May 2026) Implementation $134 million Property $0.133 Million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to SH1 Cambridge to Piarere over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency expects to spend approximately $50,000 on public consultation and community engagement in relation to the Cambridge to Piarere extension of the Waikato Expressway over the remainder of the 2024-27 National Land…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on SH1 Cambridge to Piarere, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $0.076 million Pre Implementation $13.6 million Property $17 million 2025/26 (as at 31 May 2026) Investment Case $0.2 million Pre Implementation $20 million Implementation “Early Works” $1.3 million Property $85.3…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to Hamilton Southern Links over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency does not anticipate any spend on public consultation and community engagement in relation to Hamilton Southern Links over the remainder of the 2024-27 National Land Transport Programme period.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on Hamilton Southern Links, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $3.5 million Property $1.2 million 2025/26 (as at 31 May 2026) Investment Case $0.776 million Pre Implementation $3.8 million Property $3.2 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to Mill Road over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency does not anticipate any spend on public consultation and community engagement in relation to Mill Road Stage 1 over the remainder of the 2024-27 National Land Transport Programme period.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on Mill Road, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $4.5 million Pre Implementation $3 million Property $4.5 million 2025/26 (as at 31 May 2026) Investment Case $1.4 million Pre Implementation $24 million Property $43.4 million Please note, figures are inclusive of…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to the East-West Link over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Consultation/engagement activities over the remainder of the 2024-27 National Land Transport Programme period are currently being considered to align with project phasing in the Major Transport Projects Pipeline.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on the East-West Link, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Investment Case $3.9 million Pre Implementation $0.166 million 2025/26 (as at 31 May 2026) Investment Case $1.5 million Pre Implementation 2.9 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to the SH16 North-West Alternative State Highway over the remainder of the 2024-27 National Land Transport Programme…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZ Transport Agency does not anticipate any spend on public consultation and community engagement in relation to SH16 North-West Alternative State Highway over the remainder of the 2024-27 National Land Transport Programme period.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on the SH16 North-West Alternative State Highway, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Property $39.7 million 2025/26 (as of 31 May 2026) Property $33 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much, if any, does the NZ Transport Agency expect to spend on public consultation and community engagement in relation to the Northland Corridor over the remainder of the 2024-27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Consultation/engagement activities over the remainder of the 2024-27 National Land Transport Programme period are currently being considered to align with project phasing in the Major Transport Projects Pipeline.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the NZ Transport Agency's total expenditure to date on the Northland Corridor, if any, broken down by financial year and by project phase?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

2024/25 Programme Management $14.7 million Investment Case $6.8 million Pre Implementation $50 million Property $22.5m 2025/26 (as at 31 May 2026) Programme Management $5.5 million Pre Implementation $101.5 million Property $107.8 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is main construction of Hamilton Southern Links, expected to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Public consultation is not a discrete cost category and occurs throughout the project development lifecycle. Costs occur across investment case, property, pre-implementation and implementation phases.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What distinguishes placing a project in Phase Three ("continuing more slowly") of the July 2026 Major Transport Projects Pipeline from deferring that project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

A Phase Three project remains in the Major Transport Projects Pipeline and continues to be progressed in a managed way, with work sequenced to align with funding availability and delivery readiness.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has detailed design of Stage 1 (Galway Link) of the East West Link commenced, as signalled on 20 October 2025; if so, when is it expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Detailed design for the East West Link Stage 1 is not currently being progressed. This work will progress in the future subject to funding availability.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Of the $32 million announced on 20 October 2025 to progress design, consenting and procurement activities for Petone to Grenada and the Cross Valley Link, how much has been spent to date, and what procurement activities have been…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Procurement for the preparation of the notice of requirement and associated work was completed in January 2026. As at 30 April 2026, $14.8m has been spent on design and consenting activities for Petone to Grenada.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Why is the Cross Valley Link shown at feasibility/investment-case stage in the July 2026 Major Transport Projects Pipeline when its investment case was described alongside Petone to Grenada in the Government's 20 October 2025 announcement?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Cross Valley Link project is being progressed by Hutt City Council. It has an important network relationship with the Petone to Grenada (P2G) project but does not form part of the P2G scope.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When does the Minister of Transport expect an investment case for the Cross Valley Link to be completed, following the feasibility study shown as completed in the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Investment Case for the Cross Valley Link is being developed by Hutt City Council, and timelines for delivery are the responsibility of the Council.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What NZTA funding, if any, is committed to the Cross Valley Link?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No NZTA funding has been committed to this project to date.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What NZTA co-funding, if any, is committed to the Airport to Botany Busway Stages 3 and 4?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No NZTA co-funding commitment for Airport to Botany Busway Stages 3 and 4 has been made. It is expected this will be part of the prioritisation of funding through the upcoming Auckland Regional Land Transport Plan and 30 Year Plan.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When are route protection or main construction of the Airport to Botany Busway Stages 3 and 4, listed as a council-led project in Phase Three of the July 2026 Major Transport Projects Pipeline, expected to occur, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Route protection is already complete for stages 3 and 4. The 2021 Single Stage Business Case recommended staged delivery: the western section (Airport–Manukau via Puhinui) in the next decade, followed by the eastern section…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What NZTA co-funding, if any, is committed to the Auckland Level Crossings Removal (including Western Line) project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA has committed $4.8 million to the Level Crossing Safety Impact Assessment, $200 million for the Takanini and Glen Innes level crossing removals construction phase, and $8 million for the Western Line business case.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the expected timeframe for the Auckland Level Crossings Removal (including Western Line) project, listed as a council-led project in Phase Three of the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

For the Western Line, the business case is still being developed, with construction of 21 level crossing removal sites currently envisaged over the next two decades, subject to funding availability. Priority sites will be delivered first.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When does the Minister of Transport expect route protection for SH6 Hope Bypass Stage 2 to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Route protection will occur when funding becomes available; no timeframe has been set.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for SH6 Hope Bypass Stage 2?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The indicative investment envelope to design, consent and deliver Hope Bypass is $1.1–1.4 billion. Individual stage costs are not currently available due to commercial sensitivity and will be refined as construction timing is confirmed.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Why is SH6 Hope Bypass Stage 2 placed in Phase Three of the July 2026 Major Transport Projects Pipeline while SH6 Hope Bypass Stage 1 is placed in Phase Two?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As outlined in my press release of 9 July 2026, intersection improvements (stage 1) are being prioritised at Lower Queen Street. This will provide safety improvements for locals, while ensuring that further work on the project can continue…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current status of the Fast-track Approvals Act application for Petone to Grenada, if it remains a listed project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Petone to Grenada is not a listed project. NZTA has submitted a referral application seeking approval to use the Fast-track Approvals Act. NZTA is currently preparing a planning application to ensure this longer-term project is ready to…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Petone to Grenada project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The cost estimate is publicly available on page 25 of the Investment Case, which has been published on the NZTA website - https://nzta.govt.nz/assets/projects/petone-to-grenada/petone-to-grenada-investment-case-main-report.pdf

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When does the Minister of Transport expect main construction of Petone to Grenada to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No construction start date has been set.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What are the estimated peak travel-time savings for the Petone to Grenada project, and how many additional houses is it expected to support?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available on page 2 of the Investment Case, which is publicly available on the NZTA website - https://nzta.govt.nz/assets/projects/petone-to-grenada/petone-to-grenada-investment-case-main-report.pdf

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 31400 (matches this search)

    Why is Petone to Grenada placed in Phase Three of the July 2026 Major Transport Projects Pipeline when its investment case was endorsed in October 2025?

  • 31409 (matches this search)

    Why has the East-West Link been placed in Phase Three ("continuing more slowly") of the July 2026 Major Transport Projects Pipeline rather than an earlier phase, given its benefit-cost ratio?

  • 31415 (matches this search)

    Why are Sections 2 and 3 of the Northland Expressway (Te Hana to Whangārei) placed in Phase Three of the July 2026 Major Transport Projects Pipeline when they were among the investment cases endorsed and announced on 20 October 2025?

  • 31427 (matches this search)

    Why is the Northland Corridor Alternative to Brynderwyn Hills section placed in Phase Two of the July 2026 Major Transport Projects Pipeline while Sections 2 and 3 of the Northland Expressway are placed in Phase Three?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Phasing the RoNS programme allows us to balance investment across the wider network while ensuring projects are positioned to move forward when the timing is right and funding becomes available.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Mill Road Alfriston to Drury section?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

An investment case is currently in development for the Mill Road Alfriston to Drury project. A preferred option has not yet been selected and consequently there is no cost estimate available at this time.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When does the Minister of Transport expect main construction of the Mill Road Alfriston to Drury section to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The investment case for Alfriston to Dury is still in progress and no construction start date has been set. The focus is on positioning projects to move forward when funding is available.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When does the Minister of Transport expect route protection for the Mill Road Alfriston to Drury section (previously Stages 2 and 3), listed in Phase Three of the July 2026 Major Transport Projects Pipeline, to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The investment case for Alfriston to Dury is still in progress and no date has been set for commencing route protection.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What advice, if any, did the Minister of Transport receive on the economic cost of progressing the East-West Link more slowly?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA considered a range of risk factors when developing the investment case for the East West Link project, including exposure to construction cost inflation, as outlined in the publicly available Major Project Report:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the East-West Link?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at: https://nzta.govt.nz/assets/projects/east-west-link/Major-Project-Report-East-West-Link.pdf

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What funding, if any, is allocated to the East-West Link for activity beyond route protection in the 2024–27 National Land Transport Programme?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Following the NZTA Board's endorsement of the East-West Link investment case in August 2025, funding of $102 million was approved to progress consenting, route protection and some design. As has been widely publicised the National Land…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When does the Minister of Transport expect main construction of the East-West Link to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No construction start date has been set. The focus is on positioning projects to move forward when funding is available.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When was the investment case for the East-West Link endorsed by the NZTA board?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

August 2025

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the most recent benefit-cost ratio for the East-West Link?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at: https://nzta.govt.nz/assets/projects/east-west-link/east-west-link-investment-case-main-report.pdf

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What funding, if any, is allocated to the Te Hana to Whangārei sections of the Northland Corridor in the 2024–27 National Land Transport Programme beyond route protection?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Following the NZTA Board's endorsement of the Te Hana to Whangarei investment case in August 2025, funding of $187 million was approved to progress consenting, route protection and some design with priority given for an alternative to the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the most recent benefit-cost ratio for the Te Hana to Whangārei sections of the Northland Corridor?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at: https://www.nzta.govt.nz/assets/projects/northland-corridor/northland-corridor-section-2-and-3-investment-case-main-report.pdf

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Te Hana to Whangārei sections of the Northland Corridor?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at: https://www.nzta.govt.nz/assets/projects/northland-corridor/northland-corridor-investment-case-summary.pdf

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When does the Minister of Transport expect main construction of the Te Hana to Whangārei sections of the Northland Corridor to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No construction start date has been set.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Northwest Busway (Te Ara Hauāuru) Stage 3?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The NZTA Board-endorsed investment case provided cost ranges for Stages 1 and 2. NZTA is seeking statutory approvals for the full corridor, including Stage 3, but Stage 3 is not expected within the next 10 years and will need further…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is route protection for the Northwest Busway (Te Ara Hauāuru) Stage 3, listed in Phase Two of the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

In December 2025, NZTA lodged applications for statutory approvals for the project under the Fast-track Approvals Act. A decision from the Expert Panel is expected in September 2026.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Northwest Busway (Te Ara Hauāuru) Stages 1B and 2?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Stage 1B is estimated to cost between $252–$294 million and Stage 2 is estimated to cost $4.1–$4.6 billion. These estimates include allowance for escalation and administration and exclude costs for investment case and statutory consents…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is main construction of the Northwest Busway (Te Ara Hauāuru) Stages 1B and 2, listed in Phase Two of the July 2026 Major Transport Projects Pipeline, expected to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No construction start date has been set.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is main construction of the SH16 North-West Alternative Highway expected to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The project will be delivered in line with growth in the North West. No date has been set for the start of main construction.