Skip to main content

Written questions

Search written questions to Ministers and the replies they have received.

Filters
Asked by All MPs
Minister All Ministers
Portfolio Rail
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 401 to 450 of 457 written question sets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 2 March 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

4 March 2026 Treasury Report: KiwiRail Holdings Ltd and New Zealand Railways Corporation: Appointments and Reappointment. There is one other paper still under active consideration.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 2 March 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What advice since 1 July 2025, if any, has the Minister received regarding the Carbon Neutral Government Programme?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

None.

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    How many full time equivalent (FTE) roles, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, as of 1 January 2026?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail - 4557 Ferry Holdings - 14 (The figures have been rounded)

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    How many full time equivalent (FTE) roles, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, as of 1 January 2023?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail - 4762 (The figure has been rounded)

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    How many full time equivalent (FTE) roles, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, as of 1 January 2024?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail - 5029 (The figure has been rounded)

Questions published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Questions

  • 6555 (matches this search)

    How many vacancies, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, as of 1 January 2024?

  • 6557 (matches this search)

    How many vacancies, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, as of 1 January 2023?

  • 6869 (matches this search)

    How many vacancies, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, as of 1 January 2025?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail vacancy information for this time period is unavailable due to system limitations impacting data accuracy.

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    How many full time equivalent (FTE) roles, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, as of 1 January 2025?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail - 4740 (The figure has been rounded)

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    How many vacancies, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, as of 1 January 2026?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail vacancy information for this period is unavailable due to system limitations impacting data accuracy. Ferry Holdings: None.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 23 February 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 23 February 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

27 February 2026 KiwiRail Half Year Report 2026 27 February 2026 New Zealand Railways Corporation Half Yearly Report.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Has he received any advice that KiwiRail is considering restructures, contractor reductions, or changes to maintenance delivery models as part of meeting the $200 million budget cut, if so, what documents or briefings did he receive on…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No, KiwiRail is a State-Owned Enterprise and decisions regarding staffing levels are operational in nature. We expect KiwiRail to inform us of restructures prior to their occurrence and to set out a rationale. This includes demonstrating…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How does the $200m cut to KiwiRail's budget align with the Government’s stated productivity and regional development objectives, given the documented risk of freight moving from rail to road?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We have not cut the railways budget. We approved a $1.3 billion second network maintenance and renewal plan commensurate with the first. We challenged KiwiRail to improve its network efficiency as we have funded the procurement of new…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many direct and indirect jobs (including contractors and supply chains) are expected to be lost nationally, if any, as a result of the funding decision to reduce rail network funding by $200 million?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The $1.3 billion investment in 2024 – 27 Rail Network Investment Programme (RNIP) is commensurate with the level of investment in the previous RNIP. There are significant resourcing changes planned specifically related to the RNIP savings.…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    By how much will average train speeds on the main trunk and regional freight lines decrease with KiwiSaver's budget cuts of $200 million, if at all, and what productivity loss (in tonne-kilometres) does this represent?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Temporary speed restrictions are used internationally as a way to keep trains running safely, when track faults are discovered. They are constantly being applied to small parts of the network and lifted once the issue has been repaired.…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What assurances can he give contractors and regional workforces that the $200m cut to KiwiRail's budget will not permanently hollow out New Zealand’s rail maintenance capability, and what concrete measures are being taken to retain skilled…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We make no apologies for having bothered to fix the rail system after decades of mismanagement and malaise, and the taxpayers' investment is now paying off. The assurance is not a matter of Ministerial comment but is instead demonstrated…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is KiwiRail’s current maintenance backlog (in dollar value and kilometres of track), and how much larger that backlog is forecast to become by 2029 with KiwiRail's budget cuts of $200 million?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail advises it has no maintenance backlog. The company is delivering its Rail Network Investment Programme as it recommended and is operating a safe rail service on those assets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What analysis has been done comparing the short-term fiscal savings from rail cuts with the increased cost to Waka Kotahi for road damage caused by heavier freight traffic shifting from rail to trucks, if any?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

There is an assumption that this change to RNIP funding will cause freight to move from rail to road. It is not clear this is the case, noting KiwiRail's freight volumes have increased in the recent half-year period by 7 per cent while the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What assessment, if any, has been made of the impact on regional economies where rail maintenance work is reduced or withdrawn, including Southland, the West Coast, and lower North Island corridors?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Investment continues to flow to assets based on condition and service demand, all of which are present in Southland, the West Coast and the lower North Island corridors. Much of the Ohai Line has been mothballed as the cost to reinstate…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much additional funding will be required in later budgets to reverse “managed decline” on regional lines, if any, and has this future liability been provisioned for in current fiscal forecasts?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

It is impossible to make assessments based on an unattributed quote that has no bearing on our record-level rail network investments.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the estimated increase in future capital spend required to restore KiwiRail’s network after three years of constrained investment, compared with maintaining the originally preferred $6–7 billion programme?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail's 10-year forecast is outlined in the 2024-27 RNIP (p.57-59): www.kiwirail.co.nz/our-network/funding-our-network/rail-network-investment-programme/

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What advice, if any, did Treasury provide on the whole-of-system economic impact of reduced rail reliability, including increased road congestion, road maintenance costs, emissions, and freight inefficiency?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The question assumes that rail reliability will reduce. This is not proven.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much fiscal saving, by year, does the Government expect to achieve from the $200 million reduction in rail network funding, and how does this compare with the projected long-term increase in asset replacement costs caused by deferred…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The total spending is on par with the first Rail Network Investment Programme at approximately $1.3 billion over three years. We did not 'reduce' network spending, we requested KiwiRail deliver better efficiency in its spending by…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many contractor roles or FTE equivalents did KiwiRail forecast would be lost, reduced, or not renewed as a result of the $200 million budget cut, and what assurance did KiwiRail give him that these workforce impacts would not…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

There are no significant resourcing changes planned specifically related to the RNIP savings. Safety and compliance of all rail lines are a key performance measure in 2024 - 27 RNIP (see p10):…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much additional inspection and temporary repair work is being substituted for full renewals, if any, and what is the net cost difference between this approach and completing planned renewals on schedule?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This level of detail cannot be provided in the timeframe available to answer a Written Parliamentary Question. If the member wishes to obtain this information, they should request the information directly from KiwiRail.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What modelling has been done on freight diversion from rail to road caused by declining network reliability, if any, and how many additional heavy truck movements per year are expected as a result?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The Government has made significant investments to raise the standard of the national rail network and, as KiwiRail's recent Half year report shows, more goods are now going on rail than last year (net tonne kilometres up 7 per cent).…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many bridges, level crossings, and track segments will have renewals deferred beyond their design life because of KiwiRail’s budget cut, and what is the associated increase in safety risk quantified by KiwiRail?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This level of detail cannot be provided in the timeframe available to answer a Written Parliamentary Question. If the member wishes to obtain this information, they should request the information directly from KiwiRail.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What specific speed restrictions, axle-load limits, or service frequency reductions are forecast to be introduced over the next three years as a result of KiwiRail’s deferred renewals, if any, and on which corridors?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail will manage any deferred renewals through increased inspections and maintenance. There are no planned axle-load decreases. KiwiRail has forecast measures for temporary speed restrictions on priority and secondary routes in the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which rail lines or sections of line are now classified as being in “managed decline”, and what objective engineering criteria were used to place each line into that category?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No rail lines are classified as being in "managed decline". In fact, the Minister for State Owned Enterprises during the 2017-2020 and the Minister for Rial today have enabled the Government to invest significantly in rail lines that were…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many contractor roles (FTE equivalents), broken down by region and work type (track, bridges, signalling, structures), if any, are expected to be lost or not renewed as a direct result of the $200 million funding reduction for KiwiRail?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This level of detail cannot be provided in the timeframe available to answer a Written Parliamentary Question. If the member wishes to obtain this information, they should request the information directly from KiwiRail.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much money, in dollar terms and by financial year, is being removed from KiwiRail’s rail network budget over the next three years, and what proportion of this reduction falls specifically on track renewals and routine maintenance?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The vast majority of funding for the rail network is for asset maintenance and renewals. Indeed, the total level of investment is $1.3 billion over the current three year RNIP while the next three-year RNIP is scheduled to be presented,…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What specific assurances was he provided, if any, that KiwiRail’s transition to reduced funding would run smoothly, including any quantified targets for maintenance backlogs, asset condition, or service performance, and which of those…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

"The 2024 – 27 RNIP outlines the key targets and performance measures for the network (p50 - 52): www.kiwirail.co.nz/our-network/funding-our-network/rail-network-investment-programme/"

Corrected reply

Question 5787 (2026)

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 16 February 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Corrected reply: 19 February 2026 KiwiRail Fortnightly Report 5-18 February 2026 20 February 2026 Ministry of Transport Briefing: Approval of a Multi-year share subscription agreement with KiwiRail Holdings Limited (KiwiRail) and…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 16 February 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    What is the current level of compliance, if any, within the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, with NZ Government Web Standards, which require public sector…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The New Zealand Government Web Standards apply to public service departments and non-public service departments in the Executive branch. This is outlined on the digital.govt.nz website here:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 9 February 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

11 February 2026 Kiwi Rail Quarter 2 FY26 Performance Report.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 9 February 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 2 February 2026, listed by agency, title and date received?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

3 February 2026 Ferry Holdings Limited Quarterly Report October to December 2026 5 February 2026 KiwiRail Fortnightly Report December 2025 - 4 February 2026

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the week beginning 2 February 2026, by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Questions published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Questions

  • 4830 (matches this search)

    How much, if any, did the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, spend fixing database security breaches in the 2023 calendar year?

  • 4836 (matches this search)

    How much, if any, did the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, spend fixing database security breaches in the 2022 calendar year?

  • 4844 (matches this search)

    How much, if any, did the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, spend fixing database security breaches in the 2024 calendar year?

  • 4845 (matches this search)

    How much, if any, did the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, spend fixing database security breaches in the 2025 calendar year?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is not information held by a shareholding minister, as the entities for which we are responsible are operationally independent. The information can be requested directly from the entities the Minister is responsible for.

Question published
Reply lodged

Asked by

Camilla Belich

List MP · Labour Party

Question

  • (matches this search)

    Has the Minister or their staff had any discussions with any officials who planned to charge for replying to Official Information Act requests and if so, what advice, if any, did they provide those officials?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

As no responses to Official Information Act requests placed with the Minister for Rail have been charged, no and none. To the extent that companies for which we are shareholders might have determined a charge is necessary, that is an…

Question published
Reply lodged

Asked by

Camilla Belich

List MP · Labour Party

Question

  • (matches this search)

    In what circumstances would it be appropriate to charge for replying to Official Information Act requests made to their office, or agencies for which the Minister is responsible?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to section 15 of the Official Information Act and to relevant guidance from the Ombudsman.

Question published
Reply lodged

Asked by

Camilla Belich

List MP · Labour Party

Question

  • (matches this search)

    On how many occasions, if any, during the 2025 calendar year did each agency for which the Minister has responsibility suggest to a requestor that a fee would be charged for providing information requested under the Official Information…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail has suggested the need to apply a charge for an Official Information Act request three times in the 2025 calendar year. Once in January, once in April and once in November. In all instances it was suggested that a charge would be…

Question published
Reply lodged

Asked by

Camilla Belich

List MP · Labour Party

Question

  • (matches this search)

    On how many occasions, if any, during the 2025 calendar year did each agency for which the Minister has responsibility charge someone for providing information under the Official Information Act and for each instance what was the amount…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail and Ferry Holdings Limited have not charged any requestor for information in the 2025 calendar year.

Question published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Question

  • (matches this search)

    How many graduate positions, if any, were there in the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, between November 2024 and November 2025?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

KiwiRail has a graduate programme with placements in rolling stock engineering, infrastructure engineering, commercial freight and other roles to grow young talent for the rail sector. This is in addition to apprenticeship programmes which…

Questions published
Reply lodged

Asked by

Francisco Hernandez

List MP · Green Party

Questions

  • 3381 (matches this search)

    How much, if any, did the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, spend on the carbon neutral government programme in the 2025 calendar year?

  • 3385 (matches this search)

    How much, if any, have the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, budgeted for the carbon neutral government programme for the 2026 calendar year?

  • 3386 (matches this search)

    How much, if any, did the Minister’s departments, agencies, crown entities and any other bodies that the Minister is responsible for, if any, budget for the carbon neutral government programme in the 2025 calendar year?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is not information held by a shareholding minister, as the entities for which we are responsible for are operationally independent. The information requested would require substantial collation to respond within the standard timeframe…

Questions published
Reply lodged

Asked by

Camilla Belich

List MP · Labour Party

Questions

Matching question numbers: 2390 (2026), 2391 (2026), 2754 (2026), 2757 (2026), 2759 (2026), 2761 (2026), 2764 (2026), 2765 (2026), 3107 (2026), 3109 (2026), 3110 (2026), 3111 (2026)

  • 2386 (matches this search)

    How many cases of workplace bullying were referred to external investigators, mediators, the Employment Relations Authority, or other external bodies in each calendar year since 2015 in relation to any staff, employees, secondees,…

  • 2387 (matches this search)

    How many cases of workplace bullying resulted in financial settlements, compensation payments, or ex gratia payments in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders for whom…

  • 2388 (matches this search)

    How many individuals were dismissed, required to resign, or had their engagement terminated following findings of workplace bullying in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office…

  • 2389 (matches this search)

    What was the total value of financial settlements, compensation payments, or ex gratia payments relating to workplace bullying in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders…

Show the remaining 12 questions
  • 2390 (matches this search)

    How many individuals received formal disciplinary sanctions short of dismissal or termination following findings of workplace bullying in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office…

  • 2391 (matches this search)

    What employment or engagement outcomes resulted from recorded incidences of workplace bullying in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders for whom the Minister has…

  • 2754 (matches this search)

    How many individuals received formal disciplinary sanctions short of dismissal or termination following findings of sexual harassment in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office…

  • 2757 (matches this search)

    How many cases of sexual harassment were referred to external investigators, mediators, the Police, or other external authorities in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office…

  • 2759 (matches this search)

    How many recorded incidences of workplace bullying, if any, have occurred in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders for whom the Minister has responsibility in…

  • 2761 (matches this search)

    How many cases of sexual harassment resulted in financial settlements, compensation payments, or ex gratia payments in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders for whom…

  • 2764 (matches this search)

    What was the total value of financial settlements, compensation payments, or ex gratia payments relating to sexual harassment in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders…

  • 2765 (matches this search)

    What categories of workplace bullying allegations have been recorded in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders for whom the Minister has responsibility in connection…

  • 3107 (matches this search)

    What categories of sexual harassment allegations have been recorded in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders for whom the Minister has responsibility in connection with…

  • 3109 (matches this search)

    What employment or engagement outcomes resulted from recorded incidences of sexual harassment in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders for whom the Minister has…

  • 3110 (matches this search)

    How many recorded incidences of sexual harassment, if any, have occurred in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office holders for whom the Minister has responsibility in connection…

  • 3111 (matches this search)

    How many individuals were dismissed, required to resign, or had their engagement terminated following findings of sexual harassment in each calendar year since 2015 in relation to any staff, employees, secondees, contractors, or office…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is not information held by a shareholding minister, as the entities for which we are responsible are operationally independent. We note however that these entities are expected to be good employers as a matter of law. The information…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the period between 22 December 2025 and 1 February 2026 (inclusive), listed by agency, title and date…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

14 January 2026 Treasury Report KiwiRail Holdings Ltd and New Zealand Railways Corporation: Commencement of 2026 Appointment Round (updated)

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What papers, if any, did the Minister take to Cabinet during the period between 22 December 2025 and 1 February 2026 (inclusive), by title and date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to the response to WPQ 6251 (2025).

Question published
Reply lodged

Asked by

Celia Wade-Brown

List MP · Green Party

Question

  • (matches this search)

    How many fatalities, if any, has there been at each unsignalled public railway crossing in the last fifteen years, listed by site and number of fatalities?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This request is for detailed operational information that is not able to be collated within the timeframe of responding to the written parliamentary question and is not currently held by the Minister for Rail. If you wish to receive this…