Showing 2751 to 2800 of 31958 written question sets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), has Cabinet or any Minister approved, directed, or endorsed any departure by Ferry Holdings Ltd from open competitive procurement, or directed that any procurement be accelerated; if…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), how many consultants and contractors has Ferry Holdings Ltd engaged since 1 April 2025, at what total value, and how many of those engagements were openly advertised; if he does not…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The information the member requests is currently under consideration for release by Ferry Holdings under an Official Information Act request from the Labour Research Unit (OIA2026-005 refers).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), is Ferry Holdings Ltd's procurement covered by New Zealand's government procurement commitments under any free trade agreement, and has he received any advice on whether its…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Not specifically, and no.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), how many procurements did Ferry Holdings Ltd undertake, and to what value, before it adopted a board-approved procurement policy; if he does not hold this information, will he request…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Ferry Holdings is in the process of finalising a board-approved procurement policy.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), does Ferry Holdings Ltd have a board-approved procurement policy; if so, on what date was it adopted, and does it state that the Government Procurement Rules are mandatory for Ferry…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

No, Ferry Holdings is in the process of finalising a procurement policy for Board approval. The draft policy states that Government Procurement Rules are mandatory.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), who within Ferry Holdings Ltd holds the delegated authority to approve an exemption from open advertising, and were any exemptions approved by a person other than the delegated…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The Chief Executive up to a limit of $100,000 and the Chair and Chief Executive up to a limit of $500,000, otherwise the Board if over that amount. There have been no exemption approvals from anyone other than the Chief Executive or the…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), has Ferry Holdings Ltd published an Annual Procurement Plan on the Government Electronic Tenders Service in each year since 1 April 2025, and how many contract award notices has it…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Refer to WPQ response 35237 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), was an exemption or opt-out from open advertising relied on for the closed tender process involving six shipyards that preceded the shipbuilding contract; if so, which rule, on what…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The Treasury recommended this process be followed on the basis that a closed tender process is standard in ship procurement. The Government made widely publicised statements about the process, resulting in very strong interest from…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), how many contracts has Ferry Holdings Ltd awarded since 1 April 2025 without open advertisement on the Government Electronic Tenders Service, and what is their total value; if he does…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

There have been 11 contracts awarded making up a combined total of: • AUD: 356,931 • SEK: 315,600 • NZD: 2,361,636

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), which rules of the Government Procurement Rules were relied on in taking decisions for exemptions, on how many occasions has each been relied on since 1 April 2025, and where in the…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Rule 12 was used. Valid exemptions from open advertising (Rule 12) are set out in Appendix 2 of the Rules, which sets out clear circumstances in which a procurement may be exempt from open advertising. Ferry Holdings have applied those…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Further to the reply to written question 37231 (2026), will he correct or amend that reply if the review identifies any instance of non-compliance with the Government Procurement Rules?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is a nonsense hypothetical question. We have been assured by the Ferry Holdings board that Ferry Holdings has followed the Government Procurement Rules including taking decisions for exemptions where a fair basis has been established,…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 37936 (matches this search)

    Further to the replies to written questions 35235 (2026) and 37231 (2026), how is he able to state that Ferry Holdings Ltd has followed the Government Procurement Rules while its review of procurement practices remains incomplete?

  • 37937 (matches this search)

    Further to the reply to written question 37231 (2026), what is the basis for the statement that Ferry Holdings Ltd has followed the Government Procurement Rules, and does it reflect his own conclusion, written advice he has received, or an…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

On the basis of an assurance from the Ferry Holdings Board. If the member thinks operational answers are given without checking the facts with the relevant entity then he has much to learn.

Question published
Reply lodged

Asked by

Scott Willis

List MP · Green Party

Question

  • (matches this search)

    What powers, if any, will the Minister draw on to ensure that the gentailers do not pass on the costs of the Liquefied Natural Gas import terminal to consumers?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

I note that decisions on retail electricity pricing are generally commercial matters for electricity retailers. The Government is working with gentailers on a fair funding model for the LNG import facility and expects the benefits of…

Question published
Reply lodged

Asked by

Scott Willis

List MP · Green Party

Question

  • (matches this search)

    Will the Minister still compel the gentailers to pay for Liquefied Natural Gas infrastructure even if they decline to participate in a fair funding model?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

The Government's position is that the electricity sector should be responsible for meeting the costs of the dry year cover it requires, rather than taxpayers. The Government is continuing to engage with gentailers on a fair funding model…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many further reviews of the social housing delivery pipeline, if any, has Kāinga Ora undertaken or commenced since the review completed on 19 June 2025, and when is each expected to conclude?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

I refer the Member to my response to WPQ 8729 (2026).

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many households were on the social housing register in each territorial authority in which one or more of the 212 cancelled projects was located, both as at 19 June 2025 and as at the latest date for which figures are available?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

I refer the Member to the Housing Dashboard published by the Ministry of Cities, Regions, Environment and Transport which contains the requested information.…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What advice, if any, did Kāinga Ora or the Ministry of Housing and Urban Development provide to Ministers on the effect of the cancelled projects on social housing supply and on the social housing register, and on what dates was that…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

I have not received any advice from either the former Ministry of Housing and Urban Development or Kāinga Ora regarding the effects of cancelled projects.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many households were on the social housing register nationally as at 19 June 2025 and as at the latest date for which figures are available?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

I refer the Member to the Housing Dashboard published by the Ministry of Cities, Regions, Environment and Transport which contains the requested information.…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What was the net change in the total number of homes owned or managed by Kāinga Ora between 30 June 2025 and the latest date for which figures are available?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

I refer the Member to the attachment.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the surplus land parcels sold have been purchased by, respectively, community housing providers, iwi or Māori entities, other Crown agencies or local authorities, and private purchasers, if any?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many homes have been consented on land sold by Kāinga Ora as surplus since 19 June 2025, if any, and how many of those are social or affordable homes?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that they do not hold this information.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many hectares of surplus vacant land are currently listed for sale or under negotiation, if any, and in which territorial authorities is that land located?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many hectares of vacant land does Kāinga Ora hold in total as at the latest date for which figures are available, and how does that compare to its total vacant land holdings as at 19 June 2025?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that it holds approximately 146 hectares of vacant land related to public housing nationally as at the end of June 2026. This compares to approximately 112 hectares in March 2025. The…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How much of the proceeds from surplus land sales has been reinvested in new housing and how much has been applied to debt reduction, given the statement of 19 June 2025 that proceeds would be used for one or the other?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that their annual budget sets out the approved housing delivery programme, including planned new social homes (through redevelopment or acquisition), property sales, lease expiries, and…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many hectares of the approximately 36 hectares of vacant land that Kāinga Ora announced on 19 June 2025 it intended to sell have been sold as at the latest date for which figures are available, if any?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that it has sold 12.1 hectares of vacant social housing land as at 30 June 2026 for the 2025/26 financial year.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How much, if any, was paid in contract termination fees, cancellation fees, demobilisation costs or settlement payments to contractors, consultants or design professionals as a result of the 212 projects determined not to proceed, as at…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that no contract termination fees, cancellation fees, demobilisation costs or settlement payments to contractors, consultants or design professionals were paid as a result of the 212 projects…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How much, if any, has Kāinga Ora written down since 30 June 2025 in relation to projects or land parcels covered by the June 2025 reviews, as at the latest date for which figures are available?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What is the breakdown by territorial authority of the final pipeline review write-down, given that the Kāinga Ora information sheet accompanying the 19 June 2025 announcement stated that a breakdown of the range by territorial authority…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What proportion of the pipeline review write-down consisted of, respectively, design and professional fees, resource consenting costs, geotechnical and site investigation costs, demolition costs, holding costs, and any other category of…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How much of the total write-down, if any, was not absorbed within Kāinga Ora's existing budget for the year ended 30 June 2025, and what was the resulting effect on the agency's reported surplus or deficit?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that the total final audited value of write-downs arising from the pipeline review in FY2024/25 was $184 million against an approved budget of $21 million, noting the original budget was set…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What was the final write-down figure for each of the eleven regions listed in the Pipeline Assessment register published on 19 June 2025, being Auckland (estimated $46m–$55m), Wellington ($45m–$54m), Central North Island ($11m–$13m),…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What was the final audited value of the component attributable to land that has fallen in value since Kāinga Ora purchased it, which was estimated on 19 June 2025 at approximately $40 million?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What was the final audited value of the component of that write-down attributable to capital already spent on housing projects that will not go ahead as originally planned, which was estimated on 19 June 2025 at between $150 million and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What was the final audited value of the one-off accounting write-downs arising from the delivery pipeline review and land holdings review announced on 19 June 2025, which were estimated at that time at between $190 million and $220…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

I refer the Member to my response to parliamentary question 37955 (2026).

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the 212 cancelled projects were located in Canterbury, where the register records that 33 of 48 assessed projects and 446 of 531 proposed homes were determined not to proceed, and what assessment, if any, was made of the effect…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that 33 projects were assessed as not proceeding in Canterbury. All 212 housing projects were not funded under the Public Housing Plan. Kāinga Ora – Homes and Communities advises me that Kāinga…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the 212 cancelled projects were located in Northland, where the register records that 40 of 46 assessed projects and 450 of 495 proposed homes were determined not to proceed, and what assessment, if any, was made of the effect…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that 40 projects were assessed as not proceeding in Northland. All 212 housing projects were not funded under the Public Housing Plan. Kāinga Ora – Homes and Communities advises me that Kāinga…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What is the current status of each of the five largest cancelled projects by number of homes, being Jordan Avenue and Mount Smart Road, Onehunga (186 homes); Rowlands Avenue and Waipuna Road, Mount Wellington (180 homes); Elm Street and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How much has Kāinga Ora incurred in holding costs on the sites of those 212 cancelled projects since 19 June 2025, if any, including rates, insurance, security, fencing, vegetation control and vandalism repair, and what is the total by…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many homes were demolished on the sites of those 212 cancelled projects prior to the decision not to proceed, if any, broken down by region?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

I refer the Member to the reply to written question 32141 (2025).

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the 212 cancelled projects had resource consent granted at the point the decision not to proceed was made, if any, and how many of those consents have since lapsed or been surrendered?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the 3,479 homes that the 212 cancelled projects would have delivered have since been consented or constructed on those same sites by any party, including Kāinga Ora, community housing providers, iwi or private developers, if…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that they do not hold this information.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the 212 "not proceeding" projects have been re-scoped or re-designed at a smaller or different scale and subsequently re-entered the pipeline, if any, and how many homes would each now deliver?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the 212 "not proceeding" sites have been retained by Kāinga Ora and remain vacant or undeveloped as at the latest date for which figures are available?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the sites associated with those 212 projects are currently listed for sale, if any, and what is the total land area involved?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the sites associated with the 212 projects have been sold as at the latest date for which figures are available, if any, and what were the gross proceeds from those sales?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the 212 social housing projects listed as "Not proceeding" in the Pipeline Assessment register of 19 June 2025 have since been reinstated to the delivery pipeline, if any, and what is the address, region and number of homes for…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the projects assessed as "Proceeding" are currently forecast to exceed their approved budget, if any, and what is the aggregate value of the forecast overrun?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    What was the estimated total capital cost of the projects assessed as "Proceeding" at the time of the June 2025 review, and what is the current forecast total capital cost of those same projects as at the latest date for which figures are…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    Why does the Pipeline Assessment register published on 19 June 2025 record 253 projects with an assessment result of "Proceeding" when the accompanying media statement of the same date stated that 254 projects were going ahead, and which…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

Kāinga Ora – Homes and Communities advises me that the difference of one project was the Arlington development. As stated by Kāinga Ora at the time, the Arlington development was still under review but has since been announced as…

Question published
Reply lodged

Asked by

Kieran McAnulty

List MP · Labour Party

Question

  • (matches this search)

    How many of the 79 projects recorded in the register as having an expected delivery of FY27 are currently assessed by Kāinga Ora as on track to be delivered by 30 June 2027, and how many, if any, are not?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Housing

Answer

To provide the information requested would take substantial effort and collation. In accordance with SR 210/6 I consider that the time, and hence the expense, of answering this question cannot be justified in this case.