Skip to main content

Written questions

Search written questions to Ministers and the replies they have received.

Filters
Asked by Tangi Utikere · Member for Palmerston North · Labour Party
Minister All Ministers
Portfolio All portfolios
Question published between

Dates refer to when the question was published, and are inclusive.

Showing 1001 to 1050 of 2089 written question sets.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current cost estimate for the SH76 Brougham Street improvements Package 2 (corridor)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

SH76 Brougham Street has an estimated project cost of $100–$152 million. A cost estimate for Package 2 is not yet available.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the SH76 Brougham Street improvements Package 2 (corridor), listed in the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The overall SH76 Brougham Street project is estimated to run to January 2030; no separate Package 2 completion date has been identified.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current cost estimate for the SH76 Brougham Street improvements Package 1 (bridge)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The SH76 Brougham Street bridge contract was awarded at $17.6 million.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the SH76 Brougham Street improvements Package 1 (bridge), listed in the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

SH76 Brougham Street improvements Package 1 is expected to be complete early 2027, as outlined in the project webpage: https://www.nzta.govt.nz/projects/sh76-brougham-street-upgrade

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current cost estimate for the SH1 Rolleston Access improvements Package 2 (flyover)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

SH1 Rolleston Access Improvements has an estimated cost of between $180 million and $200 million. Package 2 forms part of this cost.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the SH1 Rolleston Access improvements Package 2 (flyover), listed in the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Stage 2, including the flyover, is anticipated to start in October 2026 and be completed in late 2028.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current cost estimate for the SH1 Rolleston Access improvements Package 1 (roundabout)?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

SH1 Rolleston Access Improvements has an estimated cost of between $180 million and $200 million. Package 1 forms part of this cost.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the SH1 Rolleston Access improvements Package 1 (roundabout), listed in the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

A new roundabout and road alignment at the Dunns Crossing and Walkers Road intersection with SH1 is now fully opened. Full construction of the remaining parts of stage 1 of the project is expected to be completed by the end of 2026.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What funding, if any, is allocated to the SH75 Halswell Road improvements project in the 2024–27 National Land Transport Programme?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This project is Crown-funded and has no NLTP allocation.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the SH75 Halswell Road improvements project, listed in the July 2026 Major Transport Projects Pipeline, expected to begin and be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Construction started in early May 2024 and the project opened in mid-2026 as announced at: https://www.beehive.govt.nz/release/christchurch-sh75-improvements-complete

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What projects are included in the Queenstown Package listed in the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Queenstown Package includes Frankton works such as SH6/SH6A traffic signals, a bus hub extension, bus stops, cycle lanes, shared paths and a SH6/Howards Drive roundabout.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What funding is allocated to the Queenstown Package, and when is it expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Queenstown Package has been allocated $250 million funding and construction is expected to be completed in 2028.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the SH2 Melling Transport Improvements?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

$743 million has been allocated for construction of the Melling transport improvements.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is main construction of the SH2 Melling Transport Improvements (Melling Interchange), listed in the July 2026 Major Transport Projects Pipeline, expected to begin, if a date has been set?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Construction started in September 2025. Interchange and bridge construction will increase from 2026 and conclude in 2031.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What funding, if any, is allocated to the SH58 Safety Improvements Stage 2 project in the 2024–27 National Land Transport Programme?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This project is Crown-funded and has no NLTP allocation.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the SH58 Safety Improvements Stage 2 project, listed in the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The SH58 Safety Improvements Stage 2 project is expected to be completed in mid 2027.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What funding is allocated to the Waihoehoe Road (Drury Upgrade) project in the 2024–27 National Land Transport Programme?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This project is Crown funded and does not have any NLTF allocation.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the Waihoehoe Road (Drury Upgrade) project, listed in the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Waihoehoe Road upgrade project is expected to be completed in mid-2028.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the SH1 Papakura to Drury project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The SH1 Papakura to Drury total budget is $1.079B, including contingency.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Penlink (O Mahurangi) project, and how does it compare with the estimate at the start of construction?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

NZTA is reviewing the total cost estimate for Penlink, including the cost to complete, held risk, and contingency. An updated cost estimate is not yet available.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the SH1 Papakura to Drury project, listed in the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

SH1 Papakura to Drury is expected to be completed in August 2030.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the SH29 Tauriko (Ōmanawa Bridge) project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at: https://www.beehive.govt.nz/release/contract-awarded-deliver-%C5%8Dmanawa-bridge-sh29-tauriko-west-road-national-significance

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the Penlink (O Mahurangi) project, listed in Phase One of the July 2026 Major Transport Projects Pipeline, expected to open to traffic?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Penlink is scheduled to fully open in late 2029.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the SH29 Tauriko (Ōmanawa Bridge) project, listed in Phase One of the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

SH29 Ōmanawa Bridge is estimated to be completed in January 2027.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the SH1 Cambridge to Piarere project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The indicative investment envelope for implementation of Cambridge to Piarere is $1.9–2.2 billion.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When are Stage 1 and Stage 2 of the SH1 Cambridge to Piarere project, listed in Phase One of the July 2026 Major Transport Projects Pipeline, each expected to begin and be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Stage 1 is due to start in early 2027 and Stage 2 later in 2027. Construction is expected to take about five to six years.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Northland Corridor Warkworth to Te Hana stage?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The total cost estimate for the Northland Corridor Warkworth to Te Hana project is currently under commercial negotiation and cannot be released at this time.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is main construction of the Northland Corridor Warkworth to Te Hana stage, listed in Phase One of the July 2026 Major Transport Projects Pipeline, expected to begin and to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Detailed design and construction for Warkworth to Te Hana are expected to start by the end of 2026. Announcements on the expected completion date will be made after Financial Close.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Hawke's Bay Expressway?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at: https://nzta.govt.nz/assets/projects/sh2-hawkes-bay-expressway/hawkes-bay-expressway-investment-case-summary.pdf

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When did, or when will, main construction begin on the Hawke's Bay Expressway?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Construction began in November 2025 as announced at: https://www.beehive.govt.nz/release/first-sod-turned-hawke%E2%80%99s-bay-expressway

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for the Ōtaki to north of Levin project?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my response to Written Parliamentary Question 50237 (2025).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is the Ōtaki to north of Levin project, listed in Phase One of the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The new Ōtaki to north of Levin Road is expected to open to traffic before the end of 2029.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the current total cost estimate for Takitimu North Link Stage 1, and how does it compare with the estimate at the start of construction?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The current total cost estimate for Takitimu North Link Stage 1 is $884m. The 2021 estimate at the start of construction was approximately $655m. The majority of increased cost can be attributed to an 18-month archaeological delay.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    When is Takitimu North Link Stage 1, listed in Phase One of the July 2026 Major Transport Projects Pipeline, expected to be completed?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Takitimu North Link Stage 1 is due for completion in 2028.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Phase Two projects in the July 2026 Major Transport Projects Pipeline, if any, have main construction funding committed in the current 2024–27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No phase 2 projects have main construction funding committed in the current NLTP period.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    In the July 2026 Major Transport Projects Pipeline, what does the phrase "as funding becomes available" mean in practice for the expected construction timing of Mill Road (Stage One), the Northwest Busway (Stages 1B and 2), and the Hope…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The projects will progress when funding is available.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    For how many Roads of National Significance in the July 2026 Major Transport Projects Pipeline is route protection the only substantive activity funded in the current 2024–27 National Land Transport Programme period?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Only one project (the North West Alternate State Highway) has route protection as the only substantive activity funded in the current 2024–27 National Land Transport Programme

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What proportion of the National Land Transport Fund over the 2024–27 period is allocated to Roads of National Significance, compared with maintenance, renewals, and resilience?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Approximately 12% of the NLTF has been allocated to RoNS over the 2024-27 period

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    For each project in the July 2026 Major Transport Projects Pipeline whose progression is stated to be "subject to funding availability", what funding shortfall must be closed before main construction can begin?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The Major Transport Projects Pipeline does not identify a specific funding shortfall for individual projects.

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 31496 (matches this search)

    What advice, if any, has the Minister of Transport received on the level of fuel excise duty or road user charges required to fund the Roads of National Significance programme on its original schedule?

  • 31498 (matches this search)

    What is the total estimated capital cost of all 17 Roads of National Significance listed in the 2024 Government Policy Statement on land transport, at the most recent estimate?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As stated in my November 2025 speech to the Future Roads Conference, officials have advised that delivering the RoNS programme in full over the next 20 years would cost $56 billion. Funding this entirely from petrol tax and road user…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    By how much, if any, has the total estimated cost of the Roads of National Significance programme changed since the 2024 Government Policy Statement on land transport?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

A comparison cannot be made because the 2024 GPS on land transport did not identify costs for the RoNS programme. Since then, investment cases have been completed for all projects, identifying each project's scope and associated cost.

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 31499 (matches this search)

    Which of the 17 Roads of National Significance listed in the 2024 Government Policy Statement on Land Transport, if any, does the Minister of Transport expect to begin main construction in more than 10 years' time?

  • 31511 (matches this search)

    Which single road corridors are split across more than one phase in the July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Four are underway now with two more soon to start. Future projects depend on funding availability.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Of the 17 Roads of National Significance listed in the 2024 Government Policy Statement on land transport, how many does the Minister of Transport expect to have started main construction within 10 years of the Government taking office in…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I appreciate the member's belief the Government will still be in office in 10 years' time. I refer the member to my response to Written Parliamentary Question 31499.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Of the 17 Roads of National Significance listed in the 2024 Government Policy Statement on land transport, how many does the Minister of Transport expect to be under construction by the end of the current parliamentary term?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

As outlined in my press release of 9 July 2026, four projects are already under construction: the Ōtaki to north of Levin Road of National Significance, Hawke’s Bay Expressway, Takitimu North Link Stage 1, and SH29 Tauriko West (Ōmanawa…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How many Roads of National Significance does the Minister of Transport expect to be under construction by early 2027?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

In addition to the projects listed in my response to Written Parliamentary Question 31501 (2026), procurement is also underway for the Cambridge to Piarere project. Construction of Stage 1 is expected to commence in early 2027, bringing…

Questions published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Questions

  • 31503 (matches this search)

    Which projects in the July 2026 Major Transport Projects Pipeline, if any, have had funding reduced or removed compared with the 2024–27 National Land Transport Programme as adopted?

  • 31508 (matches this search)

    In what specific respects, if any, does the Minister of Transport consider the July 2026 Major Transport Projects Pipeline to provide greater certainty than the Government's position set out in October 2025?

  • 31516 (matches this search)

    When did NZTA begin developing the three-phase structure (Phase One, Phase Two, Phase Three) used in its July 2026 Major Transport Projects Pipeline?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

None. The 2024–27 National Land Transport Programme (NLTP) did not allocate funding to individual Roads of National Significance (RoNS) projects. As noted on page 9 of the adopted NLTP, all RoNS projects remained subject to future…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which projects, if any, have a later expected main construction start date in the July 2026 Major Transport Projects Pipeline than the Government indicated in October 2025?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No specific projects have been identified. Any differences between the July 2026 Major Transport Projects Pipeline and earlier Government communications reflect updated assessments of funding availability, project readiness, and programme…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Does he still expect designations for the remainder of the Northland Expressway corridor to be lodged under the Fast-track Approvals Act by late 2026, as stated in his 20 October 2025 release; if not, why not?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No. The Northland Corridor is a large, long-term programme and is being planned and delivered in stages. Route protection will occur for the Te Hana to Whangarei sections (excluding the Alternative to the Brynderwyn Hills) when funding…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    How much funding did the NZTA board approve for Roads of National Significance in the round of investment-case endorsements announced on 20 October 2025?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

This information is publicly available at: https://www.beehive.govt.nz/release/next-steps-roads-national-significance

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    Which Roads of National Significance described in the Government's 20 October 2025 announcement "Next steps for Roads of National Significance" as having endorsed investment cases are placed in Phase Three of the July 2026 Major Transport…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The projects with endorsed Investment Cases that have been included in Phase Three are the Northland Expressway Sections 2 and 3, East-West Link, Petone to Grenada, and SH6 Hope Bypass.