Written questions

Search written questions to Ministers and the replies they have received.

Showing 1001 to 1050 of 1916 written questions.

Awaiting reply Question 40257 (2026)
Question published

40257 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How much, if any, has been spent to date on programme management, administration, consultants and contractors for the urgent and after-hours healthcare programme?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40256 (2026)
Question published

40256 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How much, if any, has been spent to date on procurement processes for new or extended urgent care services?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40255 (2026)
Question published

40255 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What proportion, if any, of urgent and after-hours healthcare spending committed to in Budget 2025 to date has gone to services that are now operating, as opposed to services still in procurement or development?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40254 (2026)
Question published

40254 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What funding, if any, beyond the $164 million has been committed or sought for urgent and after-hours healthcare since Budget 2025, and from what source?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40253 (2026)
Question published

40253 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How much, if any, of the $164 million committed to urgent and after-hours healthcare in Budget 2025 is forecast to be spent in each of the remaining years of the appropriation?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40252 (2026)
Question published

40252 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Which emergency departments, if any, currently operate an ED diversion or redirection scheme to urgent care services, and from what date did each begin?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40251 (2026)
Question published

40251 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many patients, if any, have been offered diversion or redirection from an emergency department to an urgent care service in each of the past three years, broken down by emergency department?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40250 (2026)
Question published

40250 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many and what percentage, if any, of patients offered diversion or redirection from an emergency department accepted it in each of the past three years, broken down by emergency department?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40249 (2026)
Question published

40249 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What percentage, if any, of patients presenting to each emergency department were assessed as suitable for diversion or redirection to urgent care in the most recent 12 months?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40248 (2026)
Question published

40248 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the 2022 time and motion study referred to at paragraph 78 of New and improved urgent and after-hours healthcare (May 2025) been repeated or updated, if at all, and if so, what did it find?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40247 (2026)
Question published

40247 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What national target, if any, is there for the proportion of emergency department presentations diverted or redirected to urgent care services?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40246 (2026)
Question published

40246 (2026). Scott Willis to the Minister of Transport

Asked by

Scott Willis

List MP · Green Party

Question

He has requested or received advice on increasing electric vehicle uptake since March 27, if so, what was the substance of any advice?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 40245 (2026)
Question published

40245 (2026). Scott Willis to the Minister of Transport

Asked by

Scott Willis

List MP · Green Party

Question

What advice, briefings, reports or any other document, if any, has the Minister received on electric freight options for New Zealand, since March 27, 2026, listed by title and date?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 40244 (2026)
Question published

40244 (2026). Scott Willis to the Minister for Energy

Asked by

Scott Willis

List MP · Green Party

Question

What have industry stakeholders told him or the Ministry of Business, Innovation and Employment, in any engagements, about the price at which Liquefied Natural Gas would need to be set for industry users to afford it?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

No reply has been published yet.

Awaiting reply Question 40243 (2026)
Question published

40243 (2026). Scott Willis to the Minister for Energy

Asked by

Scott Willis

List MP · Green Party

Question

Is the Government considering subsidising the price of Liquefied Natural Gas (LNG) for industrial users who may not be able to afford to continue their operations at the price of delivered LNG?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister for Energy

Answer

No reply has been published yet.

Awaiting reply Question 40242 (2026)
Question published

40242 (2026). Scott Willis to the Minister of Finance

Asked by

Scott Willis

List MP · Green Party

Question

What is the total cost to Government of the delay in raising fuel excise tax schedule for 2027?

For answer by

Nicola Willis

List MP · National Party · Minister of Finance

Answer

No reply has been published yet.

Awaiting reply Question 40241 (2026)
Question published

40241 (2026). Lan Pham to the Minister for Land Information

Asked by

Lan Pham

List MP · Green Party

Question

Has Land Information New Zealand finished developing its "five‑year AMD [acid mine drainage] monitoring programme", which it "expected to commence in late 2026 and continue through to 2030", as noted in the document BRF 26-272…

For answer by

Mike Butterick

Member for Wairarapa · National Party · Minister for Land Information

Answer

No reply has been published yet.

Awaiting reply Question 40240 (2026)
Question published

40240 (2026). Scott Willis to the Minister of Finance

Asked by

Scott Willis

List MP · Green Party

Question

What is the total cost of the increased in-work tax credit as a result of the fuel crisis since it was introduced on April 1, 2026, and how does this compare with any projected or modelled costs prior to introduction?

For answer by

Nicola Willis

List MP · National Party · Minister of Finance

Answer

No reply has been published yet.

Awaiting reply Question 40239 (2026)
Question published

40239 (2026). Scott Willis to the Minister of Finance

Asked by

Scott Willis

List MP · Green Party

Question

How is the deferral of increases to the fuel excise tax a "targeted response"?

For answer by

Nicola Willis

List MP · National Party · Minister of Finance

Answer

No reply has been published yet.

Awaiting reply Question 40238 (2026)
Question published

40238 (2026). Hon Carmel Sepuloni to the Associate Minister of Health

Asked by

Carmel Sepuloni

Member for Kelston · Labour Party

Question

Further to her answers to written question 38441 (2026): was this not an internal review of the procurement process?

For answer by

Casey Costello

List MP · NZ First Party · Associate Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40237 (2026)
Question published

40237 (2026). Lan Pham to the Minister for Land Information

Asked by

Lan Pham

List MP · Green Party

Question

What stage is progress on the Stockton hydro development outlined in 'BRF 26-272 Aide-mémoire: Stockton Mine' at?

For answer by

Mike Butterick

Member for Wairarapa · National Party · Minister for Land Information

Answer

No reply has been published yet.

Awaiting reply Question 40236 (2026)
Question published

40236 (2026). Hon Carmel Sepuloni to the Associate Minister of Health

Asked by

Carmel Sepuloni

Member for Kelston · Labour Party

Question

Further to her answer to written question 38524 (2026): was The Post wrong when they reported on 2 September 2026 that an internal audit review by Health New Zealand of the procurement process had occurred?

For answer by

Casey Costello

List MP · NZ First Party · Associate Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40235 (2026)
Question published

40235 (2026). Hon Carmel Sepuloni to the Associate Minister of Health

Asked by

Carmel Sepuloni

Member for Kelston · Labour Party

Question

Further to her answers to written questions 38524 and 38441 (2026): how can she claim in her answer to 38524 that “no internal review into the awarding of Auckland home and community support contracts has been undertaken by Health New…

For answer by

Casey Costello

List MP · NZ First Party · Associate Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40234 (2026)
Question published

40234 (2026). Lan Pham to the Minister for Land Information

Asked by

Lan Pham

List MP · Green Party

Question

Has the Minister received the update "on progress achieved to date on the [Stockton] hydro development" from Buller Electricity Limited, which was proposed for June 2026?

For answer by

Mike Butterick

Member for Wairarapa · National Party · Minister for Land Information

Answer

No reply has been published yet.

Awaiting reply Question 40233 (2026)
Question published

40233 (2026). Hon Carmel Sepuloni to the Associate Minister of Health

Asked by

Carmel Sepuloni

Member for Kelston · Labour Party

Question

Further to her answers to written question 38441 (2026): what triggered this review?

For answer by

Casey Costello

List MP · NZ First Party · Associate Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40232 (2026)
Question published

40232 (2026). Lan Pham to the Minister for Land Information

Asked by

Lan Pham

List MP · Green Party

Question

What decisions, if any, have been made about the future of the proposed Stockton hydro scheme?

For answer by

Mike Butterick

Member for Wairarapa · National Party · Minister for Land Information

Answer

No reply has been published yet.

Awaiting reply Question 40231 (2026)
Question published

40231 (2026). Lan Pham to the Minister for Land Information

Asked by

Lan Pham

List MP · Green Party

Question

Has Land Information New Zealand refined "the concept design" and clarified the "costs, benefits, and risk allocation for the Crown" of the Stockton hydro scheme proposal, as per the intention stated at paragraph 12 of the document 'BRF…

For answer by

Mike Butterick

Member for Wairarapa · National Party · Minister for Land Information

Answer

No reply has been published yet.

Awaiting reply Question 40230 (2026)
Question published

40230 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

How many kilometres of local road, sealed and unsealed, is each approved organisation responsible for maintaining, and how many rating units are within each district, broken down by organisation and by road surface type?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 40229 (2026)
Question published

40229 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

Which roads, if any, are classified as special purpose roads, being roads that receive a New Zealand Transport Agency funding assistance rate set separately from the responsible council's normal rate, and what rate applies to each, broken…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 40228 (2026)
Question published

40228 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What decisions, if any, have been made about the New Zealand Transport Agency funding assistance rates that will apply to special purpose roads after 30 June 2030, and when does the Minister expect any remaining decisions to be made?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 40227 (2026)
Question published

40227 (2026). Tangi Utikere to the Minister of Transport

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

What estimate, if any, has been made of the additional cost to the responsible council of any reduction in the New Zealand Transport Agency funding assistance rate applying to a special purpose road over the 2027-30 National Land Transport…

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 40226 (2026)
Question published

40226 (2026). Mike Davidson to the Minister of Transport

Asked by

Mike Davidson

List MP · Green Party

Question

What advice, briefings, reports or correspondence has the Minister had, if any, on the roading maintenance and/or rates impacts of lowering the Financial Assistance Rate for Councils?

For answer by

Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

No reply has been published yet.

Awaiting reply Question 40225 (2026)
Question published

40225 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40224 (2026)
Question published

40224 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40223 (2026)
Question published

40223 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40222 (2026)
Question published

40222 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40221 (2026)
Question published

40221 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40220 (2026)
Question published

40220 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40219 (2026)
Question published

40219 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40218 (2026)
Question published

40218 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved,…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40217 (2026)
Question published

40217 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40216 (2026)
Question published

40216 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40215 (2026)
Question published

40215 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40214 (2026)
Question published

40214 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40213 (2026)
Question published

40213 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40212 (2026)
Question published

40212 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40211 (2026)
Question published

40211 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Wellington Regional Hospital ED Refurbishment - Enabling Works recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40210 (2026)
Question published

40210 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Wellington Regional Hospital ED Refurbishment - Enabling Works at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40209 (2026)
Question published

40209 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40208 (2026)
Question published

40208 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Wellington Regional Hospital ED Refurbishment - Enabling Works experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.