Ayesha Verrall

List MP · Labour Party

Question

  • Were any delays to Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Has Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What was the original projected completion date, or opening / go-live date, for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt at the time funding was first approved, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Does Wellington Regional Hospital ED Refurbishment - Enabling Works currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the current projected completion date, or opening / go-live date, for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • When was the Minister of Health last formally briefed or updated on the progress of Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • How many risks are currently open for Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the current overall RAG (Red/Amber/Green) status of Wellington Regional Hospital ED Refurbishment - Enabling Works, and what are the individual RAG ratings for schedule, budget, and scope, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • How is Wellington Regional Hospital ED Refurbishment - Enabling Works currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Is there any underspend currently recorded or forecast for Wellington Regional Hospital ED Refurbishment - Enabling Works, if so, what is the value of the underspend and what is the reason for it, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Has the approved budget for Wellington Regional Hospital ED Refurbishment - Enabling Works increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What was the original approved budget for Wellington Regional Hospital ED Refurbishment - Enabling Works at the time funding was first established, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • On what date was funding for Wellington Regional Hospital ED Refurbishment - Enabling Works first approved, and by which government or Cabinet decision was that funding approved, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the current total approved budget for Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Has Wellington Regional Hospital ED Refurbishment - Enabling Works experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the current projected completion date, or opening / go-live date, for Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What was the original projected completion date, or opening / go-live date, for Wellington Regional Hospital ED Refurbishment - Enabling Works at the time funding was first approved, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Were any delays to Wellington Regional Hospital ED Refurbishment - Enabling Works recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that the Member can find the latest publicly available information on Health New Zealand's website:…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Does Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • When was the Minister of Health last formally briefed or updated on the progress of Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the current overall RAG (Red/Amber/Green) status of Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, and what are the individual RAG ratings for schedule, budget, and scope, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • How many risks are currently open for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Is there any underspend currently recorded or forecast for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if so, what is the value of the underspend and what is the reason for it, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • How is Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Has the approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved,…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What was the original approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington at the time funding was first established, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • On what date was funding for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington first approved, and by which government or Cabinet decision was that funding approved, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the current total approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Were any delays to Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • Has Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being…

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What was the original projected completion date, or opening / go-live date, for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington at the time funding was first approved, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the current projected completion date, or opening / go-live date, for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I am advised that infrastructure updates are regularly published on Health New Zealand's website. Regarding the Member's question, I am further advised that the Member can find the latest publicly available information in these updates…

Question published
Reply lodged

Asked by

Mike Davidson

List MP · Green Party

Question

  • What advice, briefings, reports or correspondence has the Minister had, if any, on the roading maintenance and/or rates impacts of lowering the Financial Assistance Rate for Councils?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I have not received any advice, briefings or reports on the impacts that lowering Funding Assistance Rates (FARs) may have on councils' road maintenance programmes or rates. I have, however, received one item of correspondence from a…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What estimate, if any, has been made of the additional cost to the responsible council of any reduction in the New Zealand Transport Agency funding assistance rate applying to a special purpose road over the 2027-30 National Land Transport…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZ Transport Agency Waka Kotahi (NZTA) cannot provide estimates of the additional cost to the responsible council of a reduction in Funding Assistance Rate applying to a Special Purpose Road over the 2027-30 National Land…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What decisions, if any, have been made about the New Zealand Transport Agency funding assistance rates that will apply to special purpose roads after 30 June 2030, and when does the Minister expect any remaining decisions to be made?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I am advised that NZ Transport Agency Waka Kotahi (NZTA) has not made any decisions on funding assistance rates that will apply to special purpose roads after 30 June 2030. I would expect NZTA to make those decisions prior to 30 June 2030.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • Which roads, if any, are classified as special purpose roads, being roads that receive a New Zealand Transport Agency funding assistance rate set separately from the responsible council's normal rate, and what rate applies to each, broken…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

The information sought by the Member is publicly available at:…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • How many kilometres of local road, sealed and unsealed, is each approved organisation responsible for maintaining, and how many rating units are within each district, broken down by organisation and by road surface type?

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

"I am advised that information on the number of kilometres of local roads, including sealed and unsealed roads, maintained by each council road controlling authority (RCA) is reported to NZ Transport Agency Waka Kotahi by RCAs. This…

Questions published
See individual question dates
Reply lodged

Questions

  • Asked by

    Tangi Utikere

    Member for Palmerston North · Labour Party

    39387

    Question published

    What aides-mémoire, briefings, memos, notes, reports, or any other advice, if any, has the Minister or their Office received during the week beginning 31 August 2026, listed by agency, title and date received?

  • Asked by

    Lan Pham

    List MP · Green Party

    39637

    Question published

    What advice, reports, briefings, aide memoires, or any other documents has the Minister or any member of their office received, if any, during the week beginning 31/08/2026, by title and date?

  • Asked by

    Mike Davidson

    List MP · Green Party

    39711

    Question published

    What advice, reports, briefings, aides memoire, or any other documents has the Minister or any member of their Office received, if any, during the week beginning 31 August 2026, by title and date?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

As the Minister of Local Government, I received the following advice, reports, briefings, aide memoires, or any other documents from the Department of Internal Affairs during the week beginning 29 August 2026 • 31/08/2026- Meeting with…

Question published
Reply lodged

Asked by

Mike Davidson

List MP · Green Party

Question

  • How many people, if any, have written to the Minister with a complaint about non-elected members on Council committees, between January 1 2026 and June 2 2026, by month?

Answered by

Hon Simon Watts

Member for North Shore · National Party · Minister of Local Government

Answer

As Minister of Local Government, I receive a very large amount of correspondence. This correspondence is not categorised by the specific nature of any complaint, eg: unelected members. To answer the member's question, my office would need…

Question published
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the number of patients at Waikato Hospital’s Emergency Department recorded as 'Did Not Wait' broken down by month, from January 2026 to August 2026?

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

I refer the Member to the attached table.

Unanswered: Parliament dissolved

Question 39656 (2026)

Question published

Asked by

Ayesha Verrall

List MP · Labour Party

Question

  • What is the number of patients who spent longer than 24 hours at Waikato Hospital’s Emergency Department broken down by month, from January 2026 to August 2026?

No reply received

Parliament dissolved: no reply received

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What reports or advice, if any, does the Minister hold on the total economic cost to New Zealand of reduced Cook Strait ferry capacity between 2024 and 2029, and what estimate for the total sum did that contain?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

None. The Cook Strait ferries continue to serve demand.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What assessment, if any, has been made of the difference in freight and passenger capacity between the vessels ordered under Project iReX and the vessels Kupe and Cook, and what is the estimated effect on Cook Strait capacity over the…

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

Kupe and Cook will arrive in New Zealand thanks to the no-nonsense ferry replacement programme, while the iReX ferries will never arrive because the previous Government's actions meant their programme was on course to cost $4 billion and…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • How many Interislander staff positions, if any, were disestablished as a result of the transition from a three-ship to a two-ship fleet, and what was the total cost of redundancies paid?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

In late August 2025, we personally visited the Wellington Terminal to thank the Aratere crew following her final commercial service across the Cook Strait. Retaining the Aratere in service would have required at least $120 million in…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What has been the total expenditure on external consultants and advisors relating to Cook Strait ferry procurement since December 2023, across KiwiRail, Ferry Holdings, the Ministry of Transport and the Treasury?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This is not information held by the Minister for Rail, noting that this position was established on 11 December 2024. We will request the Treasury work with KiwiRail, Ferry Holdings and the Ministry of Transport to identify this number and…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What was the total cost of the Ministerial Advisory Group on Cook Strait ferry options, including fees, secretariat and any external advice it commissioned?

Answered by

Hon Nicola Willis

List MP · National Party · Minister of Finance

Answer

$1,054,816.63 excluding GST. It should be noted these costs include advice and expertise on a wide range of work streams relating to the replacement of ferries on Cook Strait such as the procurement of new ships, establishment of a new…

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What has been the total operating cost of Ferry Holdings Limited since its establishment in March 2025, broken down by financial year?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

2024/25: $2.0 million 2025/26: $19.8 million

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • Which components of the Cook Strait Ferry Replacement Programme cost are based on long-range estimates rather than fixed or target outturn prices, and what is the combined value of those components?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

The approved scope of work in the ferry replacement programme is funded to P85 levels based on target outturn prices.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What contingency is held within the $1.704 billion taxpayer contribution to the Cook Strait Ferry Replacement Programme, and how much of that contingency, if any, has been drawn down to date?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

We have already answered this question. There is approximately 20% of that amount held as contingency and the programme is funded to P85 levels. No contingency has been drawn to date.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • On what basis is the claimed saving of approximately $2.3 billion against Project iReX calculated, including the assumed iReX total cost, the price basis or reference year used, and whether the figure is expressed in nominal or real terms?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

$4 billion minus $1.7 billion equals $2.3 billion.