Awaiting reply Question 40021 (2026)
Question published

40021 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Asset Remediation Programme, Palmerston North Hospital, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40020 (2026)
Question published

40020 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Asset Remediation Programme, Palmerston North Hospital currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40019 (2026)
Question published

40019 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Asset Remediation Programme, Palmerston North Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40018 (2026)
Question published

40018 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Asset Remediation Programme, Palmerston North Hospital, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40017 (2026)
Question published

40017 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Asset Remediation Programme, Palmerston North Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40016 (2026)
Question published

40016 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Asset Remediation Programme, Palmerston North Hospital currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40015 (2026)
Question published

40015 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Project Whakatupuranga (Nelson Hospital Redevelopment), if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40014 (2026)
Question published

40014 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Project Whakatupuranga (Nelson Hospital Redevelopment) recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40013 (2026)
Question published

40013 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Project Whakatupuranga (Nelson Hospital Redevelopment) experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40012 (2026)
Question published

40012 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Project Whakatupuranga (Nelson Hospital Redevelopment) at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40011 (2026)
Question published

40011 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Project Whakatupuranga (Nelson Hospital Redevelopment), if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40010 (2026)
Question published

40010 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Project Whakatupuranga (Nelson Hospital Redevelopment) first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40009 (2026)
Question published

40009 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Project Whakatupuranga (Nelson Hospital Redevelopment) at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40008 (2026)
Question published

40008 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Project Whakatupuranga (Nelson Hospital Redevelopment) increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and what…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40007 (2026)
Question published

40007 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Project Whakatupuranga (Nelson Hospital Redevelopment), if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40006 (2026)
Question published

40006 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Project Whakatupuranga (Nelson Hospital Redevelopment) currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40005 (2026)
Question published

40005 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Project Whakatupuranga (Nelson Hospital Redevelopment), and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40004 (2026)
Question published

40004 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Project Whakatupuranga (Nelson Hospital Redevelopment), if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40003 (2026)
Question published

40003 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks for Project Whakatupuranga (Nelson Hospital Redevelopment) are currently rated as deteriorating, and what is the nature of those deteriorating risks, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40002 (2026)
Question published

40002 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Project Whakatupuranga (Nelson Hospital Redevelopment), if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40001 (2026)
Question published

40001 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Project Whakatupuranga (Nelson Hospital Redevelopment) currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40000 (2026)
Question published

40000 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Boiler Replacement, Wairau Hospital Blenheim, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39999 (2026)
Question published

39999 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Boiler Replacement, Wairau Hospital Blenheim at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39998 (2026)
Question published

39998 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Boiler Replacement, Wairau Hospital Blenheim experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to recover the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39997 (2026)
Question published

39997 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Boiler Replacement, Wairau Hospital Blenheim recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39996 (2026)
Question published

39996 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Boiler Replacement, Wairau Hospital Blenheim first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39995 (2026)
Question published

39995 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Boiler Replacement, Wairau Hospital Blenheim at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39994 (2026)
Question published

39994 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Boiler Replacement, Wairau Hospital Blenheim, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39993 (2026)
Question published

39993 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Boiler Replacement, Wairau Hospital Blenheim increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and what were the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39992 (2026)
Question published

39992 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Boiler Replacement, Wairau Hospital Blenheim currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the reasons, if…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39991 (2026)
Question published

39991 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Boiler Replacement, Wairau Hospital Blenheim, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39990 (2026)
Question published

39990 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Boiler Replacement, Wairau Hospital Blenheim, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39989 (2026)
Question published

39989 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks for Boiler Replacement, Wairau Hospital Blenheim are currently rated as deteriorating, and what is the nature of those deteriorating risks, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39988 (2026)
Question published

39988 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Boiler Replacement, Wairau Hospital Blenheim, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39987 (2026)
Question published

39987 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Boiler Replacement, Wairau Hospital Blenheim, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39986 (2026)
Question published

39986 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Boiler Replacement, Wairau Hospital Blenheim currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39985 (2026)
Question published

39985 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Nelson Hospital ED Reconfiguration, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39984 (2026)
Question published

39984 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Nelson Hospital ED Reconfiguration experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to recover the schedule,…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39983 (2026)
Question published

39983 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Nelson Hospital ED Reconfiguration at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39982 (2026)
Question published

39982 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Nelson Hospital ED Reconfiguration first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39981 (2026)
Question published

39981 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Nelson Hospital ED Reconfiguration, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39980 (2026)
Question published

39980 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Nelson Hospital ED Reconfiguration recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39979 (2026)
Question published

39979 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Nelson Hospital ED Reconfiguration at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39978 (2026)
Question published

39978 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Nelson Hospital ED Reconfiguration increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and what were the reasons for…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39977 (2026)
Question published

39977 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Nelson Hospital ED Reconfiguration currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the reasons, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39976 (2026)
Question published

39976 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Nelson Hospital ED Reconfiguration, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39975 (2026)
Question published

39975 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Nelson Hospital ED Reconfiguration, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39974 (2026)
Question published

39974 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks for Nelson Hospital ED Reconfiguration are currently rated as deteriorating, and what is the nature of those deteriorating risks, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39973 (2026)
Question published

39973 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Nelson Hospital ED Reconfiguration, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39972 (2026)
Question published

39972 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Nelson Hospital ED Reconfiguration currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.