Written questions

Search written questions to Ministers and the replies they have received.

Showing 201 to 250 of 648 written questions.

Awaiting reply Question 40221 (2026)
Question published

40221 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40220 (2026)
Question published

40220 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40219 (2026)
Question published

40219 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40218 (2026)
Question published

40218 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved,…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40217 (2026)
Question published

40217 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40216 (2026)
Question published

40216 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40215 (2026)
Question published

40215 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40214 (2026)
Question published

40214 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40213 (2026)
Question published

40213 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40212 (2026)
Question published

40212 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Ngā Puna Waiora High Voltage Infrastructure Upgrades, Wellington currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40211 (2026)
Question published

40211 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Wellington Regional Hospital ED Refurbishment - Enabling Works recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40210 (2026)
Question published

40210 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Wellington Regional Hospital ED Refurbishment - Enabling Works at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40209 (2026)
Question published

40209 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40208 (2026)
Question published

40208 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Wellington Regional Hospital ED Refurbishment - Enabling Works experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40207 (2026)
Question published

40207 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40206 (2026)
Question published

40206 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Wellington Regional Hospital ED Refurbishment - Enabling Works first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40205 (2026)
Question published

40205 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Wellington Regional Hospital ED Refurbishment - Enabling Works at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40204 (2026)
Question published

40204 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Wellington Regional Hospital ED Refurbishment - Enabling Works increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40203 (2026)
Question published

40203 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Wellington Regional Hospital ED Refurbishment - Enabling Works, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40202 (2026)
Question published

40202 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Wellington Regional Hospital ED Refurbishment - Enabling Works currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40201 (2026)
Question published

40201 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Wellington Regional Hospital ED Refurbishment - Enabling Works, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40200 (2026)
Question published

40200 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40199 (2026)
Question published

40199 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Wellington Regional Hospital ED Refurbishment - Enabling Works, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40198 (2026)
Question published

40198 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40197 (2026)
Question published

40197 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Wellington Regional Hospital ED Refurbishment - Enabling Works currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40196 (2026)
Question published

40196 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40195 (2026)
Question published

40195 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40194 (2026)
Question published

40194 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40193 (2026)
Question published

40193 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40192 (2026)
Question published

40192 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40191 (2026)
Question published

40191 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40190 (2026)
Question published

40190 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40189 (2026)
Question published

40189 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40188 (2026)
Question published

40188 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40187 (2026)
Question published

40187 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40186 (2026)
Question published

40186 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40185 (2026)
Question published

40185 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40184 (2026)
Question published

40184 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Acute Mental Health Unit Tranche 2 - Main Works, Lower Hutt currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40183 (2026)
Question published

40183 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Copper Pipes Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40182 (2026)
Question published

40182 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Copper Pipes Tranche 2, Wellington at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40181 (2026)
Question published

40181 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Copper Pipes Tranche 2, Wellington recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40180 (2026)
Question published

40180 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Copper Pipes Tranche 2, Wellington experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to recover the schedule,…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40179 (2026)
Question published

40179 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Copper Pipes Tranche 2, Wellington increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and what were the reasons for…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40178 (2026)
Question published

40178 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Copper Pipes Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40177 (2026)
Question published

40177 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Copper Pipes Tranche 2, Wellington first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40176 (2026)
Question published

40176 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Copper Pipes Tranche 2, Wellington at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40175 (2026)
Question published

40175 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Copper Pipes Tranche 2, Wellington currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the reasons, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40174 (2026)
Question published

40174 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Copper Pipes Tranche 2, Wellington, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40173 (2026)
Question published

40173 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Copper Pipes Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40172 (2026)
Question published

40172 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Copper Pipes Tranche 2, Wellington, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.