Showing 6701 to 6750 of 31958 written question sets.

Corrected reply

Question 33496 (2026)

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Takitimu North Link Stage 1, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

Corrected reply: I refer the Member to the attached document, which answers Written Questions 33496 (2026) to 33539 (2026), inclusive.

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Ōtaki to North of Levin, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Hawke's Bay Expressway, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date;…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Northland Corridor – Warkworth to Te Hana, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH1 Cambridge to Piarere, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH29 Tauriko (Ōmanawa Bridge), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Penlink O Mahurangi, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date;…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH1 Papakura to Drury, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date;…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Waihoehoe Road (Drury Upgrade), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH58 Safety Improvements Stage 2, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH2 Melling Transport Improvements, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for the Queenstown Package, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date;…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH75 Halswell Road improvements, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH1 Rolleston Access improvements Package 1 (roundabout), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH1 Rolleston Access improvements Package 2 (flyover), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH76 Brougham Street improvements Package 1 (bridge), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH76 Brougham Street improvements Package 2 (corridor), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for the Second Ashburton Bridge, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Northwest Busway – Te Ara Hauāuru Stage 1A, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for the Waikare Gorge realignment, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Lower North Island Rail Integrated Mobility (LNIRIM), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Eastern Busway Stage 4 (excluding Botany Station), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Auckland Level Crossings Removal – Takaanini, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Airport to Botany Busway Stage 2, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH1 Belfast to Pegasus Motorway and Woodend Bypass, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Mill Road Stage 1, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date; (d)…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Takitimu North Link Stage 2A, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH6 Hope Bypass Stage 1, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH1 Wellington Improvements, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Northland Corridor – Alternative to Brynderwyn Hills, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH29 Tauriko (wider scope), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Hamilton Southern Links, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Takitimu North Link Stage 2B, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH16 North-West Alternative Highway, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Northwest Busway – Te Ara Hauāuru Stage 1B and 2, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Northwest Busway – Te Ara Hauāuru Stage 3, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Northland Corridor – Te Hana to Whangārei (excluding Alternative to Brynderwyn Hills), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for the East-West Link, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date; (d)…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Mill Road – Alfriston to Drury (previously Stages 2 and 3), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Petone to Grenada, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date; (d)…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for SH6 Hope Bypass Stage 2, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Auckland Level Crossings Removal (including Western Line), of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for Airport to Botany Busway Stage 3 and 4, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • (matches this search)

    What is the status, for the Cross Valley Link, of (a) any notice of requirement or designation and its lapse date; (b) any resource consent or Fast-track approval and its lapse date; (c) total property acquired and property spend to date;…

Answered by

Hon Chris Bishop

Member for Hutt South · National Party · Minister of Transport

Answer

I refer the Member to my reply to Written Question 33496 (2026).

Question published
Reply lodged

Asked by

Jan Tinetti

List MP · Labour Party

Question

  • (matches this search)

    How many, if any, early childhood centres were in operation during the week of July 13th 2026; broken down by region?

Answered by

Hon David Seymour

Member for Epsom · ACT Party · Associate Minister of Education

Answer

I refer the Member to the attached table.

Question published
Reply lodged

Asked by

Jan Tinetti

List MP · Labour Party

Question

  • (matches this search)

    What advice, if any, has he received about Early Childhood Education during the week of July 13th 2026?

Answered by

Hon David Seymour

Member for Epsom · ACT Party · Associate Minister of Education

Answer

None.

Question published
Reply lodged

Asked by

Jan Tinetti

List MP · Labour Party

Question

  • (matches this search)

    How many, if any, children were attending early childhood centres during the week of July 13th 2026; broken down by region?

Answered by

Hon David Seymour

Member for Epsom · ACT Party · Associate Minister of Education

Answer

I refer the Member to the attached table showing the number of children attending early childhood centres during the week of 13 July 2026, as at 28 July 2026.

Question published
Reply lodged

Asked by

Jan Tinetti

List MP · Labour Party

Question

  • (matches this search)

    How many, if any, written directions have been issued by the Ministry of Education towards an Early Childhood Education centre during the week of July 13th 2026?

Answered by

Hon David Seymour

Member for Epsom · ACT Party · Associate Minister of Education

Answer

One.

Question published
Reply lodged

Asked by

Jan Tinetti

List MP · Labour Party

Question

  • (matches this search)

    How many, if any, Early Childhood Education centres got their licenses reclassified as a provisional license by the Ministry of Education during the week of July 13th 2026?

Answered by

Hon David Seymour

Member for Epsom · ACT Party · Associate Minister of Education

Answer

None.

Question published
Reply lodged

Asked by

Jan Tinetti

List MP · Labour Party

Question

  • (matches this search)

    How many, if any, Early Childhood Education centres got their licenses suspended by the Ministry of Education during the week of July 13th 2026?

Answered by

Hon David Seymour

Member for Epsom · ACT Party · Associate Minister of Education

Answer

None.