Awaiting reply Question 40176 (2026)
Question published

40176 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Copper Pipes Tranche 2, Wellington at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40175 (2026)
Question published

40175 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Copper Pipes Tranche 2, Wellington currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the reasons, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40174 (2026)
Question published

40174 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Copper Pipes Tranche 2, Wellington, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40173 (2026)
Question published

40173 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Copper Pipes Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40172 (2026)
Question published

40172 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Copper Pipes Tranche 2, Wellington, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40171 (2026)
Question published

40171 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Copper Pipes Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40170 (2026)
Question published

40170 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Copper Pipes Tranche 2, Wellington currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40169 (2026)
Question published

40169 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40168 (2026)
Question published

40168 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40167 (2026)
Question published

40167 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40166 (2026)
Question published

40166 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40165 (2026)
Question published

40165 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40164 (2026)
Question published

40164 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40163 (2026)
Question published

40163 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40162 (2026)
Question published

40162 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40161 (2026)
Question published

40161 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40160 (2026)
Question published

40160 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40159 (2026)
Question published

40159 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40158 (2026)
Question published

40158 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40157 (2026)
Question published

40157 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40156 (2026)
Question published

40156 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Renewal of Vertical Transport (Lifts) - Tranche 2, Wellington currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40155 (2026)
Question published

40155 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Interventional Radiology Unit Upgrade - Phase 3, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40154 (2026)
Question published

40154 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Interventional Radiology Unit Upgrade - Phase 3, Wellington at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40153 (2026)
Question published

40153 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Interventional Radiology Unit Upgrade - Phase 3, Wellington experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40152 (2026)
Question published

40152 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Interventional Radiology Unit Upgrade - Phase 3, Wellington recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40151 (2026)
Question published

40151 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Interventional Radiology Unit Upgrade - Phase 3, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40150 (2026)
Question published

40150 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Interventional Radiology Unit Upgrade - Phase 3, Wellington at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40149 (2026)
Question published

40149 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Interventional Radiology Unit Upgrade - Phase 3, Wellington first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40148 (2026)
Question published

40148 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Interventional Radiology Unit Upgrade - Phase 3, Wellington currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40147 (2026)
Question published

40147 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Interventional Radiology Unit Upgrade - Phase 3, Wellington increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40146 (2026)
Question published

40146 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Interventional Radiology Unit Upgrade - Phase 3, Wellington, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40145 (2026)
Question published

40145 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Interventional Radiology Unit Upgrade - Phase 3, Wellington, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40144 (2026)
Question published

40144 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Interventional Radiology Unit Upgrade - Phase 3, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40143 (2026)
Question published

40143 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Interventional Radiology Unit Upgrade - Phase 3, Wellington, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40142 (2026)
Question published

40142 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Interventional Radiology Unit Upgrade - Phase 3, Wellington currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40141 (2026)
Question published

40141 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Maternity Ward and Neonatal Unit Upgrade, Lower Hutt, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40140 (2026)
Question published

40140 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Maternity Ward and Neonatal Unit Upgrade, Lower Hutt at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40139 (2026)
Question published

40139 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Maternity Ward and Neonatal Unit Upgrade, Lower Hutt, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40138 (2026)
Question published

40138 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Maternity Ward and Neonatal Unit Upgrade, Lower Hutt experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40137 (2026)
Question published

40137 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Maternity Ward and Neonatal Unit Upgrade, Lower Hutt first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40136 (2026)
Question published

40136 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Maternity Ward and Neonatal Unit Upgrade, Lower Hutt recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40135 (2026)
Question published

40135 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Maternity Ward and Neonatal Unit Upgrade, Lower Hutt at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40134 (2026)
Question published

40134 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Maternity Ward and Neonatal Unit Upgrade, Lower Hutt increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and what were…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40133 (2026)
Question published

40133 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Maternity Ward and Neonatal Unit Upgrade, Lower Hutt currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40132 (2026)
Question published

40132 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Maternity Ward and Neonatal Unit Upgrade, Lower Hutt, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40131 (2026)
Question published

40131 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Maternity Ward and Neonatal Unit Upgrade, Lower Hutt, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40130 (2026)
Question published

40130 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Maternity Ward and Neonatal Unit Upgrade, Lower Hutt, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40129 (2026)
Question published

40129 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Maternity Ward and Neonatal Unit Upgrade, Lower Hutt, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40128 (2026)
Question published

40128 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Maternity Ward and Neonatal Unit Upgrade, Lower Hutt currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 40127 (2026)
Question published

40127 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Radiology Facilities Redevelopment, Hawke's Bay Hospital at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health