Awaiting reply Question 39953 (2026)
Question published

39953 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Mental Health Unit, Greymouth Hospital first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39952 (2026)
Question published

39952 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Mental Health Unit, Greymouth Hospital at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39951 (2026)
Question published

39951 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Mental Health Unit, Greymouth Hospital experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to recover the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39950 (2026)
Question published

39950 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Mental Health Unit, Greymouth Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39949 (2026)
Question published

39949 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Mental Health Unit, Greymouth Hospital at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39948 (2026)
Question published

39948 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Mental Health Unit, Greymouth Hospital increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and what were the reasons…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39947 (2026)
Question published

39947 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Mental Health Unit, Greymouth Hospital currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the reasons, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39946 (2026)
Question published

39946 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Mental Health Unit, Greymouth Hospital, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39945 (2026)
Question published

39945 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Mental Health Unit, Greymouth Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39944 (2026)
Question published

39944 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Mental Health Unit, Greymouth Hospital, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39943 (2026)
Question published

39943 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks for Mental Health Unit, Greymouth Hospital are currently rated as deteriorating, and what is the nature of those deteriorating risks, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39942 (2026)
Question published

39942 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Mental Health Unit, Greymouth Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39941 (2026)
Question published

39941 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Mental Health Unit, Greymouth Hospital currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39940 (2026)
Question published

39940 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Christchurch Hospital Redevelopment, Tower 3, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39939 (2026)
Question published

39939 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Christchurch Hospital Redevelopment, Tower 3 experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to recover the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39938 (2026)
Question published

39938 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Christchurch Hospital Redevelopment, Tower 3 at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39937 (2026)
Question published

39937 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Christchurch Hospital Redevelopment, Tower 3 recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39936 (2026)
Question published

39936 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Christchurch Hospital Redevelopment, Tower 3, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39935 (2026)
Question published

39935 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Christchurch Hospital Redevelopment, Tower 3 first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39934 (2026)
Question published

39934 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Christchurch Hospital Redevelopment, Tower 3 at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39933 (2026)
Question published

39933 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Christchurch Hospital Redevelopment, Tower 3 increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and what were the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39932 (2026)
Question published

39932 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Christchurch Hospital Redevelopment, Tower 3 currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the reasons, if…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39931 (2026)
Question published

39931 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Christchurch Hospital Redevelopment, Tower 3, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39930 (2026)
Question published

39930 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Christchurch Hospital Redevelopment, Tower 3, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39929 (2026)
Question published

39929 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Christchurch Hospital Redevelopment, Tower 3, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39928 (2026)
Question published

39928 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks for Christchurch Hospital Redevelopment, Tower 3 are currently rated as deteriorating, and what is the nature of those deteriorating risks, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39927 (2026)
Question published

39927 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Christchurch Hospital Redevelopment, Tower 3, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39926 (2026)
Question published

39926 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Compliance Works Programme, Christchurch Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39925 (2026)
Question published

39925 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Christchurch Hospital Redevelopment, Tower 3 currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39924 (2026)
Question published

39924 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Compliance Works Programme, Christchurch Hospital at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39923 (2026)
Question published

39923 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Compliance Works Programme, Christchurch Hospital experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to recover…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39922 (2026)
Question published

39922 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Compliance Works Programme, Christchurch Hospital recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39921 (2026)
Question published

39921 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Compliance Works Programme, Christchurch Hospital first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39920 (2026)
Question published

39920 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Compliance Works Programme, Christchurch Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39919 (2026)
Question published

39919 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Compliance Works Programme, Christchurch Hospital at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39918 (2026)
Question published

39918 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How is Compliance Works Programme, Christchurch Hospital currently tracking against its approved budget - is the project within budget, forecast to overspend, or underspent, if overspending is forecast, by how much and what are the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39917 (2026)
Question published

39917 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has the approved budget for Compliance Works Programme, Christchurch Hospital increased since funding was first approved, if so, by how much has the budget increased in total, on what dates were budget increases approved, and what were the…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39916 (2026)
Question published

39916 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Is there any underspend currently recorded or forecast for Compliance Works Programme, Christchurch Hospital, if so, what is the value of the underspend and what is the reason for it, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39915 (2026)
Question published

39915 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current overall RAG (Red/Amber/Green) status of Compliance Works Programme, Christchurch Hospital, and what are the individual RAG ratings for schedule, budget, and scope, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39914 (2026)
Question published

39914 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks are currently open for Compliance Works Programme, Christchurch Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39913 (2026)
Question published

39913 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

How many risks for Compliance Works Programme, Christchurch Hospital are currently rated as deteriorating, and what is the nature of those deteriorating risks, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39912 (2026)
Question published

39912 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Does Compliance Works Programme, Christchurch Hospital currently require any ministerial decisions or approvals in order to proceed, if so, what decisions are required and when are they needed, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39911 (2026)
Question published

39911 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

When was the Minister of Health last formally briefed or updated on the progress of Compliance Works Programme, Christchurch Hospital, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39910 (2026)
Question published

39910 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current projected completion date, or opening / go-live date, for Hillmorton Acute Adult Facility, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39909 (2026)
Question published

39909 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original projected completion date, or opening / go-live date, for Hillmorton Acute Adult Facility at the time funding was first approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39908 (2026)
Question published

39908 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Has Hillmorton Acute Adult Facility experienced any delays to its planned timeline, if so, by how long has the project been delayed in total, what are the reasons for each delay, and what steps are being taken to recover the schedule, if…

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39907 (2026)
Question published

39907 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

Were any delays to Hillmorton Acute Adult Facility recorded during the period prior to December 2023, if so, what were those delays, what caused them, and how long did they extend the project timeline, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39906 (2026)
Question published

39906 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

On what date was funding for Hillmorton Acute Adult Facility first approved, and by which government or Cabinet decision was that funding approved, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39905 (2026)
Question published

39905 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What is the current total approved budget for Hillmorton Acute Adult Facility, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

No reply has been published yet.

Awaiting reply Question 39904 (2026)
Question published

39904 (2026). Hon Dr Ayesha Verrall to the Minister of Health

Asked by

Ayesha Verrall

List MP · Labour Party

Question

What was the original approved budget for Hillmorton Acute Adult Facility at the time funding was first established, if any?

For answer by

Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer