Asked by
Tangi Utikere
Member for Palmerston North · Labour Party
Questions
-
36211
What is the status of the tolling decision for the Warkworth to Te Hana expressway following the public consultation that closed on 15 April 2026, and when does he expect to make a recommendation to Cabinet, if at all?
-
36212
What is the forecast net toll revenue from the Warkworth to Te Hana expressway after collection and enforcement costs, and over what period was the proposed tolling scheme consulted on between 16 March and 15 April 2026 assumed to operate?
-
36213
What are the forecast toll collection and enforcement costs for the Warkworth to Te Hana expressway over the proposed tolling period, if any, and what proportion of forecast gross toll revenue do those costs represent?
-
36214
What is the forecast gross toll revenue from the Warkworth to Te Hana expressway over the proposed tolling period, if any, in nominal terms, and what is that figure in net present value terms?
-
36215
What reduction in heavy vehicle movements through Wellsford and Te Hana is forecast under the tolling scheme consulted on between 16 March and 15 April 2026, and what reduction is forecast under an untolled scenario?
-
36216
What travel-time savings per vehicle are forecast for the Warkworth to Te Hana expressway under the tolling scheme consulted on between 16 March and 15 April 2026, and what savings are forecast under an untolled scenario?
Show the remaining 5 questions
-
36217
What reduction in deaths and serious injuries over the life of the Warkworth to Te Hana expressway is forecast under the tolling scheme consulted on between 16 March and 15 April 2026, and what reduction is forecast under an untolled scenario, given that he stated on 30 July 2026 that the benefits are expected to include 145 fewer deaths and serious injuries?
-
36218
What proportion of forecast Warkworth to Te Hana expressway traffic is projected to divert to untolled alternative routes under the tolling scheme consulted on between 16 March and 15 April 2026, and which routes are those?
-
36219
What are the forecast traffic volumes on the existing State Highway 1 through Wellsford and Te Hana under the tolling scheme consulted on between 16 March and 15 April 2026, and what are the forecast volumes under an untolled scenario?
-
36220
What are the forecast annual traffic volumes on the Warkworth to Te Hana expressway under the tolling scheme consulted on between 16 March and 15 April 2026, and what are the forecast volumes under an untolled scenario?
-
36221
What is the benefit-cost ratio for the Warkworth to Te Hana project with the tolling scheme consulted on between 16 March and 15 April 2026 in place, and what is the benefit-cost ratio with no tolling?
Answered by
Hon Chris Bishop
Member for Hutt South · National Party · Minister of Transport
Answer
NZTA consulted on a tolling proposal for the Warkworth to Te Hana Expressway between 16 March and 15 April 2026. A wide range of information is publicly available, on the NZTA website at: https://nzta.govt.nz/projects-and-consultations/have-your-say/past-consultations/northland-corridor-ara-tuhono-warkworth-to-te-hana-tolling-consultation I have not yet received a briefing from NZTA to consider the options on tolling Warkworth to Te Hana and therefore no decision has been made.