Skip to main content

What is the estimated cost of the new linkspan, linkspan approach structure and passenger walkway required at Wellington, which Ferry Holdings Limited's Statement of Performance Expectations 2026/27 states were initially envisaged to be reused but were found to be technically infeasible to reuse?

Answered Question 33722 (2026)
Question published
Reply lodged

Asked by

Tangi Utikere

Member for Palmerston North · Labour Party

Question

  • What is the estimated cost of the new linkspan, linkspan approach structure and passenger walkway required at Wellington, which Ferry Holdings Limited's Statement of Performance Expectations 2026/27 states were initially envisaged to be reused but were found to be technically infeasible to reuse?

Answered by

Rt Hon Winston Peters

List MP · NZ First · Minister for Rail

Answer

This information cannot be disclosed as it is a current commercial activity. To the extent that information can be released, Ferry Holdings is doing so as and when appropriate through its public reporting.