On what date was he first advised that Middlemore Hospital's rapid build ward was unlikely to be operational in the second half of 2026? and 4 other questions

Answered 5 questions (2026)
Questions published
See individual question dates
Reply lodged

Asked by

Ayesha Verrall

List MP · Labour Party

Questions

  • 33101

    Question published

    On what date was he first advised that Middlemore Hospital's rapid build ward was unlikely to be operational in the second half of 2026?

  • 33102

    Question published

    On what date was he first advised that Wellington Regional Hospital's rapid build ward was unlikely to be operational in the second half of 2026?

  • 33103

    Question published

    On what date was he first advised that the Waikato rapid build ward was unlikely to be operational in the second half of 2026?

  • 33105

    Question published

    On what date did he first receive advice that helicopter noise at the preferred Waikato location could affect the design or occupancy of its proposed rapid build ward?

  • 33239

    Question published

    On what date did he first receive advice that additional acoustic testing had extended the design phase at Waikato Hospital?

    Original response/referral lodged:

Answered by

Hon Simeon Brown

Member for Pakuranga · National Party · Minister of Health

Answer

The 28-bed rapid-build unit is going ahead at Waikato Hospital, part of 140 new beds across five of the country’s busiest hospitals. The site beside the helipad is confirmed, designs are being finalised, funding for the staff is approved. Nothing has been cut or cancelled. Building a ward inside a live hospital means getting site selection and clinical safety right before a single patient goes through the door. No responsible government cuts corners on that, and that is why work has been underway to engage with clinical leaders on the project. That work has taken longer than first anticipated, and we have never pretended otherwise. Labour scrapped the health targets, spent six years restructuring bureaucracy instead of building capacity, and left the wards unbuilt. With regard to the Member's specific question, I receive regular written and verbal updates from Health New Zealand on the progress of the Interim Inpatient Units. As such, it is not possible to provide a specific date as to when I was first made aware of any date changes.